For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-80 — Facility size and locations

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton City Code § 25-80

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/c3e1916f-0fcb-4e1a-818d-e0a139b702dc

Sec. 25-80. - Facility size and locations.

(a) These provisions apply to all facilities, including those of franchise utilities, unless otherwise addressed in a separate agreement. (b) The city engineer reserves the right, in the permit or otherwise, to restrict or determine the route (pathway) and/or spatial location, whether horizontal, vertical, or depth, of any facility and/or structure or improvement in the right-of-way. The city engineer reserves the right to reserve space for future utilities or public improvement projects. (c) All underground right-of-way user facilities are required to maintain a minimum depth of thirty-six (36) inches below top of curb, or thirty (30) inches below the lowest point of the grade of the street surface where there is no curb. If a right-of-way user may encounter a hardship due to this requirement, the right-of-way user may request an exception to the minimum depth requirement in writing and in advance with the application for permit. Any exception granted will be subject to the city engineer's approval or denial with the application, and only applicable to a single issued permit or instance. The city will not be responsible for any damage it may cause to facilities located in the rights-of-way that are not maintained in accordance with these requirements. (d) Any right-of-way user with existing facilities which are less than thirty (30) inches below a concrete or asphalt surface shall notify and work closely with the person performing excavation to establish the exact location of its facilities and the best procedure for excavation. (e) All right-of-way user facilities are required to maintain a minimum separation of twenty-four (24) inches from all city utility system facilities. If a right-of-way user may encounter a hardship due to this requirement, the right-of-way user may request a variance to the minimum separation requirement in writing and in advance with the permit application. Any exception granted will be subject to the city engineer's approval or denial with the permit application, and only applicable to a single issued permit. (f) The right-of-way user shall ensure all overhead lines are constructed and maintained so that the minimum clearances follow the National Electrical Safety Code as amended. The city shall not be liable for any damages, injuries, or claims arising from the providers actions or omissions. (g) Preserve sight visibility and access. No facilities shall be located within the vision clearance area. Accessibility to property may not be compromised by facilities except during construction. (h) Temporary utilities. Temporary utilities may be in non-standard locations at the discretion of the city engineer. (i) General construction and maintenance requirements. Facilities and poles shall be constructed and maintained in a manner that does not: (1) Obstruct, impede, or hinder the usual travel or public safety on a right-of-way; (2) Obstruct the legal use of a right-of-way by other right-of-way users; (3) Violate applicable codes, statutes, historic preservation laws, or other law; (4) Interfere with the city's public safety infrastructure; (5) Violate or conflict with this division; or (6) Violate the Federal Americans with Disabilities Act and state accessibility standards.

(Ord. No. 2019-2439, § I, 11-19-19)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.