12.5.1104: SIGNIFICANT INDUSTRIAL USER DISCHARGE PERMIT; CONDITIONS:
Significant industrial user wastewater discharge permits shall be expressly subject to all provisions of this Code, all other regulations, and user charges and fees established by Utilities. The conditions of significant industrial user wastewater discharge permits shall be uniformly enforced in accord with this article and applicable State and Federal regulations. Permit conditions and requirements may be modified by the Chief Executive Officer to ensure compliance with this article. It is unlawful to discharge or otherwise fail to comply with the conditions, terms, limits or requirements of the permit. Permit conditions may include, but not be limited to, the following:
A. The unit charge or schedule of charges and fees for the wastewater to be discharged to the system.
B. Reporting requirements to indicate chemical materials purchased, used, disposed and method of disposal, including a description of and limitations placed upon the discharge point.
C. Limits on rate, time, and characteristics, including average and maximum wastewater constituents and characteristics, of discharge or requirements for flow regulation and equalization.
D. Requirements for installation of inspection and sampling facilities and specifications for monitoring programs and/or recordkeeping.
E. Requirements for maintaining and submitting technical reports and records relating to wastewater discharges, quantities or general characteristics of process tank contents; and/or information concerning hazardous or toxic waste materials generation and disposal.
F. Compliance schedules; the schedules may not extend the compliance dates beyond applicable Federal deadlines.
G. Requirements for the installation of facilities or implementation of procedures and plans to prevent and control slug discharges of regulated materials at the user's premises; the procedures and plans shall include a description of discharge practices including nonroutine batch discharges, a description of stored chemicals, notification procedures to notify the Chief Executive Officer of slug discharges, accidental spills, dangerous chemical spills or discharge violations, and procedures to prevent adverse impact from accidental spills including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structure, and/or equipment for emergency response.
H. Statement of duration (in no case more than 5 years).
I. Statement of nontransferability without, at a minimum, ten (10) days' prior notification to the POTW and provision of a copy of the existing discharge permit to the new owner or operator.
J. Effluent limits and BMPs based on applicable general pretreatment standards in 40 CFR section 403, categorical pretreatment standards, local limits, and State and local law.
K. Self-monitoring, sampling, reporting, notification and recordkeeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, based on the applicable general pretreatment standards in 40 CFR section 403, categorical pretreatment standards, local limits, and State and local law.
L. Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements.
M. Documented plans, and requirements to submit the plans, describing the handling of materials regulated by part 7 of this article and 40 CFR section 403 for the Chief Executive Officer's approval. The plans may include, but not be limited to, toxic organic management plans, slug management control plans, and pretreatment system operation and management plans.
N. Documented plans, and requirements to submit the plans, describing how the user's pretreatment equipment will be operated and maintained.
O. A consent to entry onto the user's property to assess compliance by inspection, sampling, and monitoring.
P. Statement that upon request by the Chief Executive Officer, all records kept pursuant to this part shall be submitted to the Chief Executive Officer for review.
Q. Statement that renewal of a significant industrial user wastewater discharge permit shall be applied for and an updated permit application submitted to the Chief Executive Officer at least sixty (60) days prior to the expiration date contained in the permit.
R. Requirements for reporting significant changes, as indicated in subsection 12.5.1102D of this part, shall be included in the permit.
S. General and specific prohibitions, or other conditions to ensure compliance with this article. (Ord. 99-163; Ord. 01-42; Ord. 06-195; Ord. 10-82; Ord. 14-66; Ord. 18-42)