For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.04.069 — Large commercial and institutional service—primary (Schedule L-1)

Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026) · Pasadena Municipal Code § 13.04.069

Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/e601d140-89ab-4692-b58a-742d40c6f696

13.04.069 - Large commercial and institutional service—primary (Schedule L-1).

The terms and conditions of services hereunder shall be provided by Schedule L-1, as found in the Electric Utility Rate Resolution. A. Applicability. Applies to 3-phase general service, including power and lighting, measured with demand meter. Applies to service for a customer at 300 kW demand or greater for one month out of the previous 12 months. Any customer served under this schedule whose monthly maximum demand has registered less than 300 kW for twelve consecutive months is no longer eligible for service under this Schedule L-1 and must take service under another applicable rate schedule. This schedule is subject to meter availability. Applies to services metered and delivered at voltages equal to or greater than 4 kV. The character of service furnished shall be 3-phase, 60 cycle alternating current service at normal primary or sub-transmission voltages. Motors of 50 hp or more shall be served as determined by PWP. Billing demand shall not be less than 300 kW. B. Customer shall pay the sum of the following charges (1) customer charge, (2) distribution charge, (3) grid access charge, (4) energy services charge, and (5) transmission services charge, and (6) public benefit charge. The minimum monthly charge shall be equal to the sum of the customer charge, the distribution charge, and the grid access charge. C. Power factor penalty and discount. 1. Existing loads: If a customer's load operates at a power factor of less than 75 percent, PWP may require installation of equipment to correct the power factor to 75 percent or better. A penalty of one percent of the distribution charge for each percent the average monthly power factor falls below 75 percent shall be added to the distribution charge. 2. A customer having a maximum demand of 50 kW or more shall be allowed a discount on the distribution charge of 0.333 percent for each percent the average monthly power factor exceeds 85 percent. The discount shall not exceed 5 percent. The power factor shall be computed to the nearest one percent. The discount shall be computed to the nearest one-tenth of one percent. 3. New loads: On or after July 1, 2002, if a customer's load operates at a power factor of less than 85 percent, PWP may require installation of equipment to correct the power factor to 85 percent or better. A penalty of one percent of the distribution charge for each percent the average monthly power factor falls below 85 percent shall be added to the distribution charge. 4. A customer having a maximum demand of 50 kW or more shall be allowed a discount on the distribution charge of 0.333 percent for each percent the average monthly power factor exceeds 85 percent. The discount shall not exceed 5 percent. The power factor shall be computed to the nearest one percent. The discount shall be computed to the nearest one-tenth of one percent.

(Ord. No. 7466, § 12, 3-30-2026)

Ask a question about Pasadena law

Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.