For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-10 — Review of new sources and modifications; permit for construction or major modification

Code of Ordinances of Kansas City, Missouri (Supp. No. 140, Update 1: codified through Ordinance No. 260692, enacted August 13, 2026) · Kansas City Code § 8-10

Corpus is an independent public-information project, not the official City of Kansas City website. Stable reference: corpuslaw.us/code/9b809674-ad51-4d42-bb5f-9c4eccf1c42e

Sec. 8-10. - Review of new sources and modifications; permit for construction or major modification.

This section defines sources which are required to obtain permits to construct. It establishes requirements to be met prior to construction or modification of any of these sources. This section also establishes permit fees and public notice requirements for certain sources and incorporates a means for unifying the processing of construction and operating permit issuance. (A) Applicability 1. Definitions. (a) Solely for the purposes of paragraph (A)1.(a) and subsection (G) of this section, the following definitions shall be used in place of the definitions of the same terms specified elsewhere in this subsection: (i) Major stationary source is defined in 40 CFR 51.165(a)(1)(iv), promulgated as of July 1, 2011, and hereby incorporated by reference in this section, as published by the Office of the Federal Register, U.S. National Archives and Records, 700 Pennsylvania Avenue NW, Washington, DC 20408. This section does not incorporate any subsequent amendments or additions. The term "major," as used in this definition, shall be major for the nonattainment pollutant. (ii) Major modification is defined in 40 CFR 51.165(a)(1)(v), promulgated as of July 1, 2011, and hereby incorporated by reference in this section, as published by the Office of the Federal Register, U.S. National Archives and Records, 700 Pennsylvania Avenue NW, Washington, DC 20408, except that any incorporated provisions that are stayed shall not apply. This section does not incorporate any subsequent amendments or additions. The term "major," as used in this definition, shall be major for the nonattainment pollutant. (iii) Net emissions increase is defined in 40 CFR 51.165(a)(1)(vi), promulgated as of July 1, 2011, and hereby incorporated by reference in this section, as published by the Office of the Federal Register, U.S. National Archives and Records, 700 Pennsylvania Avenue NW, Washington, DC 20408, except that the term paragraph (a)(1)(xii)(B) shall be 40 CFR 52.21(b)(21)(ii). This section does not incorporate any subsequent amendments or additions; and (iv) Significant is defined in 40 CFR 51.165(a)(1)(x), promulgated as of July 1, 2011, and hereby incorporated by reference in this section, as published by the Office of the Federal Register, U.S. National Archives and Records, 700 Pennsylvania Avenue NW, Washington, DC 20408. This section does not incorporate any subsequent amendments or additions. (b) Solely for the purposes of subsection (I) of this subsection, the following definitions shall be used in addition to definitions specified elsewhere in this subsection: i. Construct a major source: a. Fabricate, erect, or install, at any greenfield site, a stationary source or group of stationary sources which is located within a contiguous area and under common control and which emits or has the potential to emit ten tons per year of any hazardous air pollutant (HAP) or 25 tons per year of any combination of HAPs; or b. Fabricate, erect, or install, at any developed site, a new process or production unit which in and of itself emits or has the potential to emit ten tons per year of any HAP or 25 tons per year of any combination of HAPs; ii. Greenfield site—A contiguous area under common control that is an undeveloped site; iii. Process or production—Any collection of structures and/or equipment, that processes, assembles, applies, or otherwise uses material inputs to produce or store an intermediate or final product. A single facility may contain more than one process or production unit; iv. Reconstruct a major source—Replace components at an existing process or production unit where the replacement of components in and of itself emits or has the potential to emit ten tons per year of any HAP or 25 tons per year of any combination of HAPs, whenever: a. The fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be required to construct a comparable process or production unit; and b. It is technically and economically feasible for the reconstructed major source to meet the applicable maximum achievable control technology emission limitation for new sources established under this subsection; v. Research and development activities—Activities conducted at a research or laboratory facility whose primary purpose is to conduct research and development into new processes and products, where such source is operated under the close supervision of technically-trained personnel and is not engaged in the manufacture of products for sale or exchange for commercial profit, except in a de minimis manner; vi. Similar source—A stationary source or process that has comparable emissions and is structurally similar in design and capacity to a constructed or reconstructed major source such that the source could be controlled using the same control technology; and vii. Definitions for certain terms, other than those defined in subparagraphs (A)1.(b)(I) through (VI) of this section, may be found in 40 CFR 63.41, promulgated as of July 1, 2011, and hereby incorporated by reference in this section, as published by the Office of the Federal Register, U.S. National Archives and records, 700 Pennsylvania Avenue NW, Washington, DC 20408. This section does not incorporate any subsequent amendments or additions; (c) Nonattainment pollutant—Each and every pollutant for which the location of the source is in an area designated to be in nonattainment of a National Ambient Air Quality Standard (NAAQS) under section 107(d)(1)(A)(i) of the Act. Any constituent or precursor of a nonattainment pollutant shall be a nonattainment pollutant, provided that the constituent or precursor pollutant may only be regulated under this section as part of regulation of the corresponding NAAQS pollutant. Both volatile organic compounds (VOC) and nitrogen oxides (NO x ) shall be nonattainment pollutants for a source located in an area designated nonattainment for ozone; (d) Definitions for key words or phrases used in this section may be found in section 8-2. 2. Covered installations/changes. This section shall apply to installations with the potential to emit any pollutant in an amount equal to or greater than the de minimis levels. This section also shall apply to changes at installations which emit less than the de minimis levels where the construction or modification itself would be subject to subsections (F), (G), (H) or (I). This section shall apply to all incinerators, asphaltic concrete plants. (a) Emergency generators with an output greater than or equal to 185 kilowatts (kW): i. Facilities are required to possess a valid construction permit when adding or replacing emergency generators at the facility no later than 60 days after installation. ii. The emergency generator may not be operated more than 500 hours per year. iii. The emergency generator may not be operated in an effort to remove the facility from the grid (peak shaving) nor to supply electrical power to the grid. iv. Each emergency generator shall be equipped with a non-resettable hour meter. The meter must be maintained in good working condition. v. Diesel fuel used to power the generator shall contain no greater than 0.5 percent sulfur by weight. vi. Fuel delivery records must be maintained for five years. vii. Maintain a log of the running hours of the generator. viii. Total annual hours and fuel usage of emergency generators shall be reported to the Kansas City, Missouri Health Department's air quality program no later than April 1 of each year. 3. Construction/operation prohibited. No owner or operator shall commence construction, modification or major modification of any installation subject to this section, begin operation after that construction, modification or major modification, or begin operation of any installation which has been shut down longer than five years without first obtaining a permit from the director under this section. 4. Exempt emission units. The following combustion equipment is exempt from the requirements of this section if the equipment emits only combustion products, and the equipment produces less than 150 pounds per day of any air contaminant: (a) Any combustion equipment using exclusively natural or liquefied petroleum gas or any combination of these with a capacity of less than 10,000,000 British thermal units (BTUs) per hour heat input; or (b) Any combustion equipment with a capacity of less than 1,000,000 BTUs per hour heat input. (c) Drying or heat treating ovens with less than 10,000,000 BTUs per hour capacity provided the oven does not emit pollutants other than the combustion products and the oven is fired exclusively by natural gas, liquefied petroleum gas, or any combination thereof; and (d) Any oven with a total production of yeast leavened bakery products of less than 10,000 pounds per operating day heated either electrically or exclusively by natural gas firing with a maximum capacity of less than 10,000,000 BTUs per hour. 5. Other exemptions. The following establishments, systems, equipment and operations are also exempt from this section: i. Office and commercial buildings, where emissions result solely from space heating by natural or liquefied petroleum gas of less than 20,000,000 BTUs per hour heat input. Incinerators operated in conjunction with these sources are not exempt; ii. Comfort air conditioning or comfort ventilating systems not designed or used to remove air contaminants generated by, or released from, specific units of equipment; iii. Equipment used for any mode of transportation; iv. Livestock markets and livestock handling systems from which the only potential air contaminant is odorous gas; v. Any grain handling, storage and drying facility which: a. Is in noncommercial use only, that is, used only to handle, dry or store grain produced by the owner if: (1) The total storage capacity does not exceed 750,000 bushels; (2) The grain handling capacity does not exceed 4,000 bushels per hour; and (3) The facility is located at least 500 feet from any recreational area, residence or business not occupied or used solely by the owner; and b. Is in commercial use or noncommercial use and: (1) The total storage capacity of the new and any existing facility(ies) does not exceed 190,000 bushels; (2) Has an installation of additional grain storage capacity in which there is no increase in hourly grain handling capacity and that utilizes existing grain receiving and loadout equipment; or (3) Is a temporary installation used for temporary storage as a result of exceptional events (e.g., natural disasters or abundant harvests exceeding available storage capacity) that meets the following criteria: (4) Outside storage structures shall have a crushed lime or concrete floor with retaining walls of either constructed metal or concrete block. These structures may be either oval or round and must be covered with tarps while storing grain. These structures may be filled by portable conveyor or by spouts added from existing equipment; (5) Existing buildings may be filled by portable conveyors directly or by overhead fill conveyors that are already in the buildings; (6) The potential to emit from the storage structures is less than 100 tons of each pollutant; (7) The attainment or maintenance of ambient air quality standards is not threatened; and (8) There is no significant impact on any class I area. vi. Restaurants and other retail establishments for the purpose of preparing food for employee and guest consumption; vii. Equipment solely installed for the purpose of controlling fugitive dust; viii. Equipment or control equipment which eliminates all emissions to the ambient air; ix. Equipment (other than anaerobic lagoons) or control equipment which emits odors unless the equipment or control equipment also emits other regulated air pollutants; x. Residential wood heaters, cookstoves or fireplaces; xi. Laboratory equipment used exclusively for chemical and physical analysis or experimentation, except equipment used for controlling radioactive air contaminants; xii. Recreational fireplaces; and xiii. Stacks or vents to prevent the escape of sewer gases through plumbing traps for systems handling domestic sewage only. Systems which include any industrial waste do not qualify for this exemption. xiv. Noncommercial incineration of dead animals, the on-site incineration of resident animals for which no consideration is received or commercial profit is realized as authorized in RSMo 269.020.6; xv. The following miscellaneous activities: i. Use of office equipment and products, not including printing establishments or businesses primarily involved in photographic reproduction. This exemption is solely for office equipment that is not part of the manufacturing or production process at the installation; ii. Tobacco smoking rooms and areas; iii. Hand-held applicator equipment for hot melt adhesives with no volatile organic compound (VOC) in the adhesive formula; iv. Paper trimmers and binders; v. Blacksmith forges, drop hammers, and hydraulic presses; vi. Hydraulic and hydrostatic testing equipment; and vii. Environmental chambers, shock chambers, humidity chambers, and solar simulators provided no hazardous air pollutants are emitted by the process; a. The following internal combustion engines: i. Portable electrical generators that can be moved by hand without the assistance of any motorized or non-motorized vehicle, conveyance, or device; ii. Laboratory engines used in research, testing, or teaching; b. The following quarries, mineral processing, and biomass facilities: i. Drilling or blasting activities; ii. Concrete or aggregate product mixers or pug mills with a maximum rated capacity of less than 15 cubic yards per hour; iii. Riprap production processes consisting only of a grizzly feeder, conveyors, and storage, not including additional hauling activities associated with riprap production; iv. Sources at biomass recycling, composting, landfill, publicly owned treatment works (POTW), or related facilities specializing in the operation of, but not limited to, tub grinders powered by a motor with a maximum output rating of ten horsepower, hoggers and shredders and similar equipment powered by a motor with a maximum output rating of 25 horsepower, and other sources at such facilities with a total throughput less than 500 tons per year; and v. Land farming of soils contaminated only with petroleum fuel products where the farming beds are located a minimum of 300 feet from the property. c. The following kilns and ovens: i. Kilns with a firing capacity of less than 10,000,000 BTUs per hour used for firing ceramic ware, heated exclusively by natural gas, liquefied petroleum gas, electricity, or any combination thereof; and ii. Electric ovens or kilns used exclusively for curing or heat-treating provided no hazardous air pollutants (HAPs) or VOCs are emitted; xvi. The following food and agricultural operations to grow crops: i. Any equipment used in agricultural operations to grow crops; ii. Equipment used exclusively to slaughter animals. This exemption does not apply to other slaughterhouse equipment such as rendering cookers, boilers, heating plants, incinerators, and electrical power generating equipment; iii. Commercial smokehouses or barbecue units in which the maximum horizontal inside cross-sectional area does not exceed 20 square feet; iv. Equipment used exclusively to grind, blend, package, or store tea, cocoa, spices, or coffee; v. Equipment with the potential to dry, mill, blend, grind, or package less than 1,000 pounds per year of dry food products such as seeds, grains, corn, meal, flour, sugar, and starch; vi. Equipment with the potential to convey, transfer, clean, or separate less than 1,000 tons per year of dry food products or waste from food production operations; vii. Storage equipment or facilities containing dry food products that are not vented to the outside atmosphere or which have the potential to handle less than 1,000 tons per year; viii. Coffee, cocoa, and nut roasters with a roasting capacity of less than 15 pounds of beans or nuts per hour, and any stoners or coolers operated with these roasters; ix. Containers, reservoirs, tanks, or loading equipment used exclusively for the storage or loading of beer, wine, or other alcoholic beverages produced for human consumption; x. Brewing operations at facilities with the potential to produce less than three million gallons of beer per year; and xi. Fruit sulfuring operations at facilities with the potential to produce less than ten tons per year of sulfured fruits and vegetables; xvii. Batch solvent recycling equipment provided the recovered solvent is used primarily on-site, the maximum heat input is less than 1,000,000 BTUs per hour, the batch capacity is less than 150 gallons, and there are no solvent vapor leaks from the equipment which exceed 500 parts per million; xviii. The following surface coating and printing operations: i. Batch mixing of inks, coatings, or paints provided good housekeeping is practiced, spills are cleaned up as soon as possible, equipment is maintained according to manufacturer's instruction and property is kept clean. In addition, all waste inks, coating, and paints shall be disposed of properly. Prior to disposal, all liquid waste shall be stored in covered containers. This exemption does not apply to ink, coatings, or paint manufacturing facilities; ii. Any powder coating operation, or radiation cured coating operation where ultraviolet or electron beam energy is used to initiate a reaction to form a polymer network; iii. Any surface-coating source that employs solely non-refillable hand-held aerosol cans; and iv. Surface coating operations utilizing powder coating materials with the powder applied by an electrostatic powder spray gun or an electrostatic fluidized bed; xix. The following metal working and handling equipment: i. Carbon dioxide (CO 2 ) lasers, used only on metals and other materials that do not emit a HAP or VOC in the process; ii. Laser trimmers equipped with dust collection attachments; iii. Equipment used for pressing or storing sawdust, wood chips, or wood shavings; iv. Equipment used exclusively to mill or grind coatings and molding compounds in a paste form provided the solution contains less than one percent VOC by weight; v. Tumblers used for cleaning or deburring metal products without abrasive blasting; vi. Batch mixers with a rated capacity of 55 gallons or less provided the process will not emit hazardous air pollutants; vii. Equipment used exclusively for the mixing and blending of materials at ambient temperature to make water-based adhesives provided the process will not emit hazardous air pollutants; viii. Equipment used exclusively for the packaging of lubricants or greases; ix. Platen presses used for laminating provided the process will not emit hazardous air pollutants; x. Roll mills or calendars for rubber or plastics provided the process will not emit hazardous air pollutants; xi. Equipment used exclusively for the melting and applying of wax containing less than one percent VOC by weight; xii. Equipment used exclusively for the conveying and storing of plastic pellets; and xiii. Solid waste transfer stations that receive or load out less than 50 tons per day of nonhazardous solid waste; xx. The following liquid storage and loading equipment: i. Storage tanks and vessels having a capacity of less than 500 gallons; and ii. Tanks, vessels, and pumping equipment used exclusively for the storage and dispensing of any aqueous solution which contains less than one percent by weight of organic compounds. Tanks and vessels storing the following materials are not exempt: a. Sulfuric or phosphoric acid with an acid strength of more than 99 percent by weight; b. Nitric acid with an acid strength of more than 70 percent by weight; c. Hydrochloric or hydrofluoric acid with an acid strength of more than 30 percent by weight; or d. More than one liquid phase, where the top phase contains more than one percent VOC by weight; xxi. The following chemical processing equipment or operations: i. Storage tanks, reservoirs, pumping, and handling equipment, and mixing and packaging equipment containing or processing soaps, vegetable oil, grease, animal fat, and nonvolatile aqueous salt solutions, provided appropriate lids and covers are utilized; and ii. Batch loading and unloading of solid phase catalysts; xxii. Body repair and refinishing of motorcycle, passenger car, van, light truck, and heavy truck and other vehicle body parts, bodies, and cabs, provided: i. Good housekeeping is practiced; spills are cleaned up as soon as possible, equipment is maintained according to manufacturers' instructions, and property is kept clean. In addition, all waste coatings, solvents, and spent automotive fluids including, but not limited to, fuels, engine oil, gear oil, transmission fluid, brake fluid, antifreeze, fresh or waste fuels, and spray booth filters or water wash sludge are disposed of properly. Prior to disposal, all liquid waste shall be stored in covered containers. All solvents and cleaning materials shall be stored in closed containers; ii. All spray coating operations shall be performed in a totally enclosed filtered spray booth or totally enclosed filtered spray area with an air intake area of less than 100 square feet. All spray areas shall be equipped with a fan which shall be operated during spraying, and the exhaust air shall either be vented through a stack to the atmosphere or the air shall be recirculated back into the shop through a carbon adsorption system. All carbon adsorption systems shall be properly maintained according to the manufacturer's operating instructions, and the carbon shall be replaced at the manufacturer's recommended intervals to minimize solvent emissions; and iii. Spray booth, spray area, and preparation area stacks shall be located at least 80 feet away from any residence, recreation area, church, school, child care facility, or medical or dental facility; xxiii. Sawmills processing no more than 25 million board feet, green lumber tally of wood per year, in which no mechanical drying of lumber is performed, in which fine particle emissions are controlled through the use of properly engineered baghouses or cyclones, and which meet all of the following provisions: i. The mill shall be located at least 500 feet from any recreational area, school, residence, or other structure not occupied or used solely by the owner of the facility or the owner of the property upon which the installation is located; ii. All sawmill residues (sawdust, shavings, chips, bark) from debarking, planing, saw areas, etc., shall be removed or contained to minimize fugitive particulate emissions. Spillage of wood residues shall be cleaned up as soon as possible and contained such that dust emissions from wind erosion and/or vehicle traffic are minimized. Disposal of collected sawmill residues must be accomplished in a manner that minimizes residues becoming airborne. Disposal by means of burning is prohibited unless it is conducted in a permitted incinerator; and xxiv. Carving, cutting, routing, turning, drilling, machining, sawing, sanding, planing, buffing, or polishing solid materials, other than materials containing any asbestos, beryllium, or lead greater than one percent by weight as determined by Material Safety Data Sheets (MSDS), vendor material specifications and/or purchase order specifications, where equipment: i. Directs a stream of liquid at the point where material is processed; ii. Is used only for maintenance or support activity not conducted as part of the installation's primary business activity; iii. Is exhausted inside a building; or iv. Is ventilated externally to an operating cyclonic inertial separator (cyclone), baghouse, or dry media filter. Other particulate control devices such as electrostatic precipitators or scrubbers are subject to construction permitting or a permit-by-rule, unless otherwise exempted. 6. Excluded activities. This subsection does not apply to: (a) Routine maintenance, parts replacement or relocation of emissions units within the same installation which do not involve either any appreciable change either in the quality or nature, or any increase in either the potential to emit or the effect on air quality, of the emissions of any air contaminant. Solely for the purpose of illustrating this category of excluded activities without limiting the generality of the preceding liberal sentence, the following examples are given: i. Replacing the bags in a baghouse; ii. Replacing wires, plates, rappers, controls or electric circuitry in an electrostatic precipitator which does not measurably decrease the design efficiency of the unit; iii. Replacement of fans, pumps or motors which does not alter the operation of a source or performance of a control device; iv. Replacement of boiler tubes; v. Replacement of piping, hoods and ductwork; vi. Replacement of engines, compressors or turbines as part of a normal maintenance program. (b) Changes in a process or process equipment which do not involve installing, constructing or reconstructing an emissions unit or associated air cleaning devices, and that do not involve either any appreciable change either in the quality or nature, or any increase in either the potential to emit or the effect on air quality of the emissions of any air contaminant. Solely for the purpose of illustrating this category of excluded activities and without limiting the generality of the preceding liberal sentence, the following examples are given: i. Change in the supplier or formulation of similar raw materials, fuels, paints and other coatings; ii. Change in the sequence of the process; iii. Change in the method of raw material addition; iv. Change in the method of product packaging; v. Change in the process operating parameters; vi. Replacement of an identical or more efficient cyclone precleaner which is used as a precleaner in a fabric filter control system; vii. Installation of a floating roof on an open top petroleum storage tank; viii. Replacement of a fuel burner in a boiler with a more thermally efficient burner; ix. Lengthening a paint drying oven to provide additional curing time; or x. Changes in the location, within the storage area, or configuration of a material storage pile or material handling equipment. (c) Replacement of like-kind emission units that do not involve either any appreciable change either in the quality or nature, or any increase either in the potential to emit or the effect on air quality, of the emissions of any air contaminant. (d) The excluded activities in paragraphs (A)6.(a) through (c) reflect a presumption that existing emissions units which are changed or replaced by like-kind units shall be treated as having begun normal operation for purpose of the definition of actual emissions in section 8-2. (e) The following miscellaneous activities: i. Plant maintenance, and upkeep activities such as routine cleaning, janitorial services, use of janitorial products, grounds keeping, general repairs, architectural or maintenance painting, welding repairs, plumbing, roof repair, installing insulation, using air compressors and pneumatically operated equipment, and paving parking lots, provided these activities are not conducted as part of the installation's primary business activity; ii. Batteries and battery charging station; iii. Fire suppression equipment and emergency road flares iv. Plant maintenance, and upkeep activities such as routine cleaning, janitorial services, use of janitorial products, grounds keeping, general repairs, architectural or maintenance painting, welding repairs, plumbing, roof repair, installing insulation, using air compressors and pneumatically operated equipment, and paving parking lots, provided these activities are not conducted as part of the installation's primary business activity; v. Steam emissions from leaks, safety relief valves, steam cleaning operations, and steam sterilizers; vi. Any solvent cleaning or surface preparation source that employs only non-refillable handheld aerosol can. 7. Construction or modifications are exempt if they meet the requirements of paragraph (A)7.(b) of this section for each hazardous air pollutant and the requirements of paragraph (A)7(a), (A)7(b), or (A)7(d) of this section for each criteria pollutant. The director may require review of construction or modifications otherwise exempt under paragraph (A)7. of this section if the emissions of the proposed construction or modification will appreciably affect air quality or the air quality standards are appreciably exceeded or complaints involving air pollution have been filed in the vicinity of the proposed construction or modification. (a) At maximum design capacity the proposed construction or modification shall emit each pollutant at a rate of no more than the amount specified in table 1. Table 1. Insignificant Emission Exemption Levels Pollutant | Insignificance Level (lbs. per hr.) Particulate matter 10 micron (PM10) (emitted solely by equipment) | 1.00 Sulfur oxides (SOx) | 2.75 Nitrogen oxides (NOx) | 2.75 Volatile organic compounds (VOCs) | 2.75 Carbon monoxide (CO) | 6.88 (b) At maximum design capacity, the proposed construction or modification will emit a hazardous air pollutant at a rate of no more than one-half pound per hour, or the hazardous emission threshold as established in point (L)8., whichever is less. (c) Actual emissions of each criteria pollutant, except lead, will be no more than 876 pounds per year. (d) Actual emissions of volatile organic compounds that do not contain hazardous air pollutants will be no more than four tons per year. 8. Exceptions to excluded activities. The exclusion provisions of subsection (A)6. Of this section notwithstanding, shall apply to any construction, reconstruction, alteration or modification which: (a) Is expressly required by an operating permit; or (b) Is subject to federally-mandated construction permitting requirements set forth in subsections 8-10(G), (H) or (I), or any combination of these, of this subsection. (B) Unified review. When the construction or modification and operation of any installation requires a construction permit under this subsection, and an operating permit or its amendment, under section 8-11, the installation shall receive a unified construction and operating permit, or its amendment, and a unified review, hearing and approval process, unless the applicant requests in writing that the construction and operating permit, or its amendment, be reviewed separately. Under this unified review process, the applicant shall submit all the applications, forms and other information required by the permitting authority. 1. Review of applications. The permitting authority shall complete any unified review within 184 days, as provided under the procedures of this section and section 8-11, operating permits required. 2. Issuance of permits. As soon as the unified review process is completed, if the applicant complies with all applicable requirements under this section and section 8-11, the construction permit and the operating permit, or its amendment, shall be issued to the applicant and the applicant may commence construction. The operating permit shall be retained by the permitting authority until validated pursuant to this section. 3. Validation and operating permits. Within 180 days after commencing operation, the holder of an operating permit, or its amendment, issued by the unified review process shall submit to the permitting authority all information required by the permitting authority to demonstrate compliance with the terms and conditions of the issued operating permit, or its amendment The permittee shall also provide information identifying any applicable requirements which became applicable subsequent to issuance of the operating permit, or its amendment. Within 30 days after the applicant's request for validation, the permitting authority will take action denying or approving validation of the issued operating permit, or its amendment. If the permittee demonstrates compliance with both the construction and operating permits, or its amendment, the permitting authority shall validate the operating permit, or its amendment, and forward it to the permittee. No part 70 permit will be validated unless: (a) At the time of validation, the permitting authority certifies that the issued permit contains all applicable requirements; or (b) The procedures for permit renewal have occurred prior to validation to insure the inclusion of any new applicable requirements to which the part 70 permit is subject. (C) Temporary installations and pilot plants permits. The permitting authority may exempt temporary installations and pilot plants having a potential to emit under 100 tons per year of each pollutant from any of the requirements of this section, provided that these exemptions are requested in writing prior to the start of construction. These exemptions shall be granted only when the attainment or maintenance of ambient air quality standards is not threatened, when there will be no significant impact on any class I area, and when the imposition of requirements of this rule would be unreasonable. (D) Portable equipment permits. Portable equipment must meet the following criteria: 1. The potential to emit is less than 100 tons per year of any air pollutant; 2. The equipment was permitted previously under either subsection (E), (F), (G) or (H) and the previous permit is still valid; 3. The equipment is operated and maintained in a manner identical to that specified in the currently valid permit; and 4. The following conditions must be met when permitted portable equipment is to be operated at a different location: (a) When the owner or operator wishes to operate the portable equipment at a new location not previously permitted or at a location where other sources (either permanent or portable) are operating, the owner or operator shall submit to the director a portable source relocation request, property boundary plot plan and the equipment layout for the site. A relocation request is subject to the fees and the time frames specified in this subsection, except for the permit filing fee. The relocation request will be approved if it is determined that there will be no significant impact on any class I area or an area where air quality increments have been consumed. The director shall make the final determination and, if appropriate, approve the relocation request no later than 21 calendar days after receipt of the completed portable source relocation request; (b) When the owner or operator wishes to relocate the portable equipment to a site that is listed on the permit or on the amended permit (provided other sources are not approved to operate at the same location), the owner or operator shall report the move to the director on a portable source relocation request for authorization to operate in the new locale as soon as possible, but not later than seven calendar days prior to ground breaking or initial equipment erection. No fees are associated with this authorization. Authorization will be presumed if notification of denial is not received by the specified ground breaking or equipment erection date; and (c) The equipment shall be operated at each new location no more than 24 consecutive months without an intervening relocation. (E) De minimis permits. 1. Any construction or modification at an installation subject to this section which results in a net emissions increase below the de minimis levels shall be exempt from the further requirements of this section if owner or operator of the source applies for, and the director issues a de minimis permit for that installation. 2. This de minimis permit shall be issued and remain in effect only if all of the following conditions are met: (a) The director is notified in writing of the proposed construction or modification prior to the commencement of construction; (b) Information is submitted to the director which is sufficient for the director to verify annual emission rate, to verify that no applicable emission control regulations will be violated, and to verify that the net emission increase of the installation is below the de minimis levels; (c) Net emissions do not increase above the de minimis levels established at an installation having a de minimis permit under this subsection. If net emissions at the installation do increase above the de minimis levels, the installation shall be in violation of this section until it obtains a permit under the other requirements of this section; (d) All permit fees are paid. 3. In order to eliminate the necessity for a large number of de minimis permit applications from a single installation, a special case de minimis permit may be issued for those batch-type production processes which frequently change products and component source operations. Operating in violation of the conditions of a special case de minimis permit shall be a violation of this section. 4. Air quality analysis requirements. (a) An air quality analysis will not be required for applications having a maximum design capacity emission rate of no more than the hourly de minimis level unless paragraph (E)4.(b) of this section applies. For applications having a maximum design capacity emission rate greater than the hourly de minimis level, a permit will be issued only if an air quality analysis demonstrates that the proposed construction or modification will not: i. Interfere with the attainment or maintenance of NAAQS and the air quality standards established in 10 CSR 10-6.010; or ii. Cause or contribute to ambient air concentrations in excess of any applicable maximum allowable increase listed in subsection (K)1. Table 1, of this section, over the baseline concentration in any attainment or unclassified area. (b) Exceptions. The director may require an air quality analysis for applications if it is likely that emissions of the proposed construction or modification will— i. Interfere with the attainment or maintenance of NAAQS and the air quality standards established in 10 CSR 10-6.010; ii. Cause or contribute to ambient air concentrations in excess of any applicable maximum allowable increase listed in subsection (K)1. Table 1, of this section, over the baseline concentration in any attainment or unclassified area; or iii. Result in complaints filed in the vicinity of the proposed construction or modification warrant an air quality analysis. (F) General in permit requirements for construction or emission increases greater than de minimis levels. 1. A permit shall be issued pursuant to this section only if it is determined that the proposed source operation or installation will not do one or more of the following: (a) Violate any of the applicable provisions of this section; (b) Interfere with the attainment or maintenance of ambient air quality standards established in 10 CSR 10-6.010; (c) Cause or contribute to ambient air concentrations in excess of any applicable maximum allowable increase listed in subsection (K)1., of this section, over the baseline concentration in any attainment or unclassified area; (d) Violate any applicable requirements of Air Conservation Law; and (e) Cause an adverse impact on visibility in any class I area (those designated in paragraph (L)7.(c)) 2. In order for the director to make this determination, each applicant shall: (a) Complete and submit application forms supplied by the director. These forms shall consist of a "permit to construct" and an "emissions inventory questionnaire" for the proposed change or modification. Both forms shall be completed such that all information necessary for processing the permit is supplied. (b) Send to the director as part of the application: site information; plans; descriptions; specifications; and drawings showing the design of the installation, the nature and amount of emissions of each pollutant, and the manner in which it will be operated and controlled. (c) Supply ambient air quality modeling data for the pollutant to determine the air quality impact of the installation on the applications with the potential to emit 50 tons per year or more of particulate matter or sulfur dioxide. The modeling techniques to be used are as specified in the most recent version of the Environmental Protection Agency's (EPA) Guideline on Air Quality Models (EPA 450/2-78-027R), including supplements at the time of application, or another model which the director deems accurate. Temporary installations and portable equipment shall be exempt from this requirement provided that the source shall apply best available control technology (BACT) for each pollutant emitted in a significant amount. (d) Furnish any additional information, plans, specifications, evidence, documentation, modeling or monitoring data that the director may require to complete the review under this subsection. (e) Submit fees for the filing and processing of their permit application. The amount of the fee will be determined from section 8-20. (f) In addition to review fees as determined from section 8-20, the applicant shall pay for any publication of notice required by this subsection, and shall pay for the original and one copy of the transcript, to be filed with the director, of any hearing required under this subsection. Notwithstanding the deadline for final permit determination by the director under this subsection, no permit shall be issued until all publication and transcript costs have been paid. 3. The review of each permit shall be accomplished within the procedures allowed under subsection (L)1. and, if applicable, the procedures of subsection (L)2. 4. Special considerations for stack heights and dispersion techniques. (a) The degree of emission limitation required for control of any air pollutant under this section shall not be affected in any manner by: i. That amount of the stack height of any installation which exceeds good engineering practice (GEP) stack height; or ii. Any other dispersion technique. (b) Paragraph (F)4.(a) of this section shall not apply to stack heights on which construction commenced on or before December 31, 1970, or to dispersion techniques implemented on or before December 31, 1970. (c) Before the director issues a permit under this section based on stack heights that exceed GEP, the director must notify the public of the availability of the demonstration study and must provide opportunity for a public hearing on it. (d) This paragraph does not require that actual stack height or the use of any dispersion technique be restricted in any manner. 5. After a permit has been granted the owner or operator subject to this section shall furnish the director the following written notifications: i. A notification of the anticipated date of initial start-up of the source operation or installation within 30 days of the actual date of initial start-up; and ii. A notification of the actual date of initial start-up of a source operation or installation within 15 days after that date. 6. A permit may be revoked if construction or modification work is not begun within two years from the date of issuance, or if work is suspended for one year, and: i. The delay was reasonably foreseeable by the owner or operator at the time the permit was issued; ii. The delay was not due to an act of God or other conditions beyond the control of the owner or operator; or iii. Failure to revoke the permit would be unfair to other potential applicants. 7. Any owner or operator who constructs, modifies, or operates an installation not in accordance with the application submitted and the permit issued, including any terms and conditions made a part of the permit, or any owner or operator of an installation who commences construction or modification after May 13, 1982, without meeting the requirements of this section, is in violation of this section; 8. Approval to construct shall not relieve any owner or operator of the responsibility to comply fully with applicable provisions of the Air Conservation Law and any other regulations under local, state or federal law. 9. The director may require monitoring of visibility in any class I area near the new installation or major modification for these purposes and by such means as the director deems necessary and appropriate. (G) Nonattainment area permits. This subsection applies to the construction of any new major stationary source or any project at an existing major stationary source in an area designated as nonattainment. 1. Applicability procedures. The provisions of this subsection are used to determine, prior to beginning actual construction, if a project at an existing major stationary source is a major modification and thus subject to the permit application and review requirements of subsection (G)2. of this section. (a) Except for sources with a plantwide applicability limit (PAL), which shall comply with subsection (G)3. of this section, and in accordance with the definition of the term "major modification" contained in subsection (A)1. of this section, a project is a major modification if it causes two types of emissions increases for the nonattainment pollutant, a significant emissions increase and a significant net emissions increase. The project is not a major modification if it does not cause a significant emissions increase. If the project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase. (b) The emissions increase from the project is determined by taking the sum of the emissions increases from each emissions unit affected by the project. An emissions unit is considered to be affected by the project if an emissions increase from the unit would occur as a result of the project, regardless of whether a physical change or change in the method of operation will occur at the particular emissions unit. (c) For each existing emissions unit affected by the project, the emissions increase is determined by taking the difference between the projected actual emissions for the completed project and the baseline actual emissions. In accordance with the definition of the term "projected actual emissions" found in 40 CFR 52.21 as referred to in subsection (A)1. of this section, the owner or operator of the major stationary source may elect to use the existing emission unit's potential to emit in lieu of the projected actual emissions for this calculation. (d) For each new emissions unit affected by the project, the emissions increase is equal to the potential to emit. (e) The procedure for calculating the net emissions increase (the significance of which is the second criterion for determining if a project is a major modification) is contained in the definition of the term "net emissions increase" found in subsection (A)1. of this section. (f) The provisions of subsection (G)2. of this section do not apply to a source or modification that would be a major stationary source or major modification only if fugitive emissions to the extent quantifiable are considered in calculating the potential to emit of the stationary source or modification and the source does not belong to one of the source categories listed in items (i)(1)(vii)(a)-(aa) of 40 CFR 52.21 which is incorporated by reference in subsection (H)1. of this section. 2. Permit requirements. A permit shall not be issued, for the construction of a new major stationary source for the nonattainment pollutants, or for a major modification for the nonattainment pollutant of an existing major stationary source, unless the following requirements, in addition to section (F) of this section, are met: (a) By the time the source is to commence operation, sufficient emissions offsets shall be obtained as required to ensure reasonable further progress toward attainment of the applicable national ambient air quality standard and consistent with the requirements of section 173(a)(1)(A) of the Clean Air Act and paragraphs 40 CFR 51.165(a)(3) and (9); (b) In the case of a new or modified installation which is located in a zone (within the nonattainment area) identified by the administrator, in consultation with the secretary of housing and urban development, as a zone to which economic development should be targeted, emissions of that pollutant resulting from the proposed new or modified installation will not cause or contribute to emissions levels which exceed the allowance permitted for that pollutant for that zone from new or modified installations; (c) Offsets have been obtained in accordance with paragraph (G)2.(a) and with the offset and banking procedures in 10 CSR 10-6.410; (d) The administrator has not determined that the state implementation plan is not being adequately implemented for the nonattainment area in which the proposed source is to be constructed or modified; (e) Temporary installation and portable sources shall be exempt from this section provided that the source applies BACT for each pollutant emitted in a significant amount; (f) The applicant must provide documentation establishing that all installations in Missouri, which are owned or operated by the applicant, (or by any entity controlling, controlled by, or under common control with the applicant) are subject to emission limitations and are in compliance, or are on a schedule for compliance, with all applicable requirements; (g) Permit applications shall include a control technology evaluation to demonstrate that any new major stationary source or major modification will meet the lowest achievable emission rate (LAER) for all new or modified emission units, unless otherwise provided in this section; (h) Any new major stationary source or major modification to be constructed in an area designated nonattainment shall comply with LAER as determined by the director and set forth in the construction permit pursuant to this section, except where otherwise provided in this section; (i) The applicant must provide an alternate site analysis; and (j) The applicant shall provide an analysis of impairment to visibility in any class I area that would occur as a result of the installation or major modification and as a result of the general, commercial, residential, industrial, and other growth associated with the installation or major modification. 3. Plantwide Applicability Limits (PALs). The provisions of subsection (aa) of 40 CFR 52.21, which is incorporated by reference in subsection (H)1. of this section, shall govern PALs of the nonattainment pollutant for projects at existing major stationary sources in an area designated nonattainment, except that: (a) The term "administrator" shall be the director of the Missouri Department of Natural Resources' air pollution control program; (b) The term BACT or LAER and the term BACT shall both be LAER for the nonattainment pollutant; (c) The term PSD program, as it appears in 40 CFR 52.21(aa)(1)(ii)(b), and the term major NSR program, as it appears in 52.21(aa)(1)(ii)(c), both shall be nonattainment area permit program of this section; and (d) The director shall not allow a PAL for VOC or NO x for any existing major stationary source located in an extreme ozone nonattainment area. 4. Reporting and record keeping. This subsection applies to projects at existing major stationary sources, without a PAL, which are exempt from the permit requirements of subsection (G)2. of this section as a result of the applicability determination made in subsection (G)1. of this section. The owner or operator of such sources shall comply, in regards to the nonattainment pollutant, with the provisions of paragraph (r)(6) of 40 CFR 52.21, which is incorporated by reference in subsection (H)1. of this section, except that the term Administrator shall be the director of the Missouri Department of Natural Resources' air pollution control program. 5. Any construction or modification that will impact a federal class I area shall be subject to the provisions of subsection (L)(8) of this section. 6. All permit applications subject to subsection (G)2. of this section are subject to the public participation requirements in subsection (L)2. of this section. (H) Attainment and unclassified area permits. 1. All of the subsections of 40 CFR 52.21, other than (a) Plan disapproval, (q) Public participation, (s) Environmental impact statements, and (u) Delegation of authority, promulgated as of July 1, 2012, and Federal Register Notice 77 FR 41051 promulgated July 12, 2012, Federal Register Notice 77 FR 65107 promulgated October 25, 2012, and Federal Register Notice 76 FR 28646 promulgated May 18, 2011, are hereby incorporated by reference in this subsection, as published by the Office of the Federal Register, U.S. National Archives and Records, 700 Pennsylvania Avenue NW, Washington, DC 20408. This subsection does not incorporate any subsequent amendments or additions. 2. Applicants must obtain emission reductions, obtained through binding agreement prior to commencing operations and subject to 10 CSR 10-6.410, equal to and of a comparable air quality impact to the new or increased emissions in the following circumstances when the: (a) Area has no increment available; or (b) Proposal will consume more increment than is available. (I) Major case-by-Case hazardous air pollutant permits. Case-by-case permits must meet the requirements of 40 CFR 63, subpart B as specified in paragraph (3)(A)1. of 10 CSR 10-6.075. Before issuing a permit subject to this section, the permitting authority will issue a draft permit and related materials for public comment in accordance with the procedures for public participation as specified in subsection (L)2. (J) Amending a final permit. 1. No changes in the proposed installation or modification may be made which would change any information in a finalized permit, except in accordance with this subsection. 2. If an applicant desires to make the change, the applicant shall submit in writing a request to the director that the permit be amended. 3. If the requested change will result in increased emissions, air quality impact or increment consumption and is submitted after the final notice of permit processing fee due, a new permit application is required for the requested change. The new application, to the maximum extent possible, should reference those portions of the original application that are unchanged. This new submittal will be subject to all requirements of this section. The accrued permit processing fee from the original application must be submitted to the director before the new permit application can be accepted. 4. If the requested change will not result in increased emissions, air quality impact, or increment consumption, the original permit application shall be amended and the permit shall be modified pursuant to the amended application within 30 calendar days of receipt of the written request. The fee for this type of change will be subject to the requirements of section 8-20. (K) Tables. 1. Table 1: Ambient Air Increment Table: Pollutant | Maximum Allowable Increase Class I Areas Particulate matter 2.5 micron: Annual arithmetic mean | 1 24-hour maximum | 2 Particulate matter 10 micron: Annual arithmetic mean | 4 24-hour maximum | 8 Sulfur dioxide: Annual arithmetic mean | 2 24-hour maximum | 5 3-hour maximum | 25 Nitrogen dioxide: Annual arithmetic mean | 2.5 Class II Areas Particulate matter 2.5 micron: Annual arithmetic mean | 4 24-hour maximum | 9 Particulate matter 10 micron: Annual arithmetic mean | 17 24-hour maximum | 30 Sulfur dioxide: Annual arithmetic mean | 20 24-hour maximum | 91 3-hour maximum | 512 Nitrogen dioxide: Annual arithmetic mean | 25 Class III Areas Particulate matter 2.5 micron: Annual arithmetic mean | 8 24-hour maximum | 18 Particulate matter 10 micron: Annual arithmetic mean | 34 24-hour maximum | 60 Sulfur dioxide: Annual arithmetic mean | 40 24-hour maximum | 182 3-hour maximum | 700 Nitrogen dioxide: Annual arithmetic mean | 50 Notes: 1. All increases in micrograms per cubic meter. For any period other than an annual period, the applicable maximum allowable increase may be exceeded during one period once per year at any one location. 2. There are two class I Areas in Missouri—one in Taney County (Hercules Glade) and one in Wayne and Stoddard Counties (Mingo Refuge). 3. There are no class III Areas in Missouri at this time. 2. Table 2: Significant Monitoring Concentrations. Pollutant | Air Quality Impact Carbon monoxide | 575, 8-hour average Nitrogen dioxide | 14, annual Particulate matter—2.5 micron (PM2.5) | 4, 24-hour Particulate matter—10 micron (PM10) | 10, 24-hour Sulfur dioxide | 13, 24-hour Ozone Lead | 0.1, 3-month Mercury | 0.25, 24-hour Beryllium | 0.001, 24-hour Fluorides | 0.25, 24-hour Vinyl chloride | 15, 24-hour Total reduced sulfur | 10, 1-hour Hydrogen sulfide | 0.2, 1-hour Reduced sulfur compounds | 10, 1-hour Note: All impacts in micrograms per cubic meter. * No significant monitoring concentration is provided for ozone. However, any potential net increase of 100 tons per year, or more, of volatile organic compounds or nitrogen oxides subject to subsection (H) of this section would require an ambient impact analysis, including the gathering of ambient air quality data. 3. Table 3: Missouri Guidelines for Valid Data Total Suspended Particulate. Time Period | Minimum Requirement for Validity Month | 2, 24-hour samples Quarter | 10, 24-hour samples and 3 valid months Year | 45, 24-hour samples and 4 valid quarters Continuously Monitored Data Time Period | Minimum Requirement for Validity 3-hour running average | 3 consecutive hourly observations 8-hour running average | 6 hourly observations 24-hour average (daily) | 18 hourly observations Monthly | 21 daily averages Quarterly 1 | 3 consecutive monthly averages Yearly 2 | 11 monthly averages 1 "Quarter" is defined as calendar quarter. 2 "Year" is defined as four consecutive calendar quarters. 4. Table 4: Significant Levels for Air Quality Impact in Class II Areas. Averaging Time (Hours) Pollutant | Annual | 24 | 8 | 3 | 1 SO 2 | 1.0 | 5.0 | 25 PM10 | 1.0 | 5.0 PM2.5 | 0.3 | 1.2 NO 2 | 1.0 CO | 0.5 | 2.0 Note: All impacts in micrograms per cubic meter, except for CO in milligrams per cubic meter. (L) Appendices. 1. Appendix A, Permit Review Procedures. (a) Preapplication meeting. Prior to submittal of a complete permit application, the applicant may request a preapplication meeting with the permitting authority to discuss the nature of and apparent requirements for the forthcoming permit application. This meeting shall not fall under the permit fee requirements. (b) Complete application. i. The director shall review each application for completeness and shall inform the applicant within 30 days if the application is not complete. In order to be complete, an application must include a completed application form and, to the extent not called for by the form, the information required in subsection (L)1.(d) of this section. ii. If the director does not notify the installation that its application is not complete within 30 days of receipt of the application, the application shall be deemed complete. However, nothing in this subsection shall prevent the permitting authority from requesting additional information that is reasonably necessary to process the application. a. The director shall maintain a checklist to be used for the permit application's completeness determination. A copy of the checklist identifying the application's deficiencies shall be provided to the applicant along with notice of incompleteness. b. If, while processing an application that has been determined or deemed to be complete, the director determines that additional information is necessary to evaluate or to take final action on that application the director may request this additional information in writing. In requesting this information, the director shall establish a reasonable deadline for a response. The review period will be extended by the amount of time necessary to collect the required information. c. In submitting an application for amendment of a construction permit, the applicant may incorporate by reference those portions of the existing permit (and the permit application and any permit amendment) that describe products, processes operations and emissions. The applicant must identify specifically and list which portions of the previous permit, applications, or both, are incorporated by reference. In addition, a permits amendment application must contain information specified paragraph (L)1.(d) of this section for those products, processes, operations and emissions: (1) That are not addressed in the previous permit or application; (2) That are subject to applicable requirements that are not addressed in the previous permit or application; or (3) For which the applicant seeks permit terms and conditions that differ from those in the previous permit or application. iii. Confidential information. An applicant may submit information to the director under a claim of confidentiality pursuant to section 8-13. iv. Filing fee. Each application must be accompanied by a $100.00 filing fee. (c) Duty to supplement or correct application. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in a permit application, upon becoming aware of the failure or incorrect submittal, shall promptly submit supplemental facts or corrected information. In addition, an applicant shall provide additional information as necessary to address any requirements that become applicable to the installation after the date an application is deemed complete, but prior to the issuance of the construction permit. (d) Standard application form and required information. An applicant shall submit an application package consisting of the standard application form and emission inventory questionnaire. The application package must include all information needed to determine applicable requirements. The application must include information needed to determine the applicability of any applicable requirement. The applicant shall submit the information called for by the application form for each emissions unit at the installation to be permitted. The standard application form (and any attachments) shall require that the following information be provided: i. Identifying information. The applicant's company name and address (or plant name and address if different from the company name), the owner's name and state registered agent, and the telephone and name of the plant site manager or other contact person; ii. Processes and products. A description of the installation's processes and products (by two-digit Standard Industrial Classification Code); iii. Emissions-related information. The following emissions-related information shall be provided on the emission inventory forms. a. All emissions of regulated air pollutants. The permit application shall describe all emissions of regulated air pollutants emitted from each emissions unit, except as provided by this section. The installation shall submit additional information related to the emissions of air pollutants sufficient to verify which requirements are applicable; b. Identification and description of all emissions units whose emissions are included in paragraph (L)1.(d)(III)(1) of this section in sufficient detail to establish the applicability of all requirements; c. Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method, if any; d. Information to the extent needed to determine or regulate emissions, fuels, fuel use, raw materials, production rates and operating schedules; e. Identification and description of air pollution control equipment; f. Identification and description of compliance monitoring devices or activities; g. Limitations on installation operations affecting emissions or any work practice standards, where applicable, for all regulated air pollutants; h. Other information required by any applicable requirement (including information related to stack height limitations developed pursuant to section 123 of the Act); and i. Calculations on which the information in points (L)1.(d)(III)(1) through (8) of this section is based; iv. Other specific information required under the director's rule to implement and enforce other applicable requirements of the Act or this Code, or to determine the applicability of these requirements. (e) Certification by responsible official. Any application form or report submitted pursuant to this section shall contain certification by a responsible official of truth, accuracy and completeness. This certification, and any other certification, shall be signed by a responsible official and shall contain the following language: "I certify, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete." (f) Receipt of the complete application. Upon receipt of a complete application and the required fee, the director shall proceed with an application review. (g) Notification of processing fees. The director, as timely as possible, will notify the applicant in writing if the permit processing fee approaches $1,000.00 and in $1,000.00 increments after that. (h) Public participation. For all applications of sources that emit five or more tons of lead per year, or that contain good engineering practice stack height demonstrations, or that are subject to subsection (G) and (H) of this section, the director shall follow the procedures for public participation as specified in subsection (L)2 of this section. (i) Final completeness determination. Final determination will be made on the following schedules: i. The director will make final determination for complete permit applications processed under subsections (G), (H) or (I) of this section no later than 184 calendar days after receipt of a complete application, taking into account any additional time necessary for missing information; ii. The director will make final determination for complete permit applications processed under subsections (C), (D), (E) or (F) of this section no later than 90 calendar days after receipt of a complete application, taking into account any additional time necessary for missing information; iii. If the director exceeds the time for review described in paragraphs (L)1.(i)(I) and (II), the applicant shall not be required to pay the processing fee associated with the application. (j) After making a final determination whether the permit should be approved, approved with conditions or denied, the director shall notify the applicant in writing of the final determination. (k) Conditions required by the director. The director may impose those conditions in a permit as may be necessary to accomplish the purposes of this section, any applicable requirements, or the Air Conservation Law, RSMo ch. 643, and are no less stringent than any applicable requirements. Nothing in this section shall be deemed to limit the power of the director in this regard. Such conditions may include but are not limited to the following examples presented solely for the purposes of illustration which do not limit the generality of the preceding liberal sentence: i. Sampling port(s) of a suitable size, number and location; ii. Safe access to each port; iii. Instrumentation to monitor and record emission data; iv. Other sampling and testing facilities; v. Operating or work practice constraints to limit the maximum level of emissions; vi. Emission control device efficiency specifications to limit the maximum level of emissions; vii. Maximum level of emissions; viii. Emission testing after commencing operations, to be conducted by the owner or operator, as necessary to demonstrate compliance with applicable emission control regulations or other permit conditions; ix. Data reporting; x. Post-construction ambient monitoring and reporting. (l) Drafts for public comment. Following review of an application, the director shall issue a draft permit for public comment, in accordance with subsection (L)2. Of this section. The draft shall be accompanied by a statement setting forth the legal and factual basis for the draft permit conditions (including references to applicable statutory or regulatory provisions). The director shall send this statement to the administrator, to affected states and to the applicant, and shall place a copy in the public file. (m) Additional procedures needed for unified reviews of subsection (F), (G), (H) or (I) of this section, unified reviews construction permit applications, and part 70 operating permit applications. i. Permit review by the administrator and affected states. a. Administrator review. (1) Copies of applications, proposals and final actions. The applicant will provide two copies of the information included in an application. The director will forward to the administrator one copy of each permit application and each final operating permit. (2) Administrator's objection. No permit shall be issued under this section if the administrator objects to its issuance in writing within 45 days after receipt of the proposed permit and all necessary supporting information. (3) Failure to respond to objection. If the director does not respond to an objection of the administrator by transmitting a revised proposed permit within 90 days after receipt of that objection, the administrator may issue or deny the permit in accordance with the Act. (4) Public petitions for objection. If the administrator does not object to a proposed permit action, any person may petition the administrator to make such an objection within 60 days after expiration of the administrator's 45-day review period. [a] This petition may only be based on objections raised during the public review process, unless the petitioner demonstrates that it was impracticable to raise objection during the public review period (including when the grounds for objection arose after that period). [b] If the administrator responds to a petition filed under this subsection by issuing an objection, the director will not issue the permit until the objection has been resolved. If the permit was issued after the administrator's 45-day review period, and prior to any objection by the administrator, the director shall treat that objection as if the administrator were reopening the permit for cause. In these circumstances, the petition to the administrator does not stay the effectiveness of the issued permit, and the permittee shall not be in violation of the requirement to have submitted a complete and timely permit application. b. Affected state review. (1) Notice of draft actions. The director will give notice of each draft permit to any affected state or before the time that the director provides to the public. Affected states may comment on the draft notice permit action during the period allowed for public comment, as shall be set forth in a notice to affected states. (2) Refusal to accept recommendations. If the refuses to accept all recommendations for a proposed permit action that any affected state has submitted during the review period, the director shall notify the administrator and the affected state in writing of its reasons for not accepting those recommendations. ii. Proposals for review. Following the end of the public comment period, the director shall prepare and submit to the administrator a proposed permit. a. The proposed permit shall be issued no later than 45 days after the deadline for final action under this section and shall contain all applicable requirements that have been promulgated and made applicable to the installation as of the date of issuance of the draft permit. b. If new requirements are promulgated or otherwise become newly applicable to the installation following the issuance of the draft permit, but before issuance of a final permit, the director may elect to either: (1) Extend or reopen the public comment period to solicit comment on additional draft permit provisions to implement the new requirements; or (2) If the director determines that this extension or reopening of the public comment period would delay issuance of the permit unduly, the director may include in the proposed or final permit, or both a provision stating that the operating permit will be reopened immediately to incorporate the new requirements and stating that the new requirements are excluded from the protection of the permit shield. If the director elects to issue the proposed or final permit, or both, without incorporating the new requirements, the director, within 30 days after the new requirements become applicable to the source, shall institute proceedings pursuant to this section to reopen the permit to incorporate the new requirements. These reopening proceedings may be instituted, but need not be completed, before issuance of the final permit. iii. Action following the administrator's review. a. Upon receipt of notice that the administrator will not object to a proposed permit that has been submitted for the administrator's review pursuant to this subsection, the director shall issue the permit as soon as practicable, but in no event later than the fifth day following receipt of the notice from the administrator. b. Forty-five days after transmittal of a proposed permit for the administrator's review, and if the administrator has not notified the director that she/he objects to the proposed permit action, the director shall promptly issue the permit, but in no event later than the fiftieth day following transmittal to the administrator. c. If the administrator objects to the proposed permit, the director shall consult with the administrator and the applicant, and shall submit a revised proposal to the administrator within 90 days after the date of the administrator's objection. If the director does not revise the permit, the director will so inform the administrator within 90 days following the date of the objection and decline to make those revisions. If the administrator disagrees with the director, the administrator may issue the permit with the revisions incorporated. (n) Notification in writing. After making a final determination whether the permit should be approved, approved with conditions, or denied, the director shall notify the applicant in writing of the final determination and the total permit processing fees due. (o) Notice of processing fees due. If payment of permit processing fees have not been received from the applicant 45 calendar days after the final determination, the director shall issue in writing to the applicant a final notice of payment due. (p) Processing fees unpaid. If payment of permit processing fees has not been received from the applicant 90 calendar days after the final determination, the director shall notify the applicant that the permit has been denied, provided the application previously had been approved in the final determination. The director also shall advise the applicant that the fee is still due and as specified in section 8-20, the fee shall have interest imposed upon it from the date of billing until payment is made. (q) Payment received. No later than three calendar days after receipt of the whole amount of the fee due, the director will send the applicant a notice of payment received. The permit will also be issued at this time, provided the final determination was for approval and the permit processing fee was timely received. 2. Appendix B, Public Participation. (a) This subsection shall apply to review of applications under subsections (G) and (H) of this section, and applications for source operations or installations emitting five or more tons of lead per year and applications containing GEP stack height demonstrations as defined in section 8.2. (b) For those applications subject to subsections (G) or (H) of this section, completing the final determination within 184 days after receipt of a complete application involves performing the following actions in a timely manner: i. Preliminary determination. Within 90 days after receipt of a complete application, the director shall make a preliminary determination whether construction should be approved, approved with conditions, or denied. ii. Draft for public comment and public hearing opportunity. No later than ten days after the close of the preliminary review period, the director shall issue draft permit and solicit comments by publishing a notice in a newspaper of general circulation within or nearest to the county in which the project is proposed to be constructed or operated. The public notice shall describe the nature of the application, including, with reasonable specificity, the following: name, address, phone number and representative of the agency issuing the public notice; name and address of the applicant; and the proposed project, including its location and permits applied for; a description of the amount and location of emission reductions that will offset the emissions increase from the new or modified source, and include information on how LAER was determined for the project (where appropriate). The public notice shall also include degree of increment consumption, when appropriate. The director shall give preliminary determination of whether to approve, approve with conditions or deny, and any reference to conditions relating to visibility. The notice shall state a public hearing shall be held, if requested, concerning the permit application, at which time any interested person may submit any relevant information, materials and views in support of or opposed to the permit applied for. The notice shall state the location and time of the public hearing (if one is requested), with the hearing being held in the county in which all or a major part of the proposed project is to be located and state that the hearing will be canceled if a request for a hearing is not received with in 28 days of the publication of the notice. The hearing shall be scheduled not less than 30 nor more than 40 days after the date of publication of the notice. The notice also shall state that any interested person may submit relevant information materials and views to the director, in writing, until the end of the day on which the public hearing is held, or would be held if requested. The notice shall further state that a copy of materials submitted by the applicant and used in making the preliminary determination, a copy of the preliminary determination, and a copy or summary of other materials, if any, considered in making the preliminary determination are available for public inspection at the office of the air quality program. The director shall submit copies of all such public notices to the administrator of the United States Missouri Department of Natural Resources. iii. Availability of preliminary determination. After the close of the preliminary review period, but no later than the date public notice is published, the director shall make available to the public, until the end of the public comment period, at the air quality program office a copy of the preliminary determination and a copy of summary of other materials, if any, considered in making the preliminary determination; iv. The director may designate another person to conduct any hearing under this section; v. Distribution of public notice. Within ten days after the close of the preliminary review period, the director shall send a copy of the public notice to the applicant and to officials and agencies having cognizance over the location where the proposed construction or modification would occur as follows: local air pollution control agencies, the chief executive of the city and county where the installation or modification would be located, any comprehensive regional land use planning agency, any state air program permitting authority, and any Federal Land Manager (FLM) whose lands may be affected by emissions from the installation or modification; vi. Public comment and applicant response. The director shall consider all written comments submitted within the time specified in the public notice and all comments received at the public hearing, if one is held, in making a final decision on the approvability of the application. No later than ten days after the close of the public comment period, the applicant may submit a written response to any comments submitted by the public. The director shall consider the applicant's response in making a final decision. The director shall make all comments available for public inspection in the same locations where the director made available prehearing information relating to the proposed installation or modification. Further, the director shall prepare a written response to all comments and make them available at the locations referred to above. vii. Final determination. The director shall make a final determination whether the construction or modification should be approved, approved with conditions, or denied and notify the applicant in writing of the final determination and make such notification available for public inspection at the same locations where the director made available prehearing information and public comments relating to the installation or modification. The director shall submit a copy of this final determination to the Administrator of the Missouri Department of Naturals Resources. viii. Public notice exception. If the administrator has provided public notice and opportunity for public comment and hearing equivalent to that provided by this subsection, the director may make a final determination without providing public notice and opportunity for public comment and hearing required by this subsection. ix. Class I area visibility review and notice to the FLM. a. For proposed installation subject to specific permit requirements in subsections (G) and (H) of this section, but not dependent on any quantity of lead emissions as stated in paragraph (L)2.(a) of this section, the director shall provide advance notification to any FLM where, in the judgment of the director, visibility may be affected in a class I area of the FLM's responsibility. The notice shall be provided within 30 days of receipt of an initial application or when first learning of the applicant's intent for a permit. b. No later than 30 days after receipt of a complete application, the director shall make written notification to the FLM whose class I area may be affected by emissions from the proposed source. The notification must include all information relevant to the permit application and shall include an analysis of anticipated class I visibility impacts. The director may also make this notification to any additional FLM whose class I area's visibility, in the judgment of the director, may be impacted. c. The director shall consider any analysis performed by an FLM that is provided to the director within 30 days of the FLM's receipt of the notification and analysis requested in subsection (L)2.(IX)b. of this section. Where the FLM's analysis indicates that an adverse impact on visibility (as defined in section 8-2) would occur in a class I area as a result of the proposed project, and analysis does not demonstrate an adverse impact to the director's satisfaction, the director shall so indicate the dissatisfaction in the public notice of hearing. With this condition, the public notice also shall contain the location where an explanation of the director's reasoning can be found, and that the explanation be available for public inspection no later than the date public notice is published. (c) This paragraph is for those applications not subject to subsections (G) or (H) of this section, but which propose an emission of five or more tons of lead per year or applications containing GEP stack height demonstrations. For these applications, completing the final determination within 90 calendar days after receipt of the complete application involves performing the same public participation activities as those subject to subsections (G) or (H) of this section, but with shorter time frames. The following specifies the new time frames: (I) Director's preliminary determination. No later than 45 calendar days after receipt of a complete application; (II) Public notice of hearing. No later than five calendar days after the preliminary determination; (III) Public hearing. No later than 30 calendar days after the date of the public notice; and (IV) Applicant response. No later than five calendar days after the end of the public comment period, the applicant may submit a written response to any comments submitted. 3. Appendix C, Innovative Control Technology. (a) An owner or operator of an installation subject to subsection (H) may employ a system of innovative control technology if: i. The applicant demonstrates to the satisfaction of the director that the proposed control system will not cause or contribute to an unreasonable risk to public health, welfare or safety in its operation, function or malfunction; ii. The owner or operator demonstrates to the satisfaction of the director the ability of the proposed control system to achieve a level of continuous emission reduction equivalent to that which would have been required under subsection (H)1. of this section by a reasonable date specified by the director, taking into consideration the technical and economic feasibility. The date specified shall not be later than four years from the time of start-up or seven years from permit issuance. iii. On the date specified by the director, the proposed construction employing the system of innovative control will meet the requirements of 40 CFR 52.21(1) and 40 CFR 52.21(v). iv. The proposed construction would not cause or contribute to a violation of an applicable national ambient air quality standard, impact any class I area, or impact any area where an applicable increment is known to be violated, before the date specified by the director. v. Consent is gained from the governor of any adjacent state that will be significantly impacted by the proposed construction before the date specified by the director; and vi. All other applicable requirements including those for public participation have been met. (b) Any approval to employ a system of innovative control technology may be revoked by the director if: (I) The proposed system fails or will fail by the specified date to achieve the required continuous emission reduction rate; or (II) The proposed system contributes or will contribute to an unreasonable risk to public health, welfare or safety in its operation, function or malfunction before the specified date; or (III) The director determines that the proposed system is unlikely to protect the public health, welfare or safety. (c) If an installation to which this subsection applies fails to meet the required level of continuous emission reduction within the specified time period, or the approval is revoked in accordance with paragraph (L)3.(b) of this section, the owner or operator may request the director to grant an extension of time for such minimum period as may be necessary to meet the requirement for the application of best available control technology (BACT) through use of a demonstrated system of control. Such period shall not extend beyond the date three years after termination of the same time period specified in paragraph (L)3.(a). 4. Appendix D, Air quality models. (a) All estimates and analyses of ambient concentrations shall be based on the applicable air quality models, data bases, and other requirements specified in the Environmental Protection Agency's (EPA) Guideline on Air Quality Models (40 CFR 51, appendix W) including supplements at the time of application. (b) Any model(s) designated in paragraph (L)4.(a) of this section may be adjusted upon a determination by the administrator and the director, after notice and opportunity for public hearing, that the adjustment is necessary to take into account unique terrain or meteorological characteristics of an area potentially affected by emissions from the source. Methods like those outlined in the Protocol for Determining the Best Performing Model (United States EPA publication No. EPA-454/R-92-025, Office of Air Quality Planning and Standards, Research Triangle Park, NC 27711, 1992) and Standard Guide for Statistical Evaluation of Atmospheric Dispersion Model Performance (NTIS No. PB 93-226082) should be used to determine the comparability of air quality models. (c) Where the Guideline on Air Quality Models (40 CFR 51, appendix W) including supplements at the time of application does not address a situation requiring modeling, the administrator and the permitting authority, after notice and opportunity for public hearing, may approve the use of a model which they deem accurate for modeling that situation. 5. Appendix E, Increment Tracking. (a) The director will track ambient air increment consumption at fixed baseline locations within the baseline areas. (b) Available increment will be allocated on a "first-come, first-serve" basis. The marked received date of a complete application will be used by the director to determine which applicant is entitled to prior allocation of increments. (c) At intervals of five years from the baseline date, the director shall determine the actual air quality increment available or consumed for location(s) for which complete air monitoring data exists using subsection (K)3. (d) Exclusions from increment consumption. Upon written request of the owner or operator of an installation, made after notice and opportunity for at least one public hearing to be held in accordance with the procedures established in subsection (L)2. Of this section, the director shall exclude the following concentrations in determining consumption of maximum allowable increase: i. Concentrations attributable to the increase in emissions from installations which have converted from the use of petroleum products, natural gas or both, by reason of an order in effect under sections 2(a) and (b) of the Energy Supply and Environmental Coordination Act of 1974 (or any superseding legislation) over the emissions from those sources before the effective date of such an order; ii. Concentrations attributable to the increase in emissions from installations which have converted from using natural gas by reason of a natural gas curtailment plan in effect pursuant to the Federal Power Act over the emissions from such sources before the effective date of such plan; iii. Concentrations of particulate matter attributable to the increase in emissions from construction or other temporary emission-related activities; iv. However, no exclusion of these concentrations shall apply more than five years after the effective date of the order to which paragraph (L)5.(d)(I) of this section refers or the plan to which paragraph (L)5.(d)(II) of this section refers, whichever is applicable. If both the order and the plan are applicable, no exclusion shall apply more than five years after the later of such effective dates. 6. Appendix F, Impacts on Class I Areas. (a) At any time prior to the close of the public comment period specified in subsection (L)2. Of this section, the FLM for any federal class I area may provide information to director demonstrating that the emissions from the proposed installation or major modification would have an adverse impact on the air quality-related values (including visibility) of any federal mandatory class I area, notwithstanding that the change in air quality, resulting from emissions from the installation or major modification, would not cause or contribute to concentrations which would exceed the maximum allowable increase for a class I area, as specified in subsection (K)1. Of this section, If the director concurs in the demonstration by the FLM, the permit shall be denied. (b) Class I variances. The owner or operator of a proposed installation or major modification may demonstrate to the FLM that the emissions from the source would have no adverse impact on the air quality-related values of any federal mandatory class I area (including visibility), notwithstanding that the change in air quality resulting from emissions from the source would cause or contribute to concentrations which would exceed the maximum allowable increases for a class I area. If the FLM concurs with a demonstration and so certifies to the director, the director, providing that all other applicable requirements of this section are met, may issue the permit with those emission limitations as may be necessary to assure that emissions of sulfur dioxide, particulate matter and nitrogen dioxide would not exceed the following maximum allowable increases over baseline concentration for these pollutants: Pollutant | Maximum Allowable Increase Particulate matter 2.5 micron: Annual arithmetic mean | 4 24-hour maximum | 9 Particulate matter 10 micron: Annual arithmetic mean | 17 24-hour maximum | 30 Sulfur dioxide: Annual arithmetic mean | 20 24-hour maximum | 91 3-hour maximum | 325 Nitrogen dioxide: Annual arithmetic mean | 25 Note: Increases are in micrograms per cubic meter. (c) Sulfur dioxide variance by governor with FLM's concurrence. i. If the owner or operator of a proposed installation or major modification who has been denied an FLM's certification pursuant to paragraph (L)6.(a) of this section demonstrates to the governor that the installation or major modification cannot be constructed as a result of any maximum allowable increase for sulfur dioxide for periods of 24 hours or less applicable to any class I area and, in the case of federal mandatory class I areas, that a variance under this part would not adversely affect the air quality-related values of the area (including visibility), then the governor, after consideration of the FLM's recommendation (if any) and subject to their concurrence, may grant, after notice and an opportunity for a public hearing, a variance from these maximum allowable increases. ii. If a variance is granted, the director may issue a permit to an installation or major modification in accordance with the requirements of paragraph (L)6.(e) of this rule, provided that all other applicable requirements of this section are met. (d) Variance by the governor with the president's concurrence. i. The recommendations of the governor and the FLM shall be transferred to the president in any case where the governor recommends a variance in which the FLM does not concur. ii. If this variance is approved by the president pursuant to 42 U.S.C.A. section 7475(d)(2)(D)(ii), the director may issue a permit in accordance with the requirements of paragraph (L)6.(e) provided that all other applicable requirements of this section are met. (e) Emission limitations for presidential or gubernatorial variance. i. In the case of a permit issued pursuant to paragraph (L)6.(c) or (d) of this section, the director shall impose, as conditions of the permit, emission limitations as may be necessary to assure that emissions of sulfur dioxide from the installation or major modification (during any day on which the otherwise applicable maximum allowable increases are exceeded) will not cause or contribute to concentrations which will exceed the following maximum allowable increase over the baseline concentrations: Maximum Allowable Increase (micrograms per cubic meter) Period of Exposure | Terrain Areas Low | High 24-hour maximum | 36 | 62 3-hour | 130 | 221 ii. These emission limitations also shall assure that the emissions will not cause or contribute to concentrations which exceed the otherwise applicable maximum allowable increases for periods of exposure of 24 hours or less for more than 18 days, not necessarily consecutive, during any annual period. (f) The director shall transmit to the administrator a copy of each permit application under this subsection (L)6. and provide notice to the administrator of every action related to the consideration of a permit. 7. Appendix G, Attainment and Unclassified Area Designations. (a) Area classification. i. The following areas shall be class I areas and may not be redesignated: a. Hercules Glade National Wilderness Area; and b. Mingo National Wilderness Area. ii. Any other area, unless specified in the legislation creating such an area, is initially designated class II, but may be redesignated as provided in this section. iii. The following areas may be redesignated only as class I or II: a. An area which as of August 7, 1977 exceeded 10,000 acres in size and was a national monument, a national primitive area, a national preserve, a national recreational area, a national wild and scenic river, a national wildlife refuge, or a national lakeshore or seashore; and b. A national park or national wilderness area established after August 7, 1977 which exceeds 10,000 acres in size. (b) Area redesignation. i. All areas (except as otherwise provided under subsection (L)7.(a) of this section are designated class II as of December 5, 1974. Redesignation (except as precluded by subsection (L)7.(a) of this section may be proposed by the commission as provided in this section, subject to approval by the administrator. ii. The commission may submit to the administrator a proposal to redesignate areas of the state as class I or class II provided that: a. At least one public hearing has been held in accordance with procedures established in RSMo 643.070 and 643.100; b. Other states and FLMs whose lands may be affected by the proposed redesignation were notified at least 30 days prior to the public hearing; c. A discussion of the reasons for the proposed redesignation, including a satisfactory description and analysis of the health, environmental, economic, social and energy effects of the proposed redesignation, was prepared and made available for public inspection at least 30 days prior to the hearing and the notice announcing the hearing containing appropriate notification of the availability of that discussion; d. Prior to the issuance of notice respecting the redesignation of an area that includes any federal lands, the commission has provided written notice to the appropriate FLM and afforded adequate opportunity (not in excess of 60 days) to confer with the commission requesting the redesignation and to submit written comments and recommendations. In redesignating any area, with respect to which any FLM had submitted written comments and recommendations, the commission shall have published a list of any inconsistencies between the redesignation and comments and recommendations (together with the reasons for making redesignation against the recommendation of the FLM); and e. The commission has proposed the redesignation after consultation with the elected leadership of local and other substance general purpose governments in the area covered by the proposed redesignation. iii. Any area other than an area to which subsection (L)7.(a) refers maybe redesignated class III if: a. The redesignation would meet the requirements of provisions established in accordance with subsection (L)7.(b)(II).; b. The redesignation has been approved by the commission and the governor; c. The redesignation has been approved by the governor after consultation with the appropriate communities of the legislature if it is in session or with the leadership of the legislature if it is not in session; d. General purpose units of local government, representing a majority of the residents of the area to be redesignated, adopt resolutions concurring in the redesignation; e. The redesignation would not cause or contribute to a concentration of any air pollutant which would exceed any maximum allowable increase permitted under the classification of any other area or any national ambient air quality standard; and f. Any permit application for any installation or major modification subject to provisions established in accordance with subsection (L)7.(b)(I) of this section which could receive a permit only if the area in question were redesignated as class III and any material submitted as part of that application were available, insofar as was practicable, for public inspection prior to any public hearing on redesignation of any area as class III. (c) Area class designations. Area Class Description Class I | Hercules Glade National Wilderness Area Mingo National Wilderness Area Class II | All areas of the state which are not nonattainment Class III | No areas designated 8. Appendix H, Air Quality Analysis for Hazardous Air Pollutants. (a) The director shall maintain a table of emission threshold levels, risk assessment levels, and screening model action levels for hazardous air pollutants. Applicants will not be required to submit a hazardous air pollutant air quality analysis for applications having a maximum design capacity no more than the hazardous air pollutant emission threshold levels unless paragraph (L)8.(b) of this section applies. (b) Exceptions. The director may require an air quality analysis for applications if it is likely that the construction or modification will result in the discharge of air contaminants in quantities, of characteristics and of a duration which directly and proximately cause or contribute to injury to human, plant, or animal life or the use of property or complaints filed in the vicinity of the proposed construction or modification warrant an air quality analysis.

(Ord. No. 220226, § 1, 6-30-22)

Ask a question about Kansas City law

Corpus searches the Kansas City sections it holds and shows the ones that match, with their citations. Free, no sign-in.