ADMINISTRATIVE ENFORCEMENT REMEDIES; FORMAL
Colorado Springs City Code § 12.5.1203
in effect12.5.1203: ADMINISTRATIVE ENFORCEMENT REMEDIES; FORMAL:
A. Formal Remedies: The Chief Executive Officer may use the following formal remedies for one or collective violations as appropriate for the circumstances. The remedies shall be contained in a unilateral administrative order or consent administrative order, as appropriate. A unilateral administrative order may be used without an initial hearing. A consent administrative order is an agreement between the alleged violator and the Chief Executive Officer and may be issued without a hearing or following a hearing. A consent administrative order shall have the same force and effect as any other administrative order issued pursuant to this article. Any order shall be in writing, shall state the provision violated, the facts alleged or supporting the violation and any of the following elements singularly or together:
1. Cease And Desist Order: When the Chief Executive Officer finds that the user has violated or continues to violate this article or any permit, control mechanism, BMP or order issued thereunder, the Chief Executive Officer may require the user to cease and desist all violations and direct those persons in noncompliance to take the appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and terminating the discharge. The time by which the acts or practices complained of must be terminated must be specified.
2. Compliance Schedule: An administrative order may contain a "compliance schedule" as defined in section 12.5.201 of this article. Compliance schedule progress reports are due fourteen (14) days following each milestone date.
3. Administrative Fines: Not as a criminal penalty and only as an administrative measure (civil penalty), administrative fines encourage compliance and offset unquantifiable damage to the POTW and the environment from noncompliance. Any user who is found to have violated any provision of this article, permits, control mechanisms, BMPs or orders issued hereunder, may be assessed an amount not to exceed one thousand dollars ($1,000.00) per violation per day. Each day on which noncompliance shall occur or continue may be deemed a separate and distinct violation. Instances when a violation continues (for which fines may be assessed for each day) include, but are not limited to, each day of failure to provide required submittals after the due date; following a sampling event showing noncompliance until a sampling event demonstrating compliance; and failure to rectify the damage to the wastewater treatment system or to the environment resulting from an initial violation. Fine assessments shall be based upon nature, circumstances, extent and gravity of the violation(s), and with respect to the violator, ability to pay, any prior history of such violations, the degree of culpability, economic benefit or savings (if any), and such other matters as justice may require.
4. Extra Costs Charges:
a. The Chief Executive Officer may assess a charge to recover costs incurred by the POTW for extra monitoring, investigation or quantifiable damages attributable to any user who is found to have:
(1) Discharged a waste which causes an obstruction, damage, interference, pass-through or other impairment to the POTW or damage to other users as a result of the discharge;
(2) Committed a violation of this article; or
(3) Failed to comply with provisions of the user's discharge permit, control mechanism, BMP or order.
b. The amount of this charge shall be determined by the Chief Executive Officer and may include:
(1) Sampling and analysis costs;
(2) Time, material and equipment costs incurred as a result of inspection procedures;
(3) Costs incurred in the administrative analysis of all pertinent information, or extraordinary costs incurred by the POTW as a result of discharge or other noncompliance such as time (including legal services), material and equipment costs including chemical usage, detecting and preventing or correcting interference or pass-through of the POTW or repairing damage to the POTW; and
(4) Other associated costs as the Chief Executive Officer may deem necessary.
5. Suspension Or Revocation Of Permit Or Control Mechanism:
a. Any violation of the conditions of an SIU wastewater discharge permit, liquid waste hauler permit, control mechanism, BMP, order or of this article or of applicable State and Federal regulations shall be reason for suspension or revocation of the permit, individual control mechanism, notice of coverage under a general control mechanism or BMP. Upon suspension or revocation, any wastewater discharge from the affected user shall be prohibited. Grounds for suspension and revocation include, but are not limited to, the following:
(1) A user has falsified information or records submitted or retained in accord with this article or in connection with any permit, control mechanism, or BMP issued pursuant to this article;
(2) A user has failed to report significant changes in operations or wastewater constituents or characteristics;
(3) A user has violated the conditions of a permit, control mechanism or BMP;
(4) A user has refused right of entry;
(5) A user has tampered with monitoring equipment;
(6) A user has failed to reapply for a permit, individual control mechanism, or request a required permit modification;
(7) A user has discharged into the POTW in violation of this article;
(8) A temporary or permanent reduction or elimination of the permitted discharge is required due to changed circumstance(s), as may be discovered in a toxicity reduction evaluation or other investigation to assure compliance with the requirements of this article;
(9) A temporary or permanent reduction or elimination of the permitted discharge is required due to changes in design or capability of the POTW to treat the discharged wastes or hauled liquid wastes; or
(10) A temporary or permanent reduction or elimination of the discharge due to promulgation of a more stringent pretreatment standard by State or Federal agencies having jurisdiction over receiving waters.
b. In regards to liquid waste haulers, additional grounds for suspension or revocation of a liquid waste hauler permit, include, but are not limited to:
(1) The liquid waste hauler has failed to pay disposal charges in accord with permit or tariff and Code requirements;
(2) The liquid waste hauler has improperly used and/or maintained the designated disposal facilities in violation of requirements established by the Chief Executive Officer;
(3) The liquid waste hauler or representative failed to display the authorization document upon request by a representative or employee of Utilities;
(4) The liquid waste hauler or representative changed, altered or otherwise modified the face of a permit or authorization document without the permission of the Chief Executive Officer;
(5) The liquid waste hauler or representative failed to immediately halt the discharge from the truck into the designated disposal facilities upon order of any Utilities employee;
(6) The liquid waste hauler or representative tampered with POTW monitoring or sampling equipment or access gates at the designated disposal facilities; or
(7) The liquid waste hauler or representative failed to comply with manifest requirements contained in section 12.5.1002 of this article.
c. Any permit, individual control mechanism, notice of coverage under a general control mechanism or BMP, which has been suspended or revoked pursuant to this part, may be reinstated upon a finding by the Chief Executive Officer that the condition, which resulted in the suspension or revocation, no longer exists.
d. Suspensions may be effected by the Chief Executive Officer for any length of time up to one year.
B. Emergency Suspension Order:
1. The Chief Executive Officer may suspend the wastewater treatment service of any user, or a permit, individual control mechanism, notice of coverage under a general control mechanism or BMP, or disconnect the sewer connection when the suspension or disconnect is necessary in the opinion of the Chief Executive Officer in order to stop an actual or threatened discharge which:
a. Presents or may present an imminent or substantial endangerment to the health, safety or welfare of persons or property;
b. Presents or may present an imminent or substantial endangerment to the environment;
c. May cause or actually causes interference to the POTW or pass through of contaminants causing violation of the POTW's permit; or
d. Causes the POTW to violate any condition of its CDPS or NPDES permit, certificate of designation or other Federal or State laws.
2. In the event of a suspension or disconnect under this part, within fifteen (15) days the user shall submit a written report describing the event that caused the suspension, its compliance status and the measures necessary to prevent a recurrence. In no event shall the appeal of an emergency suspension order in any way stay or suspend the same.
3. The Chief Executive Officer may reinstate the wastewater discharge permit, individual control mechanism, notice of coverage under a general control mechanism or sewer connection upon proof of compliance.
C. Imminent Hazard Order: The Chief Executive Officer may issue an imminent hazard order as provided in subsection 12.1.115C of this chapter. (Ord. 99-163; Ord. 00-204; Ord. 01-42; Ord. 06-195; Ord. 10-82; Ord. 18-42)
Source: City of Colorado Springs, Colorado, City Code and City Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/coloradospringsco/latest/coloradosprings_co/0-0-0-21049Fetched: 11/1/2026
