§ 29-196 — Land restoration requirements
The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 29-196
Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/ce39bcde-7e2b-4b64-a37e-e84b999c13e0
Sec. 29-196. - Land restoration requirements.
All land restoration corrective action activities resulting from land alteration violations shall comply with following conditions: (1) Submit site restoration and erosion control plans to department of planning and development. Prior to any restoration work, a release of affected departments will be obtained. (2) All restoration work must be begin within ten (10) calendar days of plans approval and conclude within thirty (30) calendar days of commencement unless otherwise provided by the approved plan or other uncontrollable conditions. (3) Prior to commencing restoration activities, erosion controls such as silt fence, hay bales, and rock check dams shall be installed and shall remain in place until restoration activities are complete. (4) Return all ground surface contours to those in existence prior to land alteration violation while maintaining positive drainage. All slopes must be 3:1 or flatter. Terraces are prohibited. (5) All spoil materials and debris including tree debris must be removed from the property. (6) Replant one (1) tree for every seven hundred fifty (750) square feet of the area of violation, as determined by the city official, with an average linear spacing of not less than thirty (30) feet with at least two-inch caliper nursery- or farm-grown trees of the same species as those cleared, harvested, removed or damaged. Planting specifications shall be provided on the plan including soil preparation, staking and other necessary measures to ensure trees thrive. If the city official determines the current season of the year is not conducive to sustaining life for trees, the time compliance with these provisions may be extended for not more than one hundred eighty (180) days. (7) Establish a permanent vegetative cover of perennial grasses with the addition of fertilizer mixes conducive to site conditions. (8) For one (1) year, restored trees shall be watered once per month and additionally every ten (10) calendar days during the months of June, July, August, and September. (9) Final inspection and approval is required following completion of required restoration activities. All incomplete items or additional work identified during the final inspection must be completed within seven (7) calendar days following the final inspection. (10) All restoration work is to be guaranteed by the responsible party in the form of cash, surety bond or letter of credit as referenced in subsection 31-431(2) for two (2) years following its installation and approval by the department of planning and development. (11) All permits and approvals must be obtained from all federal, state, and local agencies prior to commencing work. (12) All restoration work shall be required as stated above unless approved otherwise by the city official.
(Ord. No. 19,353, § 2, 7-19-05; Ord. No. 21,867, § 1, 5-19-20)
Ask a question about Little Rock law
Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.