Mesa City Code § 9-1-1 DEFINITION OF TERMS
9-1-1: - DEFINITION OF TERMS
CITY ENGINEER: The director of the City's Engineering Department and his or her designee. (5369)
DEVELOPMENT AND SUSTAINABILITY DIRECTOR: The director of the City's Development and Sustainability Department and his or her designee. (5369)
EASEMENT, PUBLIC: An area of land over which the City of Mesa coordinates the locations of public or private improvements, underground or overhead, furnished for the use of the public; including electricity, gas, steam, communication, telecommunications, data transmission, cable TV, water, storm drainage, sewage, sidewalks, landscaping, traffic signals, streetlights, flood control, etc. owned and operated by any person, firm, corporation, municipal department, or board duly authorized by state or municipal regulations. (3078, 3309)
ENGINEERING PLANS: Plans, profiles, cross sections, and other required details for the construction of public or private improvements within the right-of-way or public easements, prepared by a person, firm, company, corporation, public entity, or board in compliance with the code and rules of the Arizona State Board of Technical Registration, unless exempted thereunder; and conforming with (i) the public or private improvement standards of design and construction developed by the City Engineer; or (ii) standards developed by the person, firm, company, corporation, public entity, or board that the City Engineer accepts as substantially equivalent to the City Engineer's standards in protecting the public health, safety, and welfare; or (iii) in the case of a political subdivision of the State of Arizona, standards of design and construction developed and approved by such political subdivision and filed with the City Engineer. (3309, 3766, 5369)
MESA PROJECTS: Public improvement projects for which the City of Mesa is the general contracting agency. (3309)
NEW PAVEMENT: Paving material applied in or near the right-of-way to construct a new street, highway, alley, road or bikeway where no such material previously existed. (5369)
PAVEMENT RECONSTRUCTION: Rebuilding a portion of the street by removing all the pavement material and re-paving. (5369)
PAVEMENT RENOVATION: A major rehabilitation of street pavement, which includes mill and overlay, cold in place recycle, hot in place recycle, fractured aggregate surface treatment, cape seal, and stress absorbing membrane interlayer or other similar roadway improvement that physically modifies the surface of the roadway. (5369)
PAVEMENT RESTORATION FEE: The fee required by the City when a permittee cuts into, excavates, opens, bores, trenches, potholes, damages, or disturbs pavement in the right-of-way. (5369)
PERMIT CHARGES: Fees assessed at the time of issuance of a right-of-way permit that are intended to cover costs incurred by the City for permit processing, plan review services, materials testing and inspections. Refer to latest schedule of fees and charges. (4570, 5369)
PERMITTEE: The governmental entity, person, or business entity that has received a right-of-way permit pursuant to this section or engaged in construction or maintenance in the right-of-way. (5369)
RIGHT-OF-WAY: An area of land which by deed, conveyance, agreement, easement, dedication, usage or process of law is reserved or dedicated to the City for public purposes including, but not limited to, street, highway, alley, public utility, pedestrian walkway, bikeway, or drainage. Within public right-of-way, the City of Mesa coordinates the locations of public or private improvements, underground or overhead; including electricity, gas, steam, communication, telecommunications, data transmission, cable TV, water, storm drainage, sewage, sidewalks, landscaping, traffic signals, streetlights, flood control, pedestrian, roadway purposes, etc. owned and operated by any person, firm, company, corporation, municipal department, or board duly authorized by federal, state, or municipal regulations. (3078, 3309, 4570, 5369)
RIGHT-OF-WAY IMPROVEMENT STANDARDS: A set of regulations setting forth the details, specifications, instructions, and procedures to be followed in the planning, design, installation, and construction of public or private improvements within the right-of-way or within easements; formulated by the City Engineer, the County Health Department, the Maricopa Association of Governments, and other City departments. (3309, 3766, 5369)
RIGHT-OF-WAY PERMIT: An official document issued by the City authorizing performance of a specified activity or work within the right-of-way and public easements of the City of Mesa by a person, contractor, company, firm, or corporation duly qualified under the statutes and rules of the Arizona Registrar of Contractors, unless exempted thereunder. A Right-of-Way Permit may also authorize specified activity or work involving City utilities or facilities outside the corporate limits when issued in conjunction with the appropriate permit required for specified activity or work within another jurisdiction. (3078, 3309, 3766, 5369)
STREET MAINTENANCE: Application of slurry and fog seals to street pavement. (5369)
