Oxford Code of Ordinances, App. A, art. 9.0, § 9.1 Subdivision of land.
Sec. 9.1. - Subdivision of land.
9.1.1. Adherence to the subdivision standards and process outlined in this ordinance is required for any division of land as defined in article 10.
9.1.2. Exempt. For the purpose of these regulations, the following are exempted and do not require an application for subdivision approval to the planning commission, but may be subject to more restrictive state regulations:
9.1.2.1. The sale, exchange, or combining of parcels of land between one or more owners of adjoining properties, provided additional lots are not created, and that the resulting parcels are not less than the minimum sizes required by these and the zoning regulations. This provision does not apply to land exchanges in existing subdivision or an action that would by default create a subdivision.
9.1.2.2. Any division, partition, or sale of land by judicial decree.
9.1.2.3. Division of land into two parcels provided that each parcel is greater than one acre exclusive of existing road right-of-way or major road right-of-way to be reserved, and is zoned agricultural, estate residential, or suburban residential.
9.1.2.4. The division of land solely for the purpose of deeding land to the city for the purpose of providing right-of-way for a public road.
9.1.3. Process. The subdivision of land in the City of Oxford shall occur in three steps: Preapplication conference, preliminary subdivision application, final subdivision application.
9.1.4. Official plat required. Before any tract or parcel of land within the city shall be considered for division into two or more building sites for residential, or any lot for non-residential, purpose of sale, said tract or parcel of land shall be surveyed and platted by a licensed land surveyor. All plans and specifications for construction of required improvements thereon shall be prepared by a registered professional engineer.
9.1.5. Procedures. The procedures for each step are set forth in the following sections. The planning commission is authorized and directed to administer and coordinate the provisions of this article. Approval of plats and other documents and plans by the planning commission are, however, tentative approval only. Final approval of plats is the responsibility of the mayor and board of aldermen. All subdivisions that create two or more lots are to be reviewed by the site plan committee and may be referred to the planning commission (at the discretion of the director of planning) if the subdivision involves lots already containing structures. Subdivisions with three or more lots are to be reviewed by the planning commission.
9.1.6. Pre-application conference.
9.1.6.1. Sketch plat. Prior to the filing of a subdivision application of five or more lots, an applicant shall meet with the planning department to discuss the subdivision review process. Applicants are advised to submit a sketch plat for informal advice as to the appropriateness of the proposed subdivision. This step does not require a formal application, fee, or filing of plat. A pre-application sketch plat should contain the information and be presented in the form listed in appendix sketch plat standards.
9.1.6.2. The director of planning may waive the pre-application conference if it is determined unnecessary because the applicant has sufficient knowledge of the requirements of the land development code and/or has previously submitted completed applications in the City of Oxford.
9.1.6.3. Purpose. The purpose of the conference is to:
a. Acquaint the applicant with the requirements and procedures of this ordinance.
b. To determine the appropriate application process as provided for in the land development code.
c. To discuss the proposed subdivision layout and design.
9.1.7. Preliminary subdivision application.
9.1.7.1. Submittal requirements.
a. An application for preliminary subdivision shall include verification as to whether the property is already part of an existing subdivision; and shall contain the information and be presented in the form listed in the appendix [section] A.3, Preliminary plat standards.
b. Reserve tracts. Where a proposed subdivision is part of a larger tract, and the area of the un-subdivided portion is less than 50 acres, a sketch plan shall be submitted for the entire property showing the extension of future streets, storm drainage, and sewers to ensure that subsequent development of the reserve tract has adequately been addressed.
9.1.7.2. Public works requirements.
a. Plans. A complete set of plans and specifications shall be submitted to the planning department for study and recommendation by the planning department and city engineer. Written approval of the city engineer must be noted on all copies of plans and specifications so submitted before the preliminary plat will be considered by the planning commission.
b. Utility plan. A utilities plan shall be submitted showing existing and proposed utilities on and adjacent to the tract. Location, size and invert elevation of sanitary and storm sewers; location and size of water mains, and fire hydrants. If water mains and sewers are not on or adjacent to the tract, indicate the direction and distance to, and size of nearest ones, showing invert elevation of sewers. Also, electric, gas, and cable utilities and any required retention/detention shall be shown. This plan shall include, in residential developments with underground utilities, a designated location (preferably in a rear yard area or on common space) for a telecommunications facility support structure. The location shall be identified and approved as a part of the approval of a final plat for the subdivision. When proposed for installation, the maximum overall height of new telecommunications facility support structure in a residential development, including antennas, lightning rods, or other extensions shall be determined through a special exception approval.
c. Grading and drainage plan. An overall grading plan shall be prepared showing existing and proposed contours at two-foot intervals. Both existing and proposed contours shall be shown on the same drawing. An erosion control plan for the subdivision shall be prepared and submitted as part of the overall grading and drainage plan.
d. Title and certificates. Present tract designation according to official records in the office of the appropriate recorder, the title under which proposed subdivision is to be recorded, with names and addresses of owners, notation stating acreage, scale, north arrow, datum, benchmarks, certification of registered civil engineer or surveyor, date of survey.
e. Traffic impact analysis. At the discretion of the public works department or when any proposed subdivision is expected to generate over 100 peak trips 500 trips in an average day. (See traffic generation threshold table in the appendix.)
9.1.7.3. Planning commission review. During its review of any plat, preliminary or final, the planning commission shall consider the proposed subdivision in the context of its intended use and the relation of that use to the public welfare and neighborhood development of the area in which it is located.
a. All plats shall be reviewed in the context of existing plans, including the City of Oxford Comprehensive Plan, zoning ordinance, major street plans, major utility plans, other public facility plans; and the character of the local community.
b. Attention shall be given to the need for parks, play areas, schools, public building sites, major streets, the efficiency of the street pattern, and the suitability of the land development.
c. Due regard will be shown for the preservation of outstanding natural and cultural features such as scenic spots, watercourses, and historic sites.
d. The planning commission shall consult other agencies and confer with the developer from time to time during the course of its examination, in order to ensure carrying out the purposes of the subdivision regulations and the orderly growth and development of the city.
9.1.7.4. Review Timeframe.
a. Application for preliminary subdivision shall be filed with the department of planning for review and hearing before the City of Oxford Planning Commission at least 45 calendar days prior to the meeting at which it is to be considered.
b. The planning commission shall, within 45 calendar days, act thereon as submitted by approving the application, approving with conditions, or denying the application. The planning commission shall state the reasons for its actions.
9.1.7.5. Approval conditions.
a. Conditional approval of a preliminary plat does not constitute approval of the final plat (subdivision plat). It is instead an expression of approval for the layout submitted on the preliminary plat that is to serve as a guide to the preparation of the final plat.
b. Preliminary plans are approved for a two-year period of time. Recording of final plats within the approval period shall constitute compliance with this provision. If a final plat(s) has not been recorded within the approval period, the preliminary plan approval shall be null and void.
c. Phased plans. If the preliminary plan contains a sequence of phases, preliminary plans should only be submitted for phases that are to be initiated within two years, and all phases that have received preliminary plat approval shall have a final plat recorded within the approval period.
d. The applicant may request an extension of time for the approval period. Requests for extensions shall be submitted in writing to the planning commission prior to the expiration date. The subdivider shall indicate the reasons for the extension and the estimated time for finalizing the development. When granted, extensions shall be for no more than two year periods.
9.1.8. Final subdivision approval.
9.1.8.1. An application for final subdivision approval shall conform substantially to the preliminary plat as approved, and, if desired by the applicant, it may constitute only that portion of the approved preliminary plat which he proposes to record and develop at the time; provided, however, that such portion conforms to all requirements of these regulations.
9.1.8.2. Application for approval of the final plat shall be submitted in writing to the planning commission at least 45 calendar days prior to the meeting at which it is to be considered. The planning director may authorize a submittal 30 days prior to the meeting. An application for final approval shall contain the information and be presented in the form given in the appendix [section] A.4, Final plat standards.
9.1.8.3. An application for final subdivision approval shall be submitted to the planning commission within 18 months after approval of the preliminary plat; otherwise, such approval shall become null and void unless an extension of time is applied for and granted by the planning commission.
9.1.8.4. The city engineer shall certify that the subdivider has complied with one of the following alternatives:
a. All improvements have been installed by the subdivider or another party in accordance with the requirements of these regulations and with the action of the board of aldermen, giving approval of the preliminary plat, receiving a warranty bond, and accepting maintenance of utilities and streets; or
b. A bond or certified check equivalent to 150 percent of the approved construction cost estimate has been posted by the subdivider, which is available to the city in a sufficient amount to ensure completion of all required improvements.
9.1.8.5. After the final plat has been approved by the planning commission, it shall be submitted to the board of aldermen and, if approved, shall include the certificates signed by the mayor and the city engineer.
9.1.8.6. A duplicate original of the final plat on mylar shall be submitted to the city clerk and recorded in the city plat book of subdivisions as specified below.
9.1.8.7. A digital copy shall be submitted in a both Autocad and PDF formats.
9.1.9. Recordation of final subdivision plat.
9.1.9.1. Upon approval of the final plat by the mayor and board of aldermen, the submission of any required bond, and the recording of the final plat in the office of the Chancery Clerk of Lafayette County, building, and related permits may be issued, and lots may be conveyed by the owner. Prior to such approval and submission of the required bond, no building or related permits shall be issued and no lots shall be conveyed by the owner.
9.1.9.2. Within ten days following approval of a final plat by the mayor and board of aldermen, such plat must be recorded in the office of the clerk of the chancery court and a copy of the recorded plat submitted to the director of planning. Failure to record such plat within the time specified will result in revocation of all building and related permits then outstanding, and no building or related permits will be issued for any building to be erected within the subdivision until such time as the final plat is recorded.
9.1.9.3. No bond shall be released by the city until such time as all improvements have been accepted for maintenance and the final plat recorded in the office of the clerk of the chancery court.
9.1.9.4. The provisions of this section are applicable to all subdivisions previously approved and accepted by the mayor and board of aldermen. Final subdivision plats for such subdivisions shall be recorded as provided by this section within ten days following the effective date of this ordinance.
9.1.9.5. Digital records. The subdivision developer must provide to the city, at the time of acceptance of the subdivision improvements, a digital representation of the final subdivision plat and all improvements to be accepted by the city. Digital record drawings shall consist of one file for each sheet of "as built" plans and one file for each sheet of the final plat. All digital files shall be in a format as required by the city engineer.
9.1.10. Modification of final subdivision plat. In addition to satisfying all other applicable requirements of this Code, any amendment, alteration, or vacation of a previously-approved final subdivision plat, or any part thereof, must comply with this section and applicable state law. Any party seeking such an amendment shall submit a petition including: (1) a description of the nature of and reason for the amendment; (2) an accurate description of the property, including a copy of the plat to be amended and a copy of the proposed amended plat; and (3) the written consent of all persons adversely affected by or directly interested in the proposed change. The applicant shall be responsible for contacting and obtaining consent from all such persons. Before approving any such change, the mayor and board of aldermen shall make a finding that all such persons have given written consent to the proposed change. If the mayor and board of aldermen find that all such persons have not given written consent, the amendment shall not be allowed. See MCA 1972, § 17-1-23.
9.1.11. Subdivision design standards.
9.1.11.1. General design objectives. The subdivision of land within the City of Oxford shall provide for the efficient and orderly development of the site within the context of the general area in which it is located and adhere to the following principles:
a. Provide a safe and convenient circulation system minimizing pedestrian and vehicle conflicts, and traffic congestion.
b. Provide lots and parcels which are suitable for the type of development anticipated and are in conformance with the zoning regulations.
c. Encourage the protection of the natural environment such as topography, mature vegetation, highly erodible soils, and the area prone to periodic inundation due to flooding and wetlands.
d. In addition to the requirements established in this ordinance, all subdivision plats must comply with the following plans, rules, and regulations:
i. All applicable local and state statutory provisions.
ii. The zoning regulations and building and safety codes, where applicable.
iii. The requirements of the county and state health departments.
iv. The rules of the Mississippi Department of Transportation if the subdivision abuts a state highway.
9.1.11.2. Subdivision and street names. The proposed names of subdivisions and streets must not duplicate, nor too closely approximate phonetically, the name of any street or subdivision covered by these regulations. The planning commission shall have final authority to designate street and subdivision names where conflicts exist with other established streets and subdivisions within the county. Proposed streets, which are in alignment with others already existing and named, shall bear the names of the existing streets. Street names must also be approved by the City of Oxford emergency management director.
9.1.11.3. Phasing of development.
a. Purpose of phasing. The phasing of development permits incremental development. Additionally, when a subdivider intends to develop a portion of a larger tract of land and leaves the balance for future development as a reserve tract, a phasing system may be permitted.
b. Review criteria. The review of a phasing plan shall incorporate the following considerations:
i. Circulation. A phase plan shall provide for proper circulation and access indicating potential new streets and potential for connections to adjoining properties.
ii. Facilities/utilities. A phase plan shall provide for the logical and orderly improvement of public infrastructure and facilities and extension of utilities within the development.
9.1.11.4. Lots and blocks—General lot design.
a. Zoning requirements. All lots shall meet the minimum requirements of the zoning ordinance and be of sufficient size and shape to accommodate a structure that conforms to appropriate city building and construction codes, housing, and public health codes.
b. Lot shape. Wherever possible, lots shall be regular in shape and not have a projection extending from the main body of the lot, if such projection is not functionally needed for the staff of a flag lot or to meet the required side or rear yard of a structure on the lot.
c. Side lot lines. Side lot lines shall be at approximately right angles or radial to the street line unless a variation would yield a better street and lot layout.
d. Corner lot yards. All buildings to be constructed, and all existing buildings to be enlarged, when located on a corner lot, shall maintain the required front yard setback from all streets upon which such lot has frontage.
9.1.11.5. Flag lots. The staff or strip of land providing access from the building site to the street shall be wide enough to accommodate a curb cut or driveway width meeting the design standards of the city engineer. Flag lots where the access staff exceeds 150 feet in length may be approved after determining that service by fire and emergency vehicles can be accommodated. Up to two lots may have adjoining flag lots and share a driveway easement.
9.1.11.6. Lots abutting highways or arterial roads. Double frontage and reverse frontage lots should be avoided except where essential to provide separation of residential development from traffic arteries or to overcome specific disadvantages of topography and orientation.
9.1.11.7. Lots with easements.
a. Limit. No more than four lots shall be served by a private access easement which shall be no longer than 150 feet without a turnaround, and no longer than 300 feet with a turnaround.
b. Encroachment. No structure shall encroach upon an easement.
c. Residential developments. There shall be sufficient lot depth and width to provide a reasonable buildable area for the primary structure, and sufficient depth for accessory uses in addition to an access easement or easements.
d. Non-residential developments. Sufficient buildable area, parking, and landscaping areas shall be provided in addition to an easement or easements.
9.1.11.8. Lots not served by public sewer and water. Any such lot developed or occupied after July 1, 1992, shall require Mississippi State Department of Health approval of any individual on-site wastewater disposal system planned on any residential lot. Whenever the applicant submits a preliminary plan containing more than 34 lots, a feasibility study on wastewater disposal shall be sent to the Mississippi Department of Environmental Quality and a copy of their response shall be submitted with the preliminary plan application to the planning commission. All lots must be of sufficient size to allow the installation of an individual wastewater disposal system.
9.1.11.9. Building setbacks.
a. Building setback lines shall be shown on all lots intended for residential use and on commercial and industrial lots adjacent to residential areas. Such setback lines shall not be less than the requirements of the official zoning ordinance.
b. Restrictions requiring buildings to be set back to such building setback lines shall either be shown on the plat or shall be contained in a separate recorded document or site plan and referred to on the plat.
9.1.11.10. Lot numbering. All lots established for building and common area shall be designated by numbers listed consecutively within a block. Lot numbering may be cumulative throughout the subdivision if the numbering system continues from block to block in a uniform manner.
9.1.11.11. Blocks.
a. The lengths, widths, and shapes of blocks shall be determined with due regard to:
i. Provision of adequate building sites suitable to the special needs of the type of use contemplated.
ii. Zoning requirements as to lot sizes and dimensions.
iii. Needs for convenient access, circulation, control, and safety of street traffic.
b. Block lengths shall not exceed 1,200 feet or be less than 400 feet.
c. Block widths shall not be less than 200 feet.
d. Pedestrian crosswalks, not less than 10 feet wide shall be required where deemed essential to provide safety, as required by the planning commission. Crosswalks shall be designed to connect external pedestrian circulation to a site and safely convey pedestrians to the site destination. Crosswalks shall be striped in conformance with section 4.8.6.6.
e. Required open spaces, playgrounds, parks, schools or other public facilities shall be provided according to requirements of the zoning district in which the subdivision is located.
(Ord. No. 2018-11, 7-17-2018)
