Correction of improper work.
Omaha Municipal Code § 34-27
in effectSec. 34-27. - Correction of improper work.
If, during the liability period mentioned in section 34-26, it is found that the backfill was not made properly or that any other work in connection with the cut or excavation was not performed or done correctly, the person making such cut or excavation shall be so notified, and such improper work shall be corrected immediately. After the corrective work shall have been performed, such person shall notify the department of public works thereof and shall be responsible for any and all damages and the maintenance of barricades, safety guards and lights as provided in section 34-1. In addition, the permittee shall be responsible for all the costs of all repairs due to backfill settlement for a period of one year from the date of acceptance by the city, except when flowable fill meeting the design criteria in section 34-23 is used to backfill the excavation.
(Code 1980, § 34-27; Ord. No. 34464, § 1, 2-3-98)
Source: City of Omaha, Municipal Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ne/omaha/codes/code_of_ordinances?nodeId=PTIIMUCO_CH34STOTPUWA_ARTIIEX_DIV1GE_S34-27COIMWOFetched: 10/28/2026
