§ 9-186 — Permit procedures
Code of Ordinances of the City of Pasadena, Texas (Supp. No. 33, Update 2: codified through Ordinance No. 2026-143, enacted September 1, 2026) · Pasadena City Code § 9-186
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/7df37d1e-d17a-4e10-9269-8c154655309a
Sec. 9-186. - Permit procedures.
(a) Application for a floodplain development permit shall be presented to the city floodplain administrator or their designee, and will include two (2) complete sets of engineer sealed plans drawn to scale, a vicinity map, North arrow, existing site topography and illustrate all proposed structures, proposed topography, FEMA-determined 100-year base flood elevations and 500-year flood elevations as determined from effective FIS, benchmarks and description of benchmark location, lot dimensions, adjacent streets, centerline elevation of adjacent streets, drainage facilities, areas of grading, fill placement and volume, existing and proposed elevations, excavation, detention ponds, mitigation ponds and other features pertinent to this proposed development, including a storm water pollution prevention plan. Detention and mitigation ponds will include pond cross sections, pond details and engineer sealed calculations. (b) A commercial development permit shall be presented to the building official on forms furnished by the permit department and will include the approved floodplain development permit and approved plans. Additionally, the following information is required: (1) Elevation in relation to mean sea level of the lowest floor (including basement) of all proposed structures; (2) Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed; (3) A certificate from a registered professional engineer or architect that the nonresidential floodproofed structure shall meet the floodproofing criteria of section 9-189(2); (4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development; (5) Maintain a record of all such information in accordance with section 9-183(a) [section 9-185(1)]. (b) Approval or denial of a floodplain development permit or construction permit by the floodplain administrator shall be based on all of the provisions of this article and the following relevant factors: (1) The danger to life and property due to flooding or erosion damage; (2) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (3) The danger that materials may be swept onto other lands to the injury of others; (4) The compatibility of the proposed use with existing and anticipated development; (5) The safety of access to the property in times of flood for ordinary and emergency vehicles; (6) The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical and water systems; (7) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; (8) The necessity to the facility of waterfront locations, where applicable; (9) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; (10) The relationship of the proposed use to the comprehensive plan for that area; (11) The floodplain administrator may revoke a permit or approval issued under the provisions of this regulation, in cases where there has been any false statement or misrepresentation as to a material fact in the application or plans upon which the permit or approval was based; (12) Upon notice from the floodplain administrator that work on any building, structure, dike, bridge or any improvement which would affect water drainage, is being done contrary to the provisions of this regulation, or in a dangerous or unsafe manner, such work shall be immediately stopped. Such notice shall be in writing and shall be given to the owner of the property or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. Where an emergency exists, no written notice shall be required to be given by the floodplain administrator, provided written notice shall follow within twenty-four (24) hours from the time oral notice to stop work is issued; (13) The floodplain administrator, or his duly authorized representative, may enter any building, structure, or premises to perform any duties imposed upon him by this regulation; (14) Penalty. No structure or land shall hereafter be constructed, located, extended, converted, or altered without full compliance with the terms of this article and other applicable regulations. Violation of the provisions of this article by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Any person who violates this article or fails to comply with any of its requirements shall upon conviction thereof be fined not less than five hundred dollars ($500.00) or more than two thousand dollars ($2,000.00) for each violation per day. Nothing herein contained shall prevent the City of Pasadena from taking such other lawful action as is necessary to prevent or remedy any violation.
(Ord. No. 20-186, § 1(Exh. 1), 1-5-21)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
