Sec. 82-102. - Underground power and communication lines.
Underground facilities shall be installed by accepted methods and practices and shall conform to all applicable codes, standards, and specifications.
(a) Location and alignment.
(1) Longitudinal installations.
The underground facilities shall be located parallel to and adjacent to the right-of-way line so as to minimize interference with drainage and maintenance of the roadside area.
In special cases where it is not feasible to locate the facility adjacent to the right-of-way line, the city and engineer may approve an alternate location. When this location is less than five feet outside of the shoulder of the roadway the utility must provide compaction reports that confirm trench compaction of 95 percent standard proctor density has been achieved or must install flowable fill to within six inches of the top of the trench.
(2) Pedestals or other underground utility appurtenances installed as a part of the buried cable facility shall be located outside the highway maintenance area.
(3) Road crossing installations should be located at right angles to the roadway.
(4) Roadway structures (culverts, boxes, etc.) are not to be used for road crossing installation.
(5) Unsuitable locations for underground road crossing installations such as in deep cuts, near bridge footings, across intersections at grade, at cross drains, and in rocky terrain should be avoided.
(6) All installations crossing hard surfaced or paved must be accomplished by jacking or boring. The cutting of the base and pavement structures by the open trench method will not be permitted.
(b) Depth of bury.
(1) Longitudinal lines should be installed at a depth of bury of not less than 24 inches below the ground surface where such installations are made outside of cut, ditch, or fill slope areas.
(2) Where longitudinal lines are place within cut, ditch or fill slope areas, the depth of bury shall be not less than 36 inches below the ground surface.
(3) Underground installations of road crossings should have a depth of bury of at least four feet below the road surface, and/or three feet below ditch bottom.
(c) Encased and unencased construction.
(1) Electric power or telephone cables must be encased when required by applicable codes and standards governing that particular utility. Encasement of all lines is encouraged for maintenance reasons, since the cutting of the pavement, base and subbase for maintaining or replacing the cables will not be permitted.
(2) Unencased cable crossings should be limited to small bores where soil conditions permit boring a hole about the same size of the cable and pulling the cable through.
(3) Where underground road crossing lines are encased in protective conduit, the encasement should extend a minimum of five feet beyond the toe of slope or to the ditch line. Where appropriate, the encasement should extend to a point outside of construction limits to allow for future widening of the highway facility.
(4) Where unencased bored installations are proposed, the utility shall furnish information as to controls and construction methods to be employed before the proposed installations are considered by the city.
(Ord. of 05-15-2007(2) )