40.07 - PLAN REVIEW AND PERMITS FOR CONSTRUCTION, INSTALLATION, AND ALTERATION.
(1) General Requirements. An elevator contractor shall submit plans and permit applications for the installation of any new or altered conveyance to the Chief for approval. Such application shall be submitted on a permit form as required by the Chief. No work shall commence before the plans and permit application for conveyances are approved by the Chief in writing and the appropriate plan examination and permit fees have been paid. The Chief will authorize commencement of work by means of a written approval letter, issued by the Chief. Such approval letter shall be posted prior to construction at or near the equipment space at the construction site and shall remain posted until the final inspection determines compliance with this chapter. The approval letter shall be considered a permit specified by Wis. Stat. § 101.983(1).
(2) New Installations.
(a) Number of Plans. An elevator contractor shall submit all of the following to the Chief for plan review and approval for the proposed installation of any new conveyance:
1. At least three (3) copies of bound equipment layout plans and specifications.
2. At least three (3) copies of the permit application.
(b) Information on Equipment Plans or Specifications. Information on equipment plans or specifications shall conform to the applicable sections in ASME A17.1 and ASME A18.1a and include all of the following:
1. A plan of the car, hoistway, and machine room, control room or control space showing all clearances, including all inside car or platform dimensions specified in this chapter and in Wis. Admin. Code chs. SPS 361 to 365. (Am. by ORD-12-00035, 3-28-12)
2. A cross-section drawing through the hoistway, pit, car and machine room, control room or control space that shows all applicable dimensions. Landings shall be shown, indicating types of hoistway doors or gates.
3. A complete dimensioned layout of the machine room, control room, or control space showing working clearances around machine, controller and disconnecting means.
4. The size and weight per foot of guiderails and details of the guiderail supports, including reinforcements where required.
5. Sufficient data and information to determine if the conveyance and machine room, control room or control space comply with the requirements of this chapter.
6. For conveyances serving public buildings and places of employment, at least one copy of the equipment plans and specifications containing the original shop drawing stamp of the supervising building designer.
(c) Building Plan Approval. Building plan approval, where applicable, shall be included with the conveyance plan submittal.
(3) Alterations.
(a) Equipment Plans and Application Required.
1. A permit application form provided by the Chief and at least three (3) copies of equipment plans and specifications complying with sub. (2) shall be submitted for examination to the Chief for the proposed alteration of conveyances as specified in Tables SPS 318.1013-1 through 18.1013-7, Wis. Admin. Code § SPS 318.1013.
2. Evidence of building plan approval, where applicable, shall be included with the conveyance plan submittal.
(b) Application Required. At least three (3) copies of the completed permit application form shall be submitted to the Chief for examinations for the alterations, repairs, and replacements specified in Tables SPS 318.1013-4 to 318.1013-7.
(4) Plan Review Actions.
(a) Review of Plans. All approvals of permit application and plans for installation, repair, replacement, or alteration of equipment covered by this chapter in the City of Madison shall be performed by the Chief.
(b) Conditional Approval. If, upon examination, the Chief determines that the permit application and plans for installation, repair, replacement, or alteration substantially comply with the provisions of this chapter, a condition approval, in writing, shall be granted. All conditions that do not comply with this chapter shall be stated in the conditional approval and shall be corrected prior to completion of installation. A conditional approval issued by the Chief shall not be construed as an assumption of any responsibility or liability for the design or construction of the equipment.
(c) Revocation of Approval. The Chief may revoke any approval, issued under this chapter if the Chief determines any of the following:
1. Information provided in the application or the permit contains false statements of material fact or misinterpretations of material fact.
2. That the approval was issued in error.
3. That the work performed is not consistent with the approval or is in violation with this chapter.
(d) Denial of Approval. If the Chief determines the plans or permit application do not substantially comply with the provisions of this chapter, the permit application for approval shall be denied in writing.
(e) Processing Time. The Chief shall review and make a determination on a permit application for approval of an installation or an alteration of a conveyance within fifteen (15) business days. If a permit application has been submitted with inadequate information or fees, the application will be placed on hold and the Chief will notify the applicant of the information needed to process the application. Upon receipt of the complete information, the Chief will process the permit. The length of the processing time shall begin the day after the receipt of the completed permit or application, additional information or fees. The ending date, which shall be used to assess whether the permit was timely processed, shall be the date the Chief made a determination to approve, deny or withhold the permit.
(f) Expiration of Approval. An approval issued under this chapter expires under any of the following circumstances:
1. If the work authorized under the approval is not commenced within six (6) months after the date on which the approval is issued.
2. If the work authorized under the approval is suspended or abandoned for sixty (60) consecutive days at any time following the commencement of the work.
(g) Resubmittal. When an approval expires under sub. (f), plans shall be resubmitted in accordance with this section.
(h) Chief's Option to Waive Jurisdiction. The Chief may waive jurisdiction for plan review and approval of any project at the Chief's discretion, in which case such plan review and approval shall be conducted by the Department of Safety and Professional Services.
(Am. by ORD-12-00035, 3-28-12)