Tuscaloosa Code of Ordinances § 6-115 Schedule of permit fees.
Sec. 6-115. - Schedule of permit fees.
(a) On all buildings, structures, electrical, plumbing, and mechanical and gas systems or alterations requiring a permit, fees shall be paid as required at the time of filing the application.
(b) Fee schedule. On all buildings, structures, additions or alterations requiring a building permit, a fee for each building permit shall be paid at the time of filing application, in accordance with the following schedule:
(1) Residential. Three dollars and fifty cents ($3.50) per one thousand dollars ($1,000.00) valuations except for those permits listed in subsections (h) and (i).
(2) Commercial. The building valuation multiplier (BVM) effective October 1, 2014 shall be ten dollars and eighty-eight cents ($10.88) per one thousand dollar ($1,000.00) valuation. The minimum fee for commercial permits shall be fifty dollars ($50.00). The BVM automatically adjusted at the start of each fiscal year in an amount equal to the annualization consumer price index (CPI) using the south urban CPI from the U.S. Department of Labor released in January of each year.
(c) [Minimum fees.] No building permit shall be issued for less than the minimum fee of twenty-one dollars ($21.00) for residential and twenty-six dollars ($26.00) nonresidential demolition permits.
(d) Valuation. All fees for building permits other than a permit to demolish a building shall be calculated on a basis of the true total estimated valuation. In arriving at such true total estimated valuation, the building official shall first classify the type of construction and occupancy pursuant to the Building Code of Tuscaloosa. Valuations shall be based on the building valuation data tables provided by the International Code Council, Inc. (ICC), in effect on January 1 of each year. New building permit valuations may be based on the actual contract amount, if bona fide, as an alternative to the ICC building valuation data tables. Provide however, that the residential heated space evaluations shall be as follows for the years 2022 through 2025: 2022 one hundred thirty-three dollars ($133.00); 2023 not to exceed one hundred forty-three dollars ($143.00); 2024 not to exceed one hundred fifty-three dollars ($153.00); and 2025 not to exceed one hundred sixty-three dollars ($163.00).
(e) Projects with multiple general contractors shall designate one contractor or construction manager for obtaining and paying for a building permit. The building official shall have the authority to approve multiple permits and with multiple contractors for the same project.
(f) Federal, state or municipally owned buildings exempt from a building permit fee shall also be exempt from the following permit fees: Electrical, plumbing, mechanical, gas, temporary power and temporary gas.
(g) Temporary utilities permits shall be twenty dollars ($20.00).
(h) Residential utility permits. All residential utility permits (electrical, mechanical, plumbing, and gas) shall be fifty dollars ($50.00) and shall not be subject to the fees as provided in subsection 6-115(b)(1).
(i) Residential mobile home permits. Residential mobile home permits shall be fifty dollars ($50.00) and shall not be subject to the fees as provided in subsection 6-115(b)(1).
(j) Re-inspection fees pursuant to section 6-116(d)(3) shall be sixty-five dollars ($65.00) and specially scheduled inspections after regular working hours shall be one hundred twenty-five dollars ($125.00) per hour with a two (2) hour minimum.
(Ord. No. 6561, 12-18-03; Ord. No. 6775, § 1, 6-30-05; Ord. No. 7126, 8-28-07; Ord. No. 8178, §§ 1, 2, 2-3-15; Ord. No. 8338, § 6, 1-19-16; Ord. No. 9152, § 1, 12-21-21; Ord. No. 9169, §§ 1, 2, 1-11-22; Ord. No. 9548, § 3, 9-17-24)