For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-60 — Easements and rights-of-way

Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Code of Ordinances § 19-60

Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/e7f7a503-626b-40df-abed-3fc3ded82cb7

§ 19-60 - Easements and rights-of-way.

As a prerequisite to the construction of any water distribution, wastewater collection or irrigation water system proposed to be connected to the facilities of the city, the developer shall grant to the city such easements or rights-of-way corresponding with the installation of the proposed facilities. The grant or conveyance shall be in form satisfactory to the City Attorney. The conveyances, when located on the property of the developer, shall be made without cost to the city. The city reserves the right to require the easement or right-of-way to the point at which the meter is proposed to be installed or at the "point of delivery of service," being the point at which the facilities of the city join with the consumer's own installation.

(Ord. 24-75, § 7, 5-5-1975; Ord. 63-89, 10-10-1989; Ord. 49-96, 9-24-1996)

Ask a question about Cape Coral law

Corpus searches the Cape Coral sections it holds and shows the ones that match, with their citations. Free, no sign-in.