Design requirement.
Oxford Code of Ordinances § 98-96
in effectSec. 98-96. - Design requirement.
Erosion control practices, sediment control practices, and waterway crossings shall meet the design criteria set forth in the most recent version of the Field Manual and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the city.
(1) Clearing and grading.
a. Clearing and grading of natural resources, such as wetlands, waterways, and watercourses, shall not be permitted, except when in compliance with all other chapters of this Code and any and all federal, state and local regulations.
b. Clearing techniques that retain natural vegetation and natural drainage patterns are strongly encouraged.
c. A buffer area within the front, side, and rear setbacks is required The buffer area can either be the existing vegetation that is left undisturbed or re-establishment by planting new vegetation if clearing or grubbing is required within setbacks. If setbacks are not required, perimeter control measures are expected to act as buffer.
d. Multi-stage phasing may be required on sites, with the size of each phase to be established by the QCP and approved by the city. The stormwater pollution prevention plan should clearly delineate each phase of clearing and the estimated duration of exposed soils.
e. Clearing, except as is necessary to install BMPs, shall not begin until the city's BMP minimum requirements are met
f. Cut and fill slopes shall be no greater than 3:1, except as approved by the city.
g. Developers requesting city sewer and/or water services must obtain site plan approval prior to clearing regardless of property location. If clearing occurs outside permitting district prior to obtaining site plan approval, then connection to city utilities shall be denied for up to 18 months from date of request for services unless necessary remedies are approved by planning director and city engineer. The delay will not apply to single-family residential construction that is less than one acre.
(2) Erosion control.
a. Stabilization requirements. Any area of land from which the natural vegetative cover has been either partially or wholly cleared or removed by development activities shall be revegetated within 21 days from the substantial completion of such clearing and grading. The following criteria shall apply to revegetation efforts: Reseeding must be done with an annual or perennial cover crop accompanied by placement of a mulch material or its equivalent of sufficient coverage to control erosion until such time as the cover crop is established over 90 percent of the seeded area.
b. Areas in the setbacks must be stabilized within 21 days of being disturbed.
c. If vegetative erosion control methods, such as seeding, have not germinated to a coverage of at least 90 percent within 21 days, the city may require that the site be reseeded, sodded, or stabilized with alternative cover.
d. Replanting with native woody and herbaceous vegetation must be accompanied by placement of mulch material or its equivalent of sufficient coverage to control erosion until the plantings are established and are capable of controlling erosion. Revegetation sites must exhibit a survival rate of at least 75 percent of the cover crop throughout the year immediately following the revegetation. Revegetation must be repeated in successive years until the minimum 75 percent survival rate for one year is achieved.
e. On steep slopes or in drainage ways, special techniques that meet or exceed design criteria outlined in the Field Manual shall be used to ensure stabilization.
f. Soil stockpiles must be stabilized at the end of each work week or if a rain event is predicted.
g. Techniques, as referenced the Field Manual shall be employed to prevent the blowing of dust or sediment from the site onto adjacent properties. The use of chemical agents in or near critical areas is discouraged.
h. Right-of-way disturbances shall be stabilized with sod or a combination of sod and seed/mulch. Seed and mulch alone shall not be acceptable.
i. Techniques shall be employed to divert upland runoff past or around disturbed slopes.
(3) Sediment controls.
a. Sediment controls shall be provided in the form of perimeter controls, such as silt fences, sediment basins and/or sediment traps.
b. Where possible, sediment basins shall be designed in a manner that allows adaptation to provide long term stormwater management.
c. Adjacent properties shall be protected.
(4) Waterways and watercourses.
a. When a watercourse must be crossed regularly during construction, a temporary stream crossing shall be provided. When applicable, approval must be obtained from the United States Army Corps of Engineers, state and federal agencies, and the city.
b. When in-channel work is conducted, the channel shall be stabilized after the work is completed.
c. Any construction of a crossing of a waterway or watercourse in a floodway must be engineered with a no-rise certificate and shall have minimal temporary or permanent disturbance of the floodways bottom condition.
d. All on-site stormwater conveyance channels shall be designed according to the criteria outlined in the Field Manual.
e. Outlets of all pipes and paved channels shall have adequate stabilization to prevent erosion. Riprap may be required for stabilization if vegetative measures prove to be ineffective at controlling erosion in waterways or watercourses.
(5) Construction site access.
a. A stabilized construction access (construction entrance) shall be required on all development and construction sites, including single-family residence, in order to ensure sediment is not tracked on to public streets from the construction site. Stone pads shall be a course aggregate meeting the requirements for MDOT's Size I aggregate, be six inches thick and shall be placed a minimum width equal to existing drive (if existing) or 30 feet. The length of stone pad will be sufficient to prevent sedimentation from entering public streets from the construction site.
b. Sediment accumulation and tracking on public rights-of-way, such as streets, alleys, storm drains or sanitary sewers, ditches and sidewalks, is not allowed and shall be removed daily.
(6) Completion of construction activities. All open channels and ditches shall be permanently vegetated upon final building inspection. Seed and mulch shall not be accepted. If sod is used on slopes, corners will need to be pinned per the Field Manual.
a. Common areas, such as detention basins, shall be permanently stabilized upon final inspection. Seed and mulch shall not be accepted.
b. Prior to final inspection, all construction waste and debris, silt fences, hay bales, inlet protection, and other BMPs shall be removed, except those required for the next phase of construction, or those deemed necessary for continued stabilization by the building official.
c. The responsible party shall submit a letter to building official requesting termination of land disturbance permit upon completion of all construction activities and stabilization of property.
(Ord. No. 2014-26, § I, 7-1-2014)