Austin City Code § 25-6-261 PERMIT REQUIRED FOR A PROJECT.
§ 25-6-261 - PERMIT REQUIRED FOR A PROJECT.
(A) Except as provided by Subsection (C), a person must obtain a right-of-way construction permit to:
(1) construct, alter, repair, or remove a sidewalk, curb, gutter, driveway approach, or pedestrian way; or
(2) remove a tree from public right-of-way.
(B) A separate permit is required for each lot or tract of land on which activity described in Subsection (A) occurs.
(C) A permit is not required if the proposed construction:
(1) is performed in accordance with an approved site plan;
(2) is performed as part of the construction of a new subdivision if the construction:
(a) is included on the subdivision's approved street and drainage construction plans, and
(b) the proposed construction occurs at the time that construction of the street and drainage systems occurs; or
(3) is a minor repair or construction, as determined by the city manager; or
(4) will be performed by a public utility or franchise holder.
(D) The exemption provided by Subsection (C)(2) does not apply after the City accepts the street and drainage construction of a subdivision.
(E) A person may not transfer or assign a permit issued under this division.