For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-651 — General standards

Code of Ordinances of the City of Montgomery, Alabama (Supp. No. 27: codified through Ordinance No. 4-2026, enacted March 5, 2026) · Montgomery City Code § 5-651

Corpus is an independent public-information project, not the official City of Montgomery website. Stable reference: corpuslaw.us/code/a5c545fe-fd34-4ce2-ab31-d181c6e14a92

Sec. 5-651. - General standards.

In all SFHAs and flood-prone areas regulated by the City of Montgomery, the following provisions are required for all proposed development including new construction and substantial improvements: (1) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including but, not limited to Section 404 of the Federal Water Pollution Control Act Amendments (1972, 33 U.S.C. 1334) and the Endangered Species Act (1973, 16 U.S.C. 15311544). Maintain such permits permanently with floodplain development permit file. (2) New construction and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (3) New construction and substantial improvements shall be constructed with materials resistant to flood damage below the BFE. (4) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damages. (5) New construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (6) Review subdivision proposals and other proposed development, including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding. If a subdivision proposal or other proposed development is in a SFHA, any such proposals shall be reviewed to assure that: a. They are consistent with the need to minimize flood damage within the SFHA; b. All public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damage; c. All new and replacement water supply systems are to be designed to minimize or eliminate infiltration of flood waters into the systems; d. All new and replacement sanitary sewage systems are to be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters; e. Onsite waste disposal systems are to be located to avoid impairment to them or contamination from them during flooding; and f. Adequate drainage provided to reduce exposure to flood hazards. (7) Manufactured homes shall be installed using methods and practices which minimize flood damage. They must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not to be limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local requirements for resisting wind forces. (8) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems. (9) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters. (10) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. (11) Any alteration, repair, reconstruction or improvement to new construction and substantial improvements which is not compliant with the provisions of this article, shall be undertaken only if the non-conformity is not furthered, extended or replaced. (12) Proposed new construction and substantial improvements that are partially located in a SFHA shall have the entire structure meet the standards of this article for new construction. (13) Where new construction and substantial improvements located in multiple SFHAs or in a SFHA with multiple BFEs, the entire structure shall meet the standards for the most hazardous SFHA and the highest BFE.

(Ord. No. 4-2026, 3-5-2026)

Ask a question about Montgomery law

Corpus searches the Montgomery sections it holds and shows the ones that match, with their citations. Free, no sign-in.