JOINT WHICH CONNECTS TO POTW SEWER; SPECIFICATIONS
Salt Lake City Code § 17.48.100
in effect17.48.100: JOINT WHICH CONNECTS TO POTW SEWER; SPECIFICATIONS:
The connection of the "wye" onto the main sewer shall be entirely surrounded with a collar of a design specified by the POTW construction standards. Connection work shall be done only by the POTW, or in the presence of the POTW inspector. The trench shall not be backfilled until the building sewer line has been connected, tested and approved by the POTW inspector. (Ord. 36-93 § 6, 1993: prior code § 37-3-16)
Source: Salt Lake City, Utah, City Code (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/saltlakecityut/latest/saltlakecity_ut/0-0-0-58951Fetched: 11/1/2026
