§ 5-655 — Standards for areas of shallow flooding (AO zones)
Code of Ordinances of the City of Montgomery, Alabama (Supp. No. 27: codified through Ordinance No. 4-2026, enacted March 5, 2026) · Montgomery City Code § 5-655
Corpus is an independent public-information project, not the official City of Montgomery website. Stable reference: corpuslaw.us/code/9f72df59-0962-4fc8-9d6f-ab85a61b7c1e
Sec. 5-655. - Standards for areas of shallow flooding (AO zones).
Special flood hazard areas established in division 2, section 5-617 may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply: (1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified on the flood insurance rate map (FIRM), or at least three feet above the highest adjacent grade where no depth number is specified. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of division 4, subsection 652(4). A professional engineer, who is licensed to practice in the State of Alabama, shall certify the lowest floor elevation level and the floodplain administrator shall place the record as a permanent part of the permit file. (2) New construction and the substantial improvement of a non-residential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified flood level in division 4, subsection 5-655(1), or three feet (if no depth number is specified), above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. As the requirements set forth in division 4, subsections 5-652(1) and 5-652(2) stipulate the lowest floor to be elevated no less than two feet above the BFE, then the structure for this condition shall be elevated no less than four feet above the highest adjacent grade. A professional engineer, who is licensed to practice in the State of Alabama, or licensed architect, who is registered in the State of Alabama, shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above and shall provide such certification to the official as set forth above and as required in division 3, subsection 5-637(1) and (2). (3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
(Ord. No. 4-2026, 3-5-2026)
Ask a question about Montgomery law
Corpus searches the Montgomery sections it holds and shows the ones that match, with their citations. Free, no sign-in.
