For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-5-3 — Permit Required for Work in the Public Right-of-way and Public Easements

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 8-5-3

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/7c7f1bbe-d784-42c5-8d9e-46ce1a856cdd

8-5-3. - Permit Required for Work in the Public Right-of-way and Public Easements.

(a) Work in Right-of-way or Public Easement Prohibited Without Permit: No person shall undertake or permit to be undertaken any work in the public right-of-way or a public easement without first obtaining a permit from the city as set forth in this chapter, unless such work is exempt under the provisions of Section 8-5-17, "Work in the Public Right-of-way or Public Easement Exempt from Required Permit," B.R.C. 1981, or involves sidewalk construction as permitted under Section 8-2-18, "Permit for Sidewalk Construction Required," B.R.C. 1981. (b) Display of Permit: No person shall fail to maintain applicable permits, including, without limitation, a right-of-way permit, state highway access or utility permit, floodplain development permit, wetland permit, erosion control permit, and temporary traffic closure authorization, along with associated project documents, including, without limitation, approved engineering construction drawings or site plans, a temporary traffic control plan and an erosion control plan, on the job site. All documents shall be made available for inspection upon request by any officer or employee of the city. (c) Work Consistent With the Permit: No permittee shall work in an area larger or at a location different from that specified in the approved permit. If it becomes necessary to work in a larger or different area than originally requested under the application, the permittee shall obtain authorization from the city manager, prior to proceeding with the work. The permittee shall submit a supplementary application for the additional work within twenty-four hours. (d) Permits Are Not Transferrable: Permits shall not be transferable or assignable. The permittee may subcontract the work to be performed under a permit, provided that the holder of the permit shall be and remain responsible for the performance of the work under the permit and provide all insurance and financial security as required. Ordinance Nos. 7687 (2009); 8323 (2019)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.