14.15.560 - Estimating service extension costs.
A. The city estimate used in determining service extension cost will be calculated on an average per foot cost based on the most recent actual construction costs plus the cost of transformers. B. Costs will vary based on the physical characteristics of the extension as detailed in section 14.15.515. For non-standard construction, the estimates will reflect extraordinary costs for materials, transportation and/or labor.
(Ord. 504, 1982; Ord. 610, 1988)