Backfilling.
Omaha Municipal Code § 34-23
in effectSec. 34-23. - Backfilling.
All excavations in any public right-of-way, street, alley or boulevard shall be backfilled and compacted in accordance with the most current edition of the city's Standard Specification for Public Works Construction, unless otherwise authorized by the public works director or his/her authorized representative. The permittee shall be responsible for all repair costs due to backfill settlement of one inch (25 mm) or more for a period of one year from the date of acceptance by the city or expiration of the street excavation permit.
The public works department will make such tests, including inspections of backfilled excavations in the public right-of-way and outside of the paved area, as it deems necessary to assure compliance with this section.
All backfilling material must be free of large rocks or trash, and the excavation shall be backfilled as above specified and filled flush with the surface in sidewalk cuts, and, in pavement cuts, filled to the bottom of the pavement elevation or as directed by the public works director or his/her designated representative.
All surplus material shall be removed from the location by the person making the excavation.
(Code 1980, § 34-23; Ord. No. 34464, § 1, 2-3-98; Ord. No. 37157, § 2, 10-18-05)
Source: City of Omaha, Municipal Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ne/omaha/codes/code_of_ordinances?nodeId=PTIIMUCO_CH34STOTPUWA_ARTIIEX_DIV1GE_S34-23BAFetched: 10/28/2026
