§ 15.10.245 — Wind Energy Conversion Systems
City Code of the City of Seward, Alaska (Codified through Ordinance No. 2026-006, enacted July 27, 2026. (Supp. No. 33-1, Update 1)) · Seward City Code § 15.10.245
Corpus is an independent public-information project, not the official City of Seward website. Stable reference: corpuslaw.us/code/b8ffef2f-b815-4d89-b97e-8f5e9e7f4872
15.10.245 - Wind Energy Conversion Systems.
A. Purpose. It is the purpose of this section to establish health and safety standards for small wind energy conversion systems (WECS) as defined in this Code, and to encourage the development of small wind energy systems. B. Definitions. For purposes of this section, the following definitions shall apply unless the context clearly indicates or requires a different meaning: Wind Energy Conversion System (WECS). Any device or assemblage, which directly converts wind energy into usable thermal, mechanical, or electrical energy, including such devices as windmills and wind turbines, towers and supporting structures and such directly connected facilities as generators, alternators, inverters, batteries, and associated equipment. This system is designed as a secondary accessory use to existing principal uses and to existing buildings or facilities, wherein the energy generated is used primarily for consumption on the same or adjoining parcel on which it is located. Small Wind Energy Conversion System. A Wind Energy Conversion System that has a rated power capacity of not more than 100kW and is intended to produce energy primarily for on-site consumption, either instead of or as a supplement to public utility power. Total height, freestanding WECS. The distance measured from the preexisting natural grade to the highest point of any blade of the turbine. Total height, roof-mounted WECS. The distance measured from the building height to the highest point of any blade of the turbine. Wind turbine. A device which converts the kinetic energy of the wind into a rotational energy transmitted through a drive train to a generator and where the generated power can be connected directly to the load or feed. C. Approval process. WECS are subject to a building permit under Seward City Code chapter 12.05, codes of technical regulation, and a building permit shall be obtained prior to construction, installation or modification of the system. The Building Official shall review each building permit for compliance with the requirements of this section. The Building Official shall grant approval if they are satisfied that the standards of this section have been met, that the applicant has sized and sited the system to reduce impacts onsurrounding properties to the maximum extent feasible, and that the WECS is not otherwise prohibited by law. The applicant shall provide the Building Official documentation that the WECS meet the requirements of this section, including: 1. A description of the project, including the maximum rated power output capacity of the WECS. 2. The make, model, an illustrative photograph or brochure, manufacturer's specifications including noise decibels data for the proposed WECS, Manufacturer's Guaranteed Maximum Sound Power Level in dBA re 1pW, the support structure and method of attachment to the ground and/or structure. 3. Foundation plans designed for the installation location of the WECS and be stamped by an engineer licensed in the State of Alaska. 4. Elevation drawing of the WECS showing total height, turbine dimensions, tower and turbine colors, distance between ground and lowest point of any blade, and if proposed, the location of ladders, climbing pegs, and access doors. 5. Site plans showing the installation location, including any related components, and the location of other structures, fences or retaining walls on the property. 6. For roof-mounted WECS, the owner must provide the City with certification from an engineer licensed in the State of Alaska that the roof is built to accommodate the system. 7. If the WECS is not certified as meeting the IEEE1547 standard (Institute of Electrical and Electronic Engineers), then an assessment of potential electromagnetic interference with microwave, radio, television, personal communication systems and other wireless communication is required. 8. A visual impact analysis of the proposed WECS as installed, which shall include color photographs of the proposed site from at least three locations accurately depicting the existing conditions. A computerized photographic simulation, demonstrating any visual impacts from strategic vantage points, is desirable and may be required at the Building Official's discretion. The applicant shall indicate any visual screening proposed to be incorporated into the project that is intended to lessen the system's visual prominence. 9. Evidence of compliance with Federal Aviation Administration requirements. D. Zoning and lot requirements. Monopole, guyed, lattice, vertical access and roof-mounted WECS are allowed outright as a secondary use in all zoning districts if they meet the following requirements and adhere to all requirements listed in this section. Only one WECS is permitted per lot in all zoning districts. E. Development and design requirements. The requirements of this section shall apply to all WECS. 1. The turbine to be constructed as a component of the WECS must be approved by the Small Wind Certification Program recognized by the American Wind Energy Association (AWEA) or any other accredited organization such as the Small Wind Certification Council, National Wind Technology Certification Center, or the U.S. Department of Energy, National Renewable Energy Laboratory or must be certified by a professional mechanical engineer licensed in the State of Alaska as a system that meets or exceeds industry safety standards for small wind energy systems. 2. The total height limitations for WECS for secondary use are as follows: a. Freestanding WECS. i. In RR, R1, R2, R3, UR, OR, AC, HC, CB and P, WECS are allowed as an outright use with a total height not to exceed 150 feet. ii. In I, RM and INS WECS with total height not exceeding 300 feet may be permitted. b. Roof-mounted WECS. i. In all zoning districts WECS on buildings of 34 feet or less in total height, roof-top WECS shall have a total height not to exceed 20 feet. c. Both freestanding and roof-mounted WECS. i. Structures shall not interfere with Federal Aviation Administration Regulations on airport approaches. ii. In no case shall the total height of the WECS exceed manufacturer's specifications. 3. Minimum blade ground clearance in all zoning districts is 15 feet. 4. All portions of any WECS, including guy wires and other anchors, shall comply with the following setback standards unless otherwise specified: a. All WECS shall be set back from all property lines at least 1.1 times the height of the system, except that the setback from a lot edge abutting a lake or pond may be one-half the total height of the system. b. All WECS shall be set back from all property lines so that noise generated by the system shall not exceed the 10:00 p.m. through 7:00 a.m. decibel levels set forth in Table 1, section 9.25.020, at the closest property line to the system, as calculated with the following formula for a 6dB doubling decay curve: S;sub§\sub;=10^((L w +L u + L;sub§\sub;+ -.5-S 1 )/20) Where: S;sub§\sub; - Acoustic Setback Distance in Feet L w - Manufacturer's Guaranteed Maximum Sound Power Level, in dBA re 1pW L u - Uncertainty Factor = 5 L;sub§\sub; - Safety Factor = 2 S 1 - Sound Level Limit c. All WECS shall be located so that the principal structure is between the WECS and the front or side property line. d. All systems shall be set back at least 1.1 times the total height of the system from all overhead power and telecommunication lines, aboveground electric and telecommunication equipment and any telecommunication towers. e. All portions of any WECS, including guy wires and other anchors, shall comply with the setback standards for the lot as shown on Table 15.10.220, development requirements. No part of the WECS may extend into any access or utility easements. 5. The rotating turbine shall not produce vibrations that are humanly perceptible beyond the property lines of the site not to exceed the decibel level in Table 1, section 9.25.020. Those who violate this provision will be subject to the penalties and remedies found in section 9.25.035. 6. All portions of the WECS shall be a nonreflective, nonobtrusive color, subject to the approval of the Community Development Department. The appearance of the turbines, towers and any other related components shall be maintained throughout the life of the WECS pursuant to industry standards. 7. All power and telemetry lines from the tower to any building or other structure shall be placed underground and an as-built indicating the locations will be provided to the Building Department. 8. No tower shall be illuminated unless required by a State or Federal agency, such as the FAA. 9. No commercial advertisements, signs, or other messages shall be placed or painted on any portion of the WECS; except that a system's or tower's manufacturer's logo, inspection tags, the owner's emergency contact information and appropriate warnings as required by national, State and local laws may be displayed on a system generator housing in an unobtrusive manner. 10. WECS structure shall be designed to prevent unauthorized external access to electrical and mechanical components and shall have access doors that are kept securely locked. No climbing pegs or tower ladders shall be located closer than 12 feet to the ground level at the base of the structure. 11. The installation of a WECS may not enlarge, increase or expand a nonconforming use or structure. F. Maintenance. A WECS shall be erected and maintained plumb, level, and true and shall be repaired, painted, and maintained in accordance with this section, any manufacturer's recommendations and instructions, manufacturer's and inspector's repair and maintenance schedules and with industry standards for WECS. The Building Official may order the repair or removal of any WECS that is not maintained in accordance with this section. The Building Official may also order that the WECS cease operating until satisfied that the WECS meets maintenance and operating standards. An inspection of the WECS components by a recognized Wind Turbine Inspection firm is required every five years and following a natural disaster. A tag indicating the firm and date of the last inspection must be displayed on the WECS. G. Nuisances; removal. 1. Any WECS that is not operated on a functional basis for a period of 12 months is hereby declared, unlawful, abandoned, and a public nuisance. In addition to other remedies provided by this title, the nuisance may be restrained, enjoined, or otherwise abated by the City. 2. Demolition permits are required before a person removes a WECS. The permit shall require the entire system be removed (foundations to below natural grade, collection, connection, and transmission equipment) and disposed of properly at the owner's sole expense. H. Enforcement; abatement. 1. Failure to maintain a WECS is a violation of this title. 2. The City may issue an enforcement order under chapter 9.20, public nuisances for the repair or removal of any WECS that is not operated on a functional basis for a period of 12 months or where the WECS becomes a hazard to the safety of persons or property. 3. Where the system presents no immediate hazard to health or safety, the owner shall repair or remove the system within 15 days of receipt of notification of the enforcement order. Upon agreement in writing that the owner will comply with an enforcement order to repair or remove the system if allowed additional time, the City may grant an extension of time within which to abate the public nuisance, if the City determines that such an extension of time will not create or perpetuate a situation dangerous to life or property. If the WECS is not operational or is not removed after 15 days from the date of notification of the enforcement order, or after the time of any extension provided, the City may remove the system at the owner's expense. 4. Where the City identifies an immediate health or safety hazard, and when the owner or other person responsible for the system is either not available to immediately remedy the hazard or refuses to remedy the hazard, the City may enter upon the property and disconnect, dismantle, or otherwise remove any WECS. The City shall attempt to notify any owner or other person responsible for the system of such action within 48 hours. For purposes of this section, notice is effective the earlier of posting the notice on the property, personal delivery, or upon receipt, if sent by certified mail. 5. The costs and expenses incurred by the City in abatement of any health and/or safety hazard or of any nuisance as defined in subsection 15.10.245 H. shall be chargeable to the owner and/or may be collected in a civil action by the City. 6. A person aggrieved by an enforcement order may appeal under section 15.10.410.
(Ord. No. 2010-004, § 1, 10-11-2010; Ord. No. 2026-001, 1, 1-26-2026)
Ask a question about Seward law
Corpus searches the Seward sections it holds and shows the ones that match, with their citations. Free, no sign-in.