Sec. 22.5-93. - Standards and requirements: Construction.
Construction IAQ Management Plan. Prior to the issuance of a building permit, a statement of the plans detailing the Construction IAQ Management actions to be implemented during the construction and pre-occupancy phases of the building shall be submitted to the city and shall include:
(1) Construction IAQ Management plan that shall be based upon the recommended Control Measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition 2007, ANSI/SMACNA 008-2008, Chapter 3; and
(2) Proof that on-site or installed absorptive materials will be protected from moisture damage; and
(3) If permanently installed air handlers are used during construction, proof that filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 will be used at each return air grille. In addition, all filtration media shall be replaced immediately prior to occupancy.
(Ord. No. 13080, § 2, 7-9-09)