For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

UNDERGROUND INSTALLATIONS

Denton City Code subpt. A, ch. 26, art. III, div. 2
in effect

Denton City Code § 26-91 Scope.

Denton City Code § 26-92 Inspector—Office created; assistants.

Denton City Code § 26-93 Same—Qualifications.

Denton City Code § 26-94 Same—Member of utilities department.

Denton City Code § 26-95 Same—Duties generally.

Denton City Code § 26-96 Same—Authority.

Denton City Code § 26-97 Same—Liability.

Denton City Code § 26-98 Same—Conflict of interest.

Denton City Code § 26-99 Installation standards generally.

Denton City Code § 26-100 Procedure required in order to install underground distribution systems.

Denton City Code § 26-101 Inspection tags to be attached to service entrance switch.

Denton City Code § 26-102 Interference with wiring during construction.

Denton City Code § 26-103 Loose wiring not to be left on buildings or streets.

Denton City Code § 26-104 High voltage installations.

Denton City Code § 26-105 Transformer installation.

Source: City of Denton, Texas, Code of Ordinances, Charter and Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/tx/denton/codes/code_of_ordinances?nodeId=SPACOOR_CH26UT_ARTIIIELSE_DIV2UNINFetched: 11/8/2026