Undergrounding of utilities.
Long Beach Municipal Code § 21.31.275
in effect21.31.275 - Undergrounding of utilities.
A. All projects requiring site plan review shall provide for the ability to connect the building to any future undergrounding of utilities that may occur in the block. Such provisions shall include a vacant duct to the appropriate feed point for the underground connection.
B. The utility company's design of the electric system, including locations and aesthetic treatment, shall be in accordance with the regulations of the Public Utilities Commission of the State of California.
C. All projects requiring site plan review shall underground all overhead utility service to the site. In lieu of such undergrounding, the project developer may pay an in-lieu fee to the Department of Public Works for use in undergrounding within the applicable district. Such districts shall be established within one (1) year of the effective date of this Section and separate funds established for each district. The in-lieu fee shall be established based on the average per-foot cost of undergrounding established by the City Engineer and applied to the linear footage of the project site.
(Ord. C-6684 § 41 (part), 1990: Ord. C-6533 § 1 (part), 1988)
Source: City of Long Beach, Municipal Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ca/long_beach/codes/municipal_code?nodeId=TIT21ZO_CH21.31REDI_DIVIIDEST_21.31.275UNUTFetched: 10/28/2026
