§ 16-83 — Stormwater management plans
Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 16-83
Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/d2d93c4a-4e90-4b59-ab88-33c941d81614
Sec. 16-83. - Stormwater management plans.
(a) Plan requirements. Every applicant for a permit under Section 16-82 shall submit a stormwater management plan. The application shall contain sufficient information for the Director to evaluate the environmental characteristics of the area affected by land development activity, the potential impacts of the proposed development upon the quality and quantity of stormwater discharges, the potential impacts upon the area's water resources and drainage utilities, and the effectiveness and acceptability of proposed stormwater management measures in meeting the performance standards set forth in this article. Unless specified otherwise by this article, stormwater management plans shall contain, at a minimum, the information described below: (1) Name, address, e-mail address and telephone number for the following or their designees: landowner; developer; project engineer for practice design and certification; persons responsible for installation of stormwater management practices; and persons responsible for maintenance of stormwater management practices prior to the transfer, if any, of maintenance responsibility to another party. (2) A proper legal description of the property proposed to be developed, referenced to the U.S. Public Land Survey system or to block and lot numbers within a recorded land subdivision plat. (3) A narrative describing the existing site conditions (soils, topography, land use, protective areas, and environmentally sensitive areas). (4) A narrative describing the proposed development, including what is going to be developed and the phasing (construction schedule) of the development from initial groundbreaking to final stabilization. (5) Explanation of the provisions to preserve and use natural topography and land cover features to minimize changes in peak flow runoff rates and volumes to surface waters and wetlands. (6) Results of investigations of soils and groundwater required for the placement and design of stormwater management measures. (7) A discussion as to the analysis performed to achieve water quantity and quality standards, including a summary of results, the method of conveyance, and assumptions made. (8) A discussion as to what short-term and long-term BMPs will be utilized during the course of construction and post-construction, including a complete construction/installation schedule. (9) A statement that the selected BMPs are designed in accordance with WDNR Technical and Guidance Standards. If they are not, a discussion as to how the design differs from the Technical and Guidance Standards and the reason for the variance. (10) A description of any special construction, installation, and short-term/long-term maintenance items that need to be considered for the life of each stormwater management practice proposed. Include a list of the items and the frequency at which they are to be addressed. (11) Calculations and data to support the final results. Hydrology and pollutant loading computations as needed to show compliance with performance standards. All major assumptions used in developing input parameters shall be clearly stated. The computations shall be made for each discharge point in the development, and the geographic areas used in making the calculations shall be clearly cross-referenced to the required map. (12) Pre-development site map with property lines, disturbed limits, and drainage patterns, summary of impervious areas (parking lots, roofs, sidewalks, etc.) and pervious areas (lawns, ponds, swales, landscaping, etc.). (13) One or more site maps at a scale of not less than one inch equals 40 feet. The site maps shall show the following: site location and legal property description; predominant soil types and hydrologic soil groups; existing cover type and condition; topographic contours of the site at a scale not to exceed two feet; topography and drainage network including enough of the contiguous properties to show runoff patterns onto, through, and from the site; watercourses that may affect or be affected by runoff from the site; flow path and direction for all stormwater conveyance sections; watershed boundaries used in hydrology determinations to show compliance with performance standards; lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site; limits of the 100-year floodplain; location of wells and well head protection areas covering the project area and delineated pursuant to Wis. Admin. Code Ch. NR 811. (14) Post-development site map with property lines, disturbed limits, and drainage patterns. a. Total area of disturbed impervious surfaces within the site. b. Total area of new impervious surfaces within the site. c. Performance standards applicable to site. d. Proposed best management practices. e. Groundwater, bedrock, and soil limitations. f. One or more site maps at a scale of not less than one inch equals 40 feet showing the following: post-construction pervious areas including vegetative cover type and condition; impervious surfaces including all buildings, structures, and pavements; post-construction topographic contours of the site at a scale not to exceed two feet; post-construction drainage network including enough of the contiguous properties to show runoff patterns onto, through, and from the site; locations and dimensions of drainage easements; locations of maintenance easements specified in the maintenance agreement; flow path and direction for all stormwater conveyance sections; location and type of all stormwater management conveyance and treatment practices, including the on-site and off-site tributary drainage area; location and type of conveyance system that will carry runoff from the drainage and treatment practices to the nearest adequate outlet such as a curbed street, storm drain, or natural drainageway; watershed boundaries used in hydrology and pollutant loading calculations and any changes to lakes, streams, wetlands, channels, ditches, and other watercourses on and immediately adjacent to the site. (15) Separation distances. Stormwater management practices shall be adequately separated from wells to prevent contamination of drinking water. Explanation of any restrictions on stormwater management measures in the development area imposed by well head protection plans and ordinances. (16) Plans, specifications, detailed drawings including, but not limited to, cross-sections and profiles of all permanent stormwater conveyance and treatment practices. (17) Cost estimates for the construction, operation, and maintenance of each stormwater management practice. (b) Alternate requirements. The Administering Authority may prescribe alternative submittal requirements for applicants seeking an exemption to on-site stormwater management performance standards under Section 16-81(i) or for applicants seeking a permit for a post-construction site with less than 20,000 square feet of impervious surface disturbance. (c) Engineer certification. All site investigations, plans, designs, computations, and drawings shall be certified by a State of Wisconsin registered professional engineer to be prepared in accordance with accepted engineering practice and in accordance with criteria set forth by the Director of Public Works. (d) Exceptions. The Director of Public Works may prescribe alternative submittal requirements for applicants seeking an exemption to on-site stormwater management performance standards under Section 16-81.
(Code 1984, § 30.08; Ord. No. 17-22, § 16, 6-7-2022)
Ask a question about Green Bay law
Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.
