§ 14.08.050 — Time period for compliance/priority designation
Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026) · Pasadena Municipal Code § 14.08.050
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/abddad94-7aad-4655-bd78-ac8a4d057971
14.08.050 - Time period for compliance/priority designation.
A. Plan, Permits and Construction. Each building within the scope of this chapter shall be structurally altered to comply with the minimum standards in this chapter within the time periods shown in Table A. Minimum plan requirements shall be as specified by the building official. B. Screening Form. Within the time limits allowed in Table A, if the owner of any building believes he/she is not subject to the provisions of this chapter, owner shall submit a screening form to the building and safety division. The screening form shall be completed by a licensed civil or structural engineer and shall state whether the structure conforms to the earthquake design provisions contained in this chapter retrofit of said building shall not be required if screening form determines that the structure conforms with the earthquake design provisions of this chapter, as determined by the building official. Retrofit of said building shall be required if owner fails to submit the screening form within the time limit specified in Table A or if the screening form determines that the structure does not conform with the design requirements of this chapter. The requirement for said retrofit is not appealable if the screening form states that the structure does not conform to the earthquake design provisions contained in this chapter. TABLE A TIME PERIOD FOR COMPLIANCE Required Action by Owner | Submit Screening Form (Optional) | Retrofit Plans, and Obtain Permit | Complete Construction Milestone | 1 year from Notice to Owner | 3 years from Notice to Owner | 7 years from Notice to Owner C. Priority Designations. The building official shall prioritize enforcement of this Chapter as defined in Table B. TABLE B PRIORITY DESIGNATION Priority | Description Priority I. | Parcels containing buildings with 3 or more stories, or containing 25 or more dwelling units total, or Qualified Historic buildings (any size or number of units) Priority II. | Parcels containing 10 to 24 units total Priority III. | All parcels containing non-historic, 2-story buildings with 5 to 9 units total
(Ord. No. 7345, § 3, 5-20-2019)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
