Same—Concrete base.
Omaha Municipal Code § 34-30
in effectSec. 34-30. - Same—Concrete base.
The concrete base repair in pavement with an asphalt surface over concrete or brick base shall be as thick as the surrounding pavement base, but in no case shall the concrete base repair be less than six inches (150 mm) in thickness.
The thickness will be measured from the top of the surrounding base downward. The concrete base shall only be as high as the surrounding base and shall not extend into any upper layers of asphalt surfacing material except where directed by the public works director the concrete base may extend into the asphalt surface.
During the period from December 1 to March 1, streets with concrete bases will not receive concrete in the cut unless weather permits concrete to be used. Asphalt will be placed to a sufficient depth of base plus asphalt surface in the cut from the subgrade to the surface to allow for winter maintenance of the cut. Such repairs shall be considered temporary and permanent repairs will be made when availability of materials, work schedules and weather allows.
(Code 1980, § 34-30; Ord. No. 34464, § 1, 2-3-98)
Source: City of Omaha, Municipal Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ne/omaha/codes/code_of_ordinances?nodeId=PTIIMUCO_CH34STOTPUWA_ARTIIEX_DIV1GE_S34-30SAONBAFetched: 10/28/2026
