For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1163.078 — Primary Power with Large Generation Service (Rate 23PC)

Columbus City Codes; partial (Supp. No. 86: codified through Ordinance No. 2063-2026, enacted July 2, 2026) · Columbus City Codes § 1163.078

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/918b3251-7078-4330-bfb3-a0b6311dd33b

1163.078 - Primary Power with Large Generation Service (Rate 23PC).

A. Availability. Available for customers establishing a maximum demand in excess of fifty (50) kW served at primary voltage and operating qualifying large generation facilities interconnected with the Division of Power system. Service under this schedule is limited to customers with approved cogeneration systems who continue to rely on the Division's distribution network for backup and supplemental power. B. Type of Service. 1. Alternating current, 60 hertz, three-phase, delivered at nominal voltages of 2,300, 7,200, 13,200, 13,800, or 14,400 volts. 2. The specific voltage and service characteristics shall be at the option of the Division of Power. C. Rates: 1. Customer Charge: $155.08 per month 2. Demand Charge (per kW of billing demand): $17.03 3. Energy Charge (per kWh): $0.05603 4. Capacity Charge (per kW of PLC per month): $11.56 5. Transmission Charge (per kW of NSPL per month): $12.43 All charges shall be reviewed monthly and or annually and adjusted as necessary to reflect updated costs, consistent with Section 1163.03. D. Determination of Demand Charge. The billing demand each month shall be the greater of: 1. The maximum measured demand (kW) during the month, or 2. The minimum billing demand established in the customer's service agreement, which is the average maximum measured demand (kW) of the twelve (12) months prior to the installation of the generation. E. Determination of Capacity and Transmission Charges. 1. Capacity Charge: Determined from the customer's contribution to the PJM peak load contribution (PLC). 2. Transmission Charge: Determined from the customer's contribution to the AEP transmission zone network service peak load (NSPL) for the preceding transmission year. 3. The Division shall update capacity and transmission charges monthly and or annually in accordance with published PJM rates. F. Minimum Charge. The minimum monthly charge shall be the sum of: 1. The customer charge; 2. The applicable billing demand charge based on contractual capacity; 3. Any applicable energy charges; 4. The applicable capacity charges; and 5. The applicable transmission charges. G. Applicability and Intent. 1. This rate is designed to recover all costs of service attributable to cogeneration customers, including distribution system operations, maintenance, and capital costs, while passing through wholesale energy, capacity, and transmission cost savings to the customer. 2. Customers served under this schedule will continue to rely on the Division's distribution network during cogeneration outages, and shall therefore pay demand-based distribution charges reflecting system capacity reserved for such use. H. Metering. Interval metering capable of recording hourly energy and demand is required to determine capacity and transmission contributions under this schedule. I. Contract Terms. 1. Service shall be provided only under a written agreement specifying the minimum billing demand, metering requirements, and interconnection terms. 2. The minimum term of contract shall be one (1) year unless otherwise approved by the Administrator. J. Payment Terms. Bills are net if paid within fifteen (15) days of the billing date. A delayed payment charge of five percent (5%) of the total bill, but not less than one dollar ($1.00), shall apply to all accounts not paid within the prescribed period. K. Charge Review. Component charges, including customer, energy, demand, capacity, and transmission rates, shall be reviewed monthly and or annually and may be revised by ordinance to ensure cost recovery and proper alignment with wholesale market rates.

(Ord. No. 3085-2025, § 1, 11-24-2025)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.