14.15.565 - General service extension provisions.

A. The city reserves the right to refuse service to any load or location determined to be detrimental to the city's existing system. B. Applications for service and service extension agreements must be signed by the legal property owner or the lessee of state, federal or municipal property. Lessee/renters on private property may sign only with the consent of owner in writing. C. Service extension agreements may be assumed by another customer providing that the customer is the new legal owner or lessee of the property to which the service extension was made, and further providing that it is agreed to in writing by the city, the assignor and the assignee of the agreement. D. The city reserves the final right to determine the technical or economic feasibility of any service extension. Construction requirements for single-phase or three-phase service extensions will be determined solely by the city. The city may refuse any type of construction it deems technically unfeasible or the city may charge in advance as a contribution-in-aid-of-construction for any type of construction it deems non-standard or economically unfeasible. E. The city shall be the sole judge of whether extensions, construction conditions, and material requirements are standard or non-standard. In non-standard construction the city will adjust service extension costs based on use of non-standard construction labor, materials or transportation. F. If constructing service extensions require the services of a registered land surveyor, the applicant will be liable for costs incurred for any extra property or boundary surveys necessary to determine correct placement of the city's facilities on the applicant's property or intervening property. G. For any service extension the customer must provide satisfactory right-of-way to the city for placement of its facilities as needed to provide service to the customer's desired service location. These rights-of-way shall be provided to the city at no cost. Right-of-way agreements must be signed by the legal property owner. H. The length of the electric line required for an extension of service will be the distance from the nearest suitable existing distribution facility to the point where the customer's transformer bank is attached to the end of the service extension. The city will determine the length along the shortest practical route which is not in conflict with any previous plan to render service, and shall not be required to deviate from such previous plan of extension. The length of the extension will be computed based on the actual length of construction involved. I. In all cases the facilities provided shall be constructed in accordance with the city's specifications, and shall be the city's property up to the point of delivery. J. If more than one applicant requests service on the same extension, the guaranteed total minimum revenue or contributions-in-aid-of-construction will be apportioned among the applicants. K. In cases where service extensions cross federal, state, municipal or native lands, the applicant will be liable for all filing, easement or other required fees.

(Ord. 504, 1982)