Basin stormwater management design criteria.
Gulfport Code of Ordinances, App. C, § 7
in effectSection 7. - Basin stormwater management design criteria.
7.1 Minimum control requirements. Projects shall be designed for a fifty (50) year frequency storm event. Peak discharge rates for one hundred (100) year and five hundred (500) year frequency storm events shall be calculated and the effect of these storms on the stormwater system shown. This shall be submitted as part of the permit application.
7.2 [Additional requirements possible.] In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the City of Gulfport reserves the right to impose any or all additional requirements deemed necessary to control stormwater flowing from the site or development.
7.3 Site design feasibility.
7.3.1 Applicants shall consider the following conditions of the site when they determine the types of practices they will use to control stormwater on the site: topography, the drainage area, depth of the water table, soils, slopes, terrain, and the location of environmentally sensitive areas located on site.
7.3.2 The stormwater management plan shall be designed to remove pollutants and reduce flow velocities, shall utilize an acceptable water quality pre-treatment BMP and shall capture and treat stormwater in areas designated as wetlands, in accordance to specifications defined in the Stormwater Design Manual.
7.3.3 For any structural practice proposed, a landscape plan which affords stabilization of the areas adjacent to the practice will be required.
(Ord. No. 2419, § 1, 1-19-05; Ord. No. 3099, § 2, 12-7-21)