P-719 — REHABILITATION OF BUILDING SEWERS

The Philadelphia Code (2026 Code: The Philadelphia Code and Home Rule Charter current through October 8, 2026) · Philadelphia Code § P-719

Corpus is an independent public-information project, not the official City of Philadelphia website. Stable reference: corpuslaw.us/code/9981e44d-b7df-47bd-8856-5fe60b0c7024

SECTION P-719 REHABILITATION OF BUILDING SEWERS

P-719.1 718.1 Cure-in-place. Sectional cure-in-place rehabilitation of building sewer piping and sewer service lateral piping shall be in accordance with ASTM F2599 and shall be limited to one- and two- family dwellings. Hydrophilic rings or gaskets in cure-in-place rehabilitation of building sewer piping and sewer service lateral piping shall be in accordance with ASTM F3240 to ensure water tightness and elimination of ground water penetration. P-719.2 Applicability. The cure-in-place rehabilitation of existing building sewer piping shall be limited to gravity drainage piping 4 inches (102 mm) in diameter and larger. The cure-in-place rehabilitation piping shall be of the same nominal size as the existing piping. P-719.3 Preinstallation requirements. Prior to commencement of the cure-in-place rehabilitation installation, the existing piping sections to be rehabilitated shall be descaled and cleaned. After the cleaning process has occurred and water has been flushed through the system, the piping shall be inspected internally by a recorded video camera survey. P-719.3.1 Preinstallation recorded video camera survey. The video survey shall include verification of the project address location. The video shall include notations of the cleanout and fitting locations, and the approximate depth of the existing piping. The video shall also include notations of the length of piping at intervals not greater than 25 feet (7620 mm). P-719.4 Permitting. A plumbing permit shall be issued by the Department of Licenses and Inspections for this work and the work shall be properly inspected. Proof satisfactory to the Department shall be provided that the PA One Call and any other applicable agency has been properly notified prior to issuing a permit for this work. Prior to permit issuance, the code official shall review and evaluate the preinstallation recorded video camera survey to determine if the piping system is capable of being relined in accordance with the proposed rehabilitation system manufacturer’s installation requirements and applicable referenced standards. P-719.5 Prohibited applications. Where review of the preinstallation recorded video camera survey reveals that piping systems are not installed correctly or defects exist, rehabilitation shall not be permitted. The defective portions of piping shall be exposed and repaired with pipe and fittings in accordance with this code. Defects shall include, but are not limited to, backgrade or insufficient slope, complete pipe wall deterioration or complete separations such as from tree root invasion or improper support. P-719.6 Cure in place rehabilitation materials. The rehabilitation materials shall be manufactured in compliance with applicable standards and certified as required in Section 303. P-719.7 Installation. The installation of cure in place rehabilitation materials shall be performed in accordance with the manufacturer’s installation instructions, applicable referenced standards and this code. P-719.7.1 Material data report. The installer shall record the data as required by the cure in place rehabilitation material manufacturer and applicable standards. The recorded data shall include, but is not limited to, the location of the project, rehabilitation material type, amount of product installed and conditions of the installation. A copy of the data report shall be provided to the code official prior to final approval. P-719.8 Post-installation recorded video camera survey. The completed, rehabilitated piping system shall be inspected internally by a recorded video camera survey after the system has been flushed and flow-tested with water. The video survey shall be submitted to the code official prior to finalization of the permit. The video survey shall be reviewed and evaluated to provide verification that no defects exist. Any defects identified shall be repaired and replaced in accordance with this code. P-719.9 Certification. A certification shall be provided in writing to the code official, from the permit holder, that the cure in place rehabilitation relining materials have been installed in accordance with the manufacturer’s installation instructions, the applicable standards and this code. P-719.10 Approval. Upon verification of compliance with the requirements of Sections P-719.1 through P-719.9, the code official shall approve the installation.

Ask a question about Philadelphia law

Corpus searches the Philadelphia sections it holds and shows the ones that match, with their citations. Free, no sign-in.