§ 19-55 - Contributions in aid of construction.
(a) Manner of paying; payment prerequisite to rendering service. The city requires the payment of contributions in aid of construction, either by cash payments, or acquisition of service area rights from non-city owned utility providers, or through the installation of offsite water or irrigation water distribution and wastewater collection facilities transferred to the city, or a combination of the three forms of contributions. The requirement of the city for the contributions is declared to be for the purpose of defraying the cost of the water and irrigation water distribution and wastewater collection systems. The payment by the developer or owner of such contributions to the city shall be a condition precedent to the rendering of service by the city's Utilities Department.
(b) Determination of charges; amount.
1. CIAC fee rates shall be the rates as stated within the City Council approved resolution establishing the most current UEP rates. The same unit of measure in UEP shall be used in the CIAC calculation.
2. For parcels greater than two acres in size, the city may apply an oversize parcel discount. The oversize discount shall be calculated by measuring into the parcel 200 feet from each side of the parcel that abuts a right-of-way where utility service is available and computing that parcel area. This area shall be subject to 100% of the EP Rates. The remaining square footage within the parcel (the oversized area) shall be calculated at 30% and added to the fully assessable square footage.
3. The typical rectangular lot is also used at dead-end streets and cul-de-sacs, creating irregular lots with an area between 5,000 and 7,000 square feet, the additional area being located in tab like appendages or "hammerheads" that exist only because of the dead-end or cul-de-sac location and cannot be used for set back or other improvement purposes. To avoid an inequity between these lots and other typical lots, the area of residential platted lots located at a dead-end or cul-de-sac that exceeds 5,000 square feet, but is less than 7,000 square feet, shall be disregarded. The contribution in aid of construction for these properties will be determined by deleting the unbuildable area from the total area. This reduction will only apply to wastewater and water CIAC, but not irrigation CIAC.
4. CIAC rates may be periodically examined in order to provide a uniform charge to those connecting to the existing systems. It is the intent of this section that the City Council periodically re-examine the charges contained herein so that they will reflect, as nearly as possible, the current costs of construction as well as the cost of funding the unused portion of the system to the date of proposed development of each individual building site.
(c) Time of payment - new construction. For new construction in areas where utility service is currently available, the CIAC fee will be assessed based upon new construction permit application date and shall be due and payable at the same time the new construction/site development review fees are paid. CIAC fees shall be due for each service when the service becomes available.
(d) Time of payment - relocated structures. When a structure is moved from one location to another, a CIAC fee will be collected for the new location regardless of whether CIAC fees have been paid at the old location, unless the use at the new location is a replacement of an equivalent use. If the structure moved is replaced by an equivalent use, no CIAC fee is owed for the replacement use. In every case, the fee payer bears the burden of proving past payment of CIAC fees or equivalency of use. The CIAC fee shall be due and payable at the same time the site development review fees are paid.
(e) Time of payment - redeveloped properties.
1. When property is redeveloped, CIAC fees shall remain with the parcel.
2. Additional CIAC fees shall not be due unless additional property for which CIAC fees were due and unpaid is combined with the original parcel. In such instances, the parcel owner shall be required to pay the CIAC fees for the square footage not previously paid.
3. For parcel split/combines, or undeveloped land, CIAC fees shall be assessed for any parcel area not previously assessed a CIAC fee.
4. For parcel split/combines that involve a portion of land that previously paid an ERU based CIAC fee, the original parcel area will be considered paid. As a result of the parcel combine, CIAC may be due on the additional square footage.
5. Should the CIAC fee remain unpaid, and the surrounding parcels are included within a Utility Extension Project, the portion of land which the CIAC fees are unpaid may be included within the UEP.
(f) Time of payment - existing structures. For existing structures in areas where utility service has become available, the CIAC fee shall be assessed upon utility permit application date and shall be due and payable upon issuance of the utility permit. In instances where a utility permit is not applied for, the City may initiate the delinquent CIAC process beginning 180 days from notification of the availability of sewer, irrigation and water service. CIAC fees shall be due for each service when the service becomes available and will be calculated on parcel area.
(g) Application of proceeds from fees. The proceeds of all contributions in aid of construction with respect to the water, wastewater or irrigation water systems shall be applied only to the payment of the cost of expansion of the respective system, for renewal and replacement projects, and to the payment of any bonds to which the contributions in aid of construction shall have been pledged or may be legally used.
(h) Payment of charges.
(1) a.
General. All CIAC must be paid as described in (c), (d), (e), or (f) above, or an agreement to pay CIAC through annual installments as described in subsection (h)(1)b. or c. below, must be signed and filed with the city's Financial Services Department prior to issuance of a permit. All CIAC pertaining to each parcel must be paid, or an annual installment agreement executed prior to the issuance of a permit. This applies to platted and unplatted property. Failure to pay the CIAC when due may result in revocation of any development permits that have been issued for the property and will prohibit the issuance of a temporary certificate of occupancy, certificate of occupancy, or certificate of use.
b. Annual installment agreement. If the property owner elects to pay the contribution in aid of construction in an annual installment agreement, the City shall require the property owner to execute a CIAC agreement in the amount of the outstanding balance of the contribution in aid of construction for the property. The agreement shall be recorded in the public records for Lee County. A recording fee, as provided for in the schedule of charges established by the Lee County Clerk of the Circuit Court shall be paid by the property owner(s) to the city. Owners electing to pay the CIAC in installments may, but are not required to, make an initial down payment at the time of making application to pay the CIAC in installments. The remaining principal balance shall be paid in equal principal annual installments, not exceeding 15, plus interest and collection costs. The interest rate shall be determined at the time of application to pay in installments and such installments shall become part of the non-ad valorem assessment property tax bill. The interest portion of the annual payment shall be calculated annually on the remaining principal balance. The interest rate shall be a fixed rate, shall be established at the time of application to pay the CIAC in installments and shall equal the current prime lending rate, as published in the Wall Street Journal on the last day of the month preceding the application, plus 1%, plus a 1% administrative fee and shall be effective the first day of the current month. The interest rate shall remain fixed until the annual installment agreement is paid in full. There shall be no penalty for prepayment in full. The property owner may pay the contribution in aid of construction in its entirety within 30 days from initial payment being due with no interest charge.
c. Deferred payment agreement. Payment of the contribution in aid of construction due to be paid for any parcel of land being developed in no way other than clearing the land, add fill material to the land, the platting thereof and/or the construction thereon of roads, drainage facilities and/or utility facilities may be deferred and paid pursuant to a deferred payment agreement. A deferred payment agreement shall require a proportional payment of the CIAC for each part of the project area/parcel upon issuance of a building permit for such part, transfer of title to such part, or the passage of 15 years, whichever occurs first. After the deferral period, the balance of the loan will be placed on the non-ad valorem property tax bill as outlined in the deferral agreement.
(2) a.
Development of the property prior to paying a CIAC does not relieve the property owner of the responsibility to the city for contributions in aid of construction. In the event of this occurrence due to oversight or City Council action, the property owner will be billed accordingly and must submit payment or enter into an installment agreement. Failure to do so will result in the CIAC being placed on the non-ad valorem property tax bill along with interest and collection costs.
b. The property owner may either pay the CIAC in full or finance the fee as prescribed. Financing the fee requires an annual installment agreement as described in subsection (h)(1)b. above. The CIAC fee shall be due and payable within 180 days from the date the notice of availability is sent to the property owner. After the expiration of 150 days from the date the notice of availability was sent, the city shall send a bill for any unpaid CIAC fees to the property owner of record which states that CIAC fees are due and payable, will become delinquent if not paid in full or financed within 30 days, and shall include a statement that failure to pay in full or consent to finance the fees as a non-ad valorem assessment within the 30-day period or to request, in writing, an opportunity to contest the fees before the City Council, will result in the city using the uniform method of collecting the CIAC fees in accordance with F.S. § 197.3632. The bill shall be delivered to the owner by U.S. Mail, Return Receipt Requested, using the address of the owner as stated on the County Property Appraiser's records, or by hand delivery.
c. Right to contest Non-ad valorem assessment installment method. Any property owner who desires to contest the imposition of involuntary CIAC non-ad valorem assessment installments must submit a written request to the Director of Financial Services within 30 days from the date the bill for unpaid CIAC fees was mailed or hand delivered by the city. The request shall be scheduled for City Council consideration as soon as practicable. The City Council, after hearing from the property owner and staff, shall determine whether to modify or correct the CIAC fees. The property owner shall have 15 days from the date of the City Council action to pay the full amount of the CIAC fee found by the City Council to be due. Failure to pay the fee in full within said 15-day period shall result in the execution and filing of a Non-ad valorem assessment installment schedule by the City Manager or designee for the amount due.
d. Imposition of Non-ad valorem assessment installment schedule for delinquent CIAC fees. If the owner has not entered into an annual installment agreement and has not paid the CIAC fees in full within 30 days of the date the bill was mailed or hand delivered, and the owner has not submitted a written request to the city to contest the billing in front of the City Council, or the owner has contested the billing and same are found to be valid by the City Council, the City Manager, or his or her designee, shall execute and record a Non-ad valorem assessment installment schedule against the property for the amount of the CIAC fees remaining due plus a recording fee. The CIAC fees contained in the Non-ad valorem assessment installment schedule shall bear interest at the rate provided for in F.S. § 55.03 for interest on judgments.
e. Release of lien. For owners who financed the CIAC fee utilizing the legacy lien process and have paid their lien in full, and upon request, the City will prepare a release of lien. The property owner shall be responsible for all fees associated with recording the release of lien.
f. Other means. Nothing herein shall prohibit the city from utilizing other means to collect delinquent CIAC including, but not limited to, an action for damages filed with the appropriate court in Lee County or collection of the delinquent amount as a non-ad valorem assessment, as follows:
1. In lieu of foreclosure, any CIAC, which was financed through the legacy lien process and is delinquent by more than six months may be collected as a non-ad valorem assessment pursuant to F.S. § 197.3632.
2. Amount of Non-Ad Valorem Assessment.
(A) The non-ad valorem assessment shall include the delinquent CIAC together with interest accrued thereupon, and each annual installment shall include administrative and collection costs, fees and expenses imposed by the county property appraiser or county tax collector under F.S. § 197.3632, and amounts necessary to account for the early payment discount for ad valorem property taxes and non-ad valorem assessments.
(B) The non-ad valorem assessment shall not include any accrued and unpaid penalties or fines. Upon payment in full of the total amount of the non-ad valorem assessment, any such accrued penalties or fines shall be waived and the city shall prepare a satisfaction or release of lien for the CIAC in the public records.
3. Intent Resolution. Prior to commencing collection of the non-ad valorem assessment, the city shall adopt a resolution stating the city's intent to use the uniform method of collection and provide notice of its intent to consider such resolution in accordance with F.S. § 197.3632(3).
4. Initial Assessment Resolution. After adoption of the intent resolution, City Council shall consider an initial assessment resolution. The initial assessment resolution shall at a minimum:
(A) Describe the parcels subject to the non-ad valorem assessment.
(B) Describe the schedule for collection of the non-ad valorem assessment in annual installments which, unless determined otherwise in the initial assessment resolution, shall be as follows: Any delinquent amount less than $1,000 may be collected by the city in one annual installment; amounts over $1,000 but less than $2,000 may be collected in three annual installments; and amounts over $2,000 may be collected in five annual installments.
(C) Schedule a public hearing at a meeting of the City Council, which meeting shall be a regular, adjourned or special meeting, at which to hear objections of all interested persons and to consider adoption of a final assessment resolution approving the non-ad valorem assessment roll.
(D) Direct City staff to prepare the non-ad valorem assessment roll, publish and mail notice required by F.S. § 197.3632 using information then available from the ad valorem tax roll maintained by the county property appraiser.
5. Non-Ad Valorem Assessment Roll.
(A) Upon adoption of the initial assessment resolution, city staff shall prepare a preliminary non-ad valorem assessment roll that contains the following information:
i. A summary description of each parcel of property (conforming to the description contained on the ad valorem tax roll) subject to the non-ad valorem assessment;
ii. The name of the owner of record of each parcel, as shown on the ad valorem tax roll;
iii. The number of equivalent parcels (EPs) and/or equivalent residential units ERUs attributed to each parcel;
(B) Copies of the initial assessment resolution and the preliminary non-ad valorem assessment roll shall be on file with the City Clerk's Office and open to public inspection.
6. Notice by Publication. After adoption of the initial assessment resolution, the city shall publish once in a newspaper of general circulation within Lee County a notice stating that at a meeting of the City Council on a certain day and hour, not earlier than 20 calendar days from such publication, which meeting shall be a regular, adjourned or special meeting, the City Council will conduct a public hearing to receive input and objections of all interested persons to the final assessment resolution and approval of the non-ad valorem assessment roll. The published notice shall conform to the requirements set forth in F.S. § 197.3632.
7. Notice by Mail.
(A) In addition to the published notice required by this section, the city shall provide notice of the public hearing by first class mail to the owner of each parcel of property subject to the non-ad valorem assessment. The mailed notice shall conform to the requirements set forth in F.S. § 197.3632 and shall be mailed at least 20 calendar days prior to the hearing to each property owner at such address as is shown on the tax roll on the twentieth calendar day prior to the date of mailing. Notice shall be deemed mailed upon delivery thereof to the possession of the U.S. Postal Service.
(B) The notice shall include, among other things, the intent of the city to collect the non-ad valorem assessment pursuant to the uniform method authorized by F.S. § 197.3632, if not paid in full by the following September 1, or such other date as may be determined in the initial resolution.
(C) City staff may provide proof of such notice by affidavit. Notwithstanding anything herein to the contrary, notice of a proposed Assessment may be given in any manner authorized by law.
8. Adoption of Final Assessment Resolution. At the time named in such notices, or to which an adjournment or continuance may be taken, the City Council shall conduct the public hearing to receive written objections and hear testimony of interested persons and may then, or at any subsequent meeting of the City Council, adopt the final assessment resolution which shall:
(A) Confirm, modify or repeal the initial assessment resolution with such amendments, if any, as may be deemed appropriate by the City Council;
(B) Approve the non-ad valorem assessment roll, with such amendments as it deems just and right; and
(C) Direct certification and delivery of the non-ad valorem assessment roll to the county tax collector no later than September 15 of the current year.
9. Certification of Non-Ad Valorem Assessment Roll. The non-ad valorem assessment roll will be comprised of properties that have had levied against them non-ad valorem assessments under this article, where such assessment has not otherwise been paid in full prior to delivery of the roll to the county tax collector. Prior to certifying the non-ad valorem assessment roll to the county tax collector, City staff shall remove from such roll any parcel for which the assessment has been paid in full.
10. Annual Assessment Resolution. The City Council shall adopt an annual assessment resolution during its budget adoption process for each fiscal year in which non-ad valorem assessments are imposed hereunder to approve the non-ad valorem assessment roll for such fiscal year. The final assessment resolution shall constitute the annual assessment resolution for the initial fiscal year. The non-ad valorem assessment roll shall be confirmed or amended by the annual assessment resolution to reflect the then applicable annual installment of the non-ad valorem assessment. If a non-ad valorem assessment is imposed hereunder against property not previously subject thereto, the city shall provide mailed notice to the owner of such property in accordance with this section and conduct a public hearing prior to adoption of the annual assessment resolution. Failure to adopt an annual assessment resolution during the budget adoption process may be cured at any time.
11. Effect of Assessment Resolutions. The adoption of the final assessment resolution or of an annual assessment resolution requiring notice as provided in paragraph 10. above, shall be the final adjudication of the issues presented (including but not limited to adoption of the non-ad valorem assessment roll and the levy and lien of the non-ad valorem assessments), unless proper steps are initiated in a court of competent jurisdiction to secure relief within 20 days from the date of the City Council's adoption of the final assessment resolution. The non-ad valorem assessments for each fiscal year shall be established upon adoption of the annual assessment resolution.
12. Proceeds of the Non-Ad Valorem Assessments. Proceeds of the non-ad valorem assessments, after payment of fees, costs and expenses associated with collection of the assessments, shall be deposited to the respective trust funds established for the water, wastewater and irrigation CIAC Fees and thereafter applies only to the payment of the cost of expansion of the respective system, and to the payment of any bonds to which the CIAC fees shall have been pledged or may be legally used.
13. Prepayment. The owners of property subject to a non-ad valorem assessment imposed hereunder may, at their option, prepay the assessment in full at any time; provided, however, that during any period commencing on the date the annual non-ad valorem assessment roll is certified for collection to the county tax collector and ending on the next date on which unpaid ad valorem taxes become delinquent, the city may reduce the amount required to prepay the non-ad valorem assessments imposed against any parcel of property by the amount of the assessment certified for collection with respect to such parcel.
14. Other Applicable Provisions. Except as otherwise set forth above, non-ad valorem assessments imposed hereunder shall be administered in accordance with Chapter 17, Article III of the City Code. The city shall comply with any other requirements of F.S. § 197.3632.
15. Collection of Non-Ad Valorem Assessments. The non-ad valorem assessments collected pursuant to this section will be included in the combined notice for ad valorem taxes and non-ad valorem assessments as provided in F.S. § 197.3635, including provisions relating to discount for early payment, prepayment by installment method, deferred payment, penalty for delinquent payment, and issuance and sale of tax certificates and tax deeds for nonpayment.
16. Agreement to reimburse county property appraiser and county tax collector. In order to use the uniform method for the levy, collection, and enforcement of the non-ad valorem assessments, the city is authorized to enter into a written agreement with the county property appraiser and the county tax collector providing for the reimbursement of their costs incurred in the administration and collection of the non-ad valorem assessments levied under this article.
17. Additional CIAC. Payment of any non-ad valorem assessment imposed hereunder shall not relieve the owner of affected property from the obligation to pay additional CIAC in the event the property is developed to a greater intensity or if property is combined with original parcel. CIAC will be due for the increased intensity or the additional square footage over the original amount of the non-ad valorem assessment.
(i) Computation. The aggregate value of contributions in aid of construction required by the city, either in cash or by utility system construction donated to the city, shall be computed and determined as follows:
(1) On-site facilities
a. Each developer or owner (hereinafter referred to as developer) shall be responsible for the design, installation, inspection and testing of the complete water and irrigation water distribution and wastewater collection system located in the street or streets and wastewater collection system located in the rights-of-way or easements adjoining or within the boundaries of the developer's property, or the equivalent cost of the same in the event the facilities have been previously designed and/or installed.
b. The term COMPLETE WATER AND IRRIGATION WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM, as used herein, shall include all component parts of a water and/or irrigation water distribution system and/or wastewater collection system, including valves, fittings, laterals, hydrants and all appurtenances as shown upon the approved design of the water distribution system. The wastewater collection system shall include all collection lines, manholes, lift stations, and all other appurtenances as shown upon the approved design for the installation of the wastewater collection system.
c. The city's requirement for the installation of oversized system components located on the developer's property and designed to provide service for other properties, shall be the subject of a refunding agreement as set forth hereafter in this extension policy.
(2) Off-site water and irrigation water distribution and wastewater collection system/hydraulic share.
a. The location, size or proposed density of the developer's property may make service to the property dependent upon the extension of off-site water and irrigation water distribution and wastewater collection systems. For the purpose of this extension policy, the term OFF-SITE shall be defined as those components of the water and irrigation water transmission system, and/or wastewater collection system necessary to connect the developer's property with city's component of the system which is adequate in size to transmit to the developer's property a quantity of water and irrigation water under adequate pressure and/or transmit wastewater collected on the developer's property to the treatment plant or disposal site of the city.
b. The physical location of the off-site components of the system may, in fact, be within the geographic boundaries of the developer's property, however, the geographic location shall not change the character of the off-site components of the system since the same relates to major water and irrigation water transmission and wastewater collection system serving major developed areas or more than one developer's property.
c. It is the city's policy to apportion the cost of the water and irrigation water transmission and wastewater collection system pro rata against the properties receiving service from the components of the system located off-site as to the developer's property. For pro- rata cost apportionment, undeveloped properties will be treated as a unit of equivalent parcel (EP).
d. Since each developer draws from the hydraulic capacity of the system, the city will require that the developer pay his or her property's hydraulic share of the cost of the off-site water and irrigation water transmission and wastewater collection system through which service is rendered to the developer's property. This portion of the city's extension policy is referred to as the developer's "hydraulic share of off-site facilities".
e. It is further declared and established that the city will compute the hydraulic share of off-site components of the system based upon three major factors which will contribute to the engineering determination:
1. The number of required equivalent parcels (EPs) as determined by a professional engineer's (PE) design.
2. The density and estimated consumption to be generated from the property as it is proposed to be developed; and
3. Related fire flow requirements.
f. The city further declares that the charge for the developer's hydraulic share of off-site component of the system will be applicable to the developer's property whether or not the water and irrigation water transmission and wastewater collection system have been previously constructed. It is the intent of this section to apportion the cost of the components of the water and irrigation water transmission and wastewater collection system on a fair share basis irrespective of whether the water and irrigation water transmission and wastewater collection systems have been previously constructed or are proposed to be constructed.
g. Developers may be required to advance all or a portion of the water, wastewater and irrigation transmission or distribution systems in order to provide a physical interconnection of the developer's property with the city's system at their then present terminus. Any offsite improvements that do not serve other parcels shall be the sole responsibility of the developer. The eventualities are covered by provisions in this extension policy in § 19-66.
(j) CIAC paid as non-ad valorem assessments. As an alternative to payment of the CIAC in installments as provided in paragraph (h) above, and notwithstanding anything in this chapter to the contrary, the city may collect the CIAC as non-ad valorem assessments pursuant to F.S. § 197.3632; provided, however, that the city shall not be required to follow the public hearing and notice process set forth in F.S. § 197.3632(4) if the owner of the property provides written consent for the non-ad valorem assessment in accordance with F.S. § 197.3632(4)(a)(3).
(Ord. 24-75, § 2, 5-5-1975; Ord. 63-89, 10-10-1989; Ord. 17-93, 5-10-1993; Ord. 49-96, 9-24-1996; Ord. 44-11, 8-22-2011; Ord. 8-13, § 2, 2-25-2013; Ord. 108-22, § 3, 1-11-2023)