Design requirements.
Reno Administrative Code § 12.26.030
in effectSec. 12.26.030. - Design requirements.
(a) General.
(1) All designs, structural calculations, and electrical connections and any other engineering analysis will be certified by a Nevada licensed professional engineer.
(2) Designs must meet the requirements of the American Association of State Highway and Transportation Officials (AASHTO) and city standards.
(3) All infrastructure located within a sidewalk area or a potential future sidewalk area must provide a 48-inch minimum clear walking space which meets PROWAG.
(b) Equipment.
(1) To the extent feasible, antenna and related equipment will be concealed and provide the least visually intrusive installation as reasonably possible to minimize visual clutter and obtrusiveness; painted and textured to match or blend with the structure to which it is attached so that the installation appears to be an architectural component of the structure on which it is mounted.
(2) Each antenna shall not be more than three cubic feet in volume.
(3) Other pole mounted equipment, other than antennas, shall be proportional to the structure on which it is mounted and include tapered elements where feasible.
(4) Pole mounted equipment shall be installed as close as possible to the pole and not more than 14 inches from the surface of the pole.
(5) Wiring, cables and related connectors must not be exposed and, to the extent feasible, will be concealed within the pole, a canister or within a sleeve between the antenna and the pole.
(6) Conduit, cables and wires routed through conduit along the outside of the pole is to be painted with flat non-reflective colors to match the pole.
(c) Poles.
(1) Will be of a design of like kind with poles in the surrounding area and conform to the pole it is replacing.
(2) Height (including equipment) will not exceed more than ten percent of the average height of adjacent poles of like kind or will not exceed more than five feet in height as a result of collocation of a small cell, whichever is greater.
(3) New wooden utility poles are not allowed. Replacement wooden poles will be considered on case by case basis with approval from pole owner and will require the complete removal of an existing utility pole. All electrical, telecommunication or other transmission lines will need to be transferred to the replacement pole.
(4) Licensee and/or applicant is responsible for all costs.
(5) Placement of equipment on a pole not owned by city or licensee and/or applicant is required to have a letter of authorization or an agreement with the owner of the pole.
(d) Street Lights.
(1) Existing street lights that need to be replaced for installation of equipment will be replaced at licensee's and/or applicant's expense with approved city poles pursuant to city street light specifications and will be owned by the city.
(2) New street lights, including decorative street lights, to be installed will be installed at licensee's and/or applicant's expense consistent in architectural design and height with existing street lights in the area to be placed, pursuant to city street light specifications, and with a photometric light study showing that the lighting is consistent with the neighborhood.
(3) Replacement lighting, temporary or permanent, shall be operational within 24 hours of existing light removal.
(4) If a new electrical meter is required, the meter will be sized to support the street lights and equipment.
(e) Traffic Signals.
(1) City is responsible for the maintenance of all traffic signals within the city limits regardless of ownership.
(2) City must approve all traffic signal attachments of Equipment.
(3) If not city owned, licensee and/or applicant is required to have a letter of authorization or an agreement with the owner of the traffic signal for installation of equipment.
(f) Landscaping.
(1) May be used to conceal ground mounted equipment.
(2) Shall conform to RMC 18 and obtain approval from the city's urban forester and planning division.
(3) If removed from the ROW shall be replaced per RMC 18.
(4) All work within ten feet of a city owned tree will require coordination and permitting from the city's urban forester.
(5) Work within ROW, that is located within a landscape area maintained by a private party, will require notification to the party responsible for the maintenance prior to the start of any work.
(g) Power, Electric Meters and Cabinets.
(1) A power shutoff switch will be provided at each site. Power shutoff cannot be placed inside city meter boxes or pedestals.
(2) Above ground cabinets will be considered for placement of equipment only if no other option is available for operation of the small cell. The equipment must be placed in the smallest enclosure possible and as close to the pole as possible with consideration of required safety clearance.
(3) Plans must show the location of the proposed or existing meter used for providing power to small cell.
(4) New electric meters must not obstruct pedestrian or vehicle sight distance.
(5) Installation of new or replacement electric meters shall be installed outside of the sidewalk or other walking path, to the extent feasible.
(6) If not covered by a license agreement or site supplement agreement, a ROP is required.
(h) Placards.
(1) Electromagnetic energy placards or labels will be placed facing street-side, unless the pole type required a different placement, and will be the responsibility of the licensee and/or applicant.
(2) Will indentify the licensee and/or applicant, provide a site or identification number, a local or toll-free contact number.
(Ord. No. 6508, § 1, 4-10-19)
Source: City of Reno, Nevada, Administrative Code, City Charter and Annexation and Land Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/nv/reno/codes/administrative_code?nodeId=PT2READCO_TIT12PUWOUT_CH12.26COSMCEDE_S12.26.030DEREFetched: 11/1/2026