For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

PB13-6 — Permit Approval

Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Park and Recreation Board Code of Ordinances § PB13-6

Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/f402e610-c6ca-4ce2-a04e-3c445381a096

PB13-6. - Permit Approval.

PB13-6-1. Process. Utility encroachment applications and alignment plans meeting the requirements of Sections 13-6 and 13-7 of this chapter shall be submitted by the Parks Engineer to the Board for review in accordance with the standards of this chapter. The Board shall have the authority to: (a) Approve, (b) Approve with conditions, (c) Ask for additional information, or (d) Deny the utility alignment plan and utility encroachment permit. PB13-6-2. Duration. Approval of a utility alignment plan submitted under the provisions of this chapter shall expire one (1) year after the date of approval unless construction has commenced in accordance with the plan. PB13-6-3. Conditions. A utility alignment plan may be approved subject to compliance with conditions reasonable and necessary to insure that the requirements contained in this chapter are met. Such conditions may, among other matters, limit the size, kind or character of the proposed encroachment, require the construction of structures, landscaping, drainage facilities, and other facilities, require replacement of vegetation, establish required monitoring procedures, stage the work over time, require alteration of the site design to insure buffering. PB13-6-4. Insurance. Prior to approval of any utility alignment plan, the applicant shall submit proof of liability insurance. Insurance amount limits shall be in accordance with current MPRB standards. The Minneapolis Park and Recreation Board must be explicitly named as additionally insured on the certificate. PB13-6-5. Performance bond. Prior to approval of any utility alignment plan, the applicant shall submit an agreement to comply with such conditions as may have been agreed to. Such agreement shall be accompanied by a bond to cover the amount of the established cost of complying with the agreement. The agreement and bond shall guarantee completion and compliance with conditions within a specific time. The adequacy, conditions and acceptability of any agreement and bond shall be determined by the Board or any official of the Board as may be designated by the Board. PB13-6-6. As-built drawing. The applicant shall provide the Parks Engineer with an as-built drawing showing the constructed locations and elevations of all installed equipment along with the information required in Section 13-5-2. The performance bond shall be held until the Parks Engineer has approved the as-built drawing. PB13-6-7. Approval standards. No utility encroachment permit which fails to meet the standards contained in this Section shall be approved by the Board. PB13-6-7-1. Minneapolis Park and Recreation Board Land Policy. MPRB Policy XV Section A, Encroachments on Park Lands shall be adhered to: A. Encroachments on Park Lands. The Board strongly opposes diversion of park property by any individual, institution or organization, public or private, for any purpose other than that for which the lands were acquired. Where proposed diversions of park property appear to be in the best interest of the Park System or where all other alternatives have been exhausted, and only under these conditions, requests will be taken under consideration by the Board on an individual basis. In those instances where the Board determines that encroachment on park property may be necessary, easements or permits will be granted which include the following requirements: A.1 To the greatest extent possible, intrusion will be limited to the periphery of park property, must be unobtrusive in nature, and must minimize the amount of damage to the landscape. A.2 Restoration of any physical or natural property removed or damaged, or equivalent monetary compensation provided. A.3 Compensation shall reflect the impact of the intrusion on aesthetic and recreational values of parkland. PB13-6-7-2. Permit agreement required. To assure compliance with the above policy, a permit agreement signed by the applicant which includes compensation per Section 13-7 for the impact of the encroachment on Park aesthetics, recreational values and staff resources is required. The agreement shall be compiled by the Board's attorney and approved by the Board. PB13-6-7-3. Site erosion control. Erosion control measures specified in the utility alignment plan must meet all City of Minneapolis, State of Minnesota or Watershed District requirements. PB13-6-7-4. Wetlands. Plans must meet all Minnesota Wetland Conservation Act requirements for wetland impacts. PB13-6-7-5. Inspection and maintenance. All utility facilities on Park property shall be designed to minimize the need of maintenance, to provide access for maintenance purposes and to be structurally sound. All utility facilities shall have a plan of operation and maintenance that assures minimum maintenance. PB13-6-7-6. Other permits or approvals. The applicant shall obtain all permits and approvals required by the City, the State, or other agency and provide copies of permits or written permissions to the Board. (Pk. Bd. Ord. No. 2002-101, § 1, 6-12-02)

Ask a question about Minneapolis law

Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.