§ 13.04.087 — Unmetered rates—demand at or above 30 kW (Schedule CE-2)
Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026) · Pasadena Municipal Code § 13.04.087
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/cb0640a7-c0a7-4d28-9e63-b255ea1305c2
13.04.087 - Unmetered rates—demand at or above 30 kW (Schedule CE-2)
The terms and conditions of services hereunder shall be provided by Schedule CE-2, demand, as found in the Electric Utility Rate Resolution. A. Applicability. Applies to any unmetered telecommunications devices and other equipment with 30 kW demand or greater, but less than 300 kW demand where metering installations would be impractical, unavailable, uneconomical or restricted by the City. B. Billing determinants. 1. Monthly energy consumption. PWP shall determine the monthly energy consumption by multiplying the number of hours in the billing period by the maximum hourly energy consumption of the unmetered equipment based on the manufacturer's specifications and operating characteristics. For the purpose of this schedule, monthly energy consumption shall be deemed to be the kWh delivered. 2. Monthly billing demand. PWP shall determine the monthly billing demand based on the maximum demand (kW) of the telecommunications devices and other equipment as set forth in the manufacturer's specifications. 3. Customer shall pay the sum of the (1) customer charge for either (a) single-phase service or (b) three-phase service. (2) distribution charge, (3) grid access charge, (4) energy services charge based on monthly energy consumption, and (5) transmission services charge. 4. Customer shall be solely responsible to install, own, operate, and maintain all equipment. City shall not be responsible for any damage to customer's equipment under any circumstances. 5. Customer and PWP shall mutually agree upon each location for unmetered telecommunications devices and other equipment installations. Each location or connection shall be deemed a separate account. 6. Customer shall not increase connected load or change the character of telecommunications devices and other equipment without providing written prior notice to PWP of at least 30 days. Customer shall furnish PWP written notice of any change in the connection configuration, rated electrical load, or operating characteristics of such equipment. In event customer does not provide such written notice, PWP may estimate customer's actual energy use and back bill the customer. 7. PWP may audit customer's equipment using a temporary meter. Customer's fixed electric rate shall be adjusted based upon the results of the audit. Customer shall provide City personnel with access to customer's equipment and provide assistance as necessary to complete the audit within seven calendar days of written request.
(Ord. No. 7466, § 19, 3-30-2026; Ord. No. 7221, § 11, 7-9-2012; Ord. 7203 § 3, 2011)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
