For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

EROSION PREVENTION AND SEDIMENT CONTROL

Salem Revised Code tit. VI, ch. 75
in effect

Salem Revised Code § 75.010 General policy and intent; scope.

Salem Revised Code § 75.020 Definitions.

Salem Revised Code § 75.030 Erosion prohibited.

Salem Revised Code § 75.040 Responsibility for violations.

Salem Revised Code § 75.050 Erosion control permits.

Salem Revised Code § 75.060 Plan requirements.

Salem Revised Code § 75.070 Maintenance.

Salem Revised Code § 75.080 Inspection.

Salem Revised Code § 75.090 Deposits on public streets and into storm drainage system prohibited.

Salem Revised Code § 75.100 Fees.

Salem Revised Code § 75.120 Construction site controls.

Salem Revised Code § 75.130 Dust suppression required.

Salem Revised Code § 75.140 Water quality maintenance.

Salem Revised Code § 75.150 Fish and wildlife habitat protection.

Salem Revised Code § 75.160 Existing vegetation and slope stability.

Salem Revised Code § 75.170 Contaminated soils.

Salem Revised Code § 75.175 Stop work orders; permit revocation; civil penalties; enforcement.

Salem Revised Code § 75.200 Falsifying information.

Salem Revised Code § 75.210 Violations.

Salem Revised Code § 75.220 Remedies not exclusive.

Source: City of Salem, Oregon, Salem Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/or/salem/codes/code_of_ordinances?nodeId=PTIICOOR_TITVIWAWAST_CH75ERPRSECOFetched: 11/7/2026