§ 223-11 — Electronically Monitored Boiler Plants
Milwaukee Code of Ordinances (Volumes 1-3 revised through Common Council action of Sept. 22, 2026) · Milwaukee Code of Ordinances § 223-11
Corpus is an independent public-information project, not the official City of Milwaukee website. Stable reference: corpuslaw.us/code/bd4ea635-842e-466c-bfd8-2b25d6761544
223-11. Electronically Monitored Boiler Plants.
1. PERMIT. a. Permit Required. No person may install, alter, repair or replace an electronically monitored boiler system without first obtaining a permit to do so. b. Permit Application. Applications shall be obtained from and filed with the department of city development. The application shall require the following information: b-1. Floor plans of the building indicating the location of the electronic monitoring station, the type and location of all boiler controls and valves, the location of the engineer on duty when the boiler is operating, and a written explanation or diagram of how the signal and notification system works. b-2. A description of the installation, alteration, repair or replacement work to be done. b-3. An outline of a preventive maintenance program which follows the ASME guidelines for care of boiler plants. b-4. Any other information which the department of city development deems necessary to insure safe operation of the boiler. c. Issuance of Permit. Upon approval of the application by the commissioner of city development, a permit shall be issued for only that work stated on the application. 2. GENERAL OPERATION REGULATIONS. a. Electronically monitored boilers shall be considered to be in operation when they are controlled by a thermostat, pressure control, water temperature control, timing device or other control device. b. In all cases the stationary engineer or assistant with the proper operating permit shall properly maintain and control the equipment. c. Whenever the engineer is not stationed in a position to manually control or visually monitor the control equipment, the name of the engineer who is on duty and information on how the engineer may be contacted shall be clearly displayed in the boiler room. d. The commissioner may shut down all boilers, turbines or engines which are not maintained by an engineer with the proper grade of operating permit. e. Monitoring may be performed by personnel without a stationary engineer permit from a location approved by the commissioner, provided all responses to the equipment are performed by personnel with the proper operating permit. f. Failure of the monitoring or control equipment shall revert control of the plant immediately to the person responsible for safe operation of the plant or an assistant with the proper operating permit. g. The commissioner may require additional equipment, alterations or procedures, as may be deemed necessary, to insure the safe operation of the plant. h. No equipment may be installed on any electronically monitored boiler plants which would disconnect or override the safety controls. 3. REMOTE MONITORING 1st CLASS, 2nd CLASS, 3rd CLASS AND 4th CLASS PLANTS. Where the stationary engineer responsible for the safe operation of the plant or an assistant with the proper operating permit is not stationed in a position to visually monitor the control equipment at all times while the boilers, engines or turbines are in operation, remote monitoring may be permitted, if the following requirements are met: a. The plant shall be continuously monitored while in operation. b. Monitoring equipment for boilers shall include the following functions: b-1. Low water cut-off alarm with manual reset. b-2. High pressure alarm with manual reset. b-3. Flame failure alarm with manual reset. b-4. Loss of power to monitoring system. b-5. Dual gas shutoff valves for boiler. c. Monitoring equipment for turbines or engines shall include the following functions: c-1. Overspeed trip and alarm. c-2. Loss of power to monitoring system. d. Monitoring equipment for an electronically controlled boiler used for laundry and dry cleaning purposes with a maximum of 20 plant boiler horsepower output as rated by the boiler manufacturer rating or Wisconsin administrative code, shall include the following functions: d-1. Low water cut-off alarm with manual reset. d-2. High pressure alarm with manual reset. e. Remote monitoring of a 1st class, 2nd class, 3rd class or 4th class plant shall have an approved preventative maintenance program in accordance with guidelines set in ASME section VII. 4. REMOTE MONITORING; LOW PRESSURE PLANTS. Remote monitoring of low pressure plants may be permitted if the following requirements are met: a. If an engineer is not manually controlling the plant, it shall be continuously monitored while in operation. b. Monitoring equipment for the boilers shall include the following functions: b-1. Low water cut-off alarm with manual reset. b-2. High pressure alarm with manual reset. b-3. Flame failure alarm. b-4. Loss of power to monitoring system. c. The commissioner shall be furnished with a list of the names of stationary engineers employed by the owner or monitoring service and assigned to boiler surveillance and shall be notified within 3 days whenever names are added or removed from such list. d. The commissioner shall be notified by monitoring services when a boiler will be monitored at a central station and when a boiler which has been monitored is no longer under contract for such services. Such notification shall be made within 30 days prior to terminating the service. e. Remote monitoring of a low pressure plant shall have an approved preventative maintenance program in accordance with guidelines set in ASME section VI. 5. TESTING. After the plant has been equipped for electronic monitoring, the system shall be tested and put into safe operating condition. A certificate stating that the plant, its controls and the monitoring system are operating properly shall be furnished to the commissioner. The certificate shall be signed and sealed by an engineer registered by the state of Wisconsin, who shall act as an agent for the owner of the system. 6. INSPECTIONS. Each electronically monitored plant, its controls and monitoring system, shall be inspected annually by an installer to insure that it is operating properly. A certificate stating that the plant is operating properly shall be signed and sealed by an engineer registered by the state of Wisconsin, who shall act as an agent for the owner of the system. The certificate shall be furnished to the department prior to putting the system into permanent operation and annually thereafter. The inspections shall also be noted in the daily log. Municipal Research Library. Pages 167-190 are blank.
Ask a question about Milwaukee law
Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
