§ 15.10.250 — Commercial communications towers
City Code of the City of Seward, Alaska (Codified through Ordinance No. 2026-006, enacted July 27, 2026. (Supp. No. 33-1, Update 1)) · Seward City Code § 15.10.250
Corpus is an independent public-information project, not the official City of Seward website. Stable reference: corpuslaw.us/code/8da50bd1-e30a-414f-85c6-ddbaec0f0676
15.10.250 - Commercial communications towers.
A. Purpose. The purpose of this section is to establish a process, rules, and standards for the siting and construction of wireless communication facilities to: 1. Protect and promote public health, safety and welfare; 2. Ensure that facilities are compatible with adjacent land uses; 3. Provide guidelines for the siting and design of communication facilities; 4. Protect the City's environmental and economic resources including the viewshed; 5. Minimize the number of towers by encouraging the colocation of facilities and maximizing the use of existing structures; 6. Provide for the ability of communications companies to enhance wireless coverage and capacity services for the City's residents, businesses, and visitors. B. Supplemental definitions. 1. Total height. The distance as measured from the ground at the preexisting natural grade to the topmost point of the entire tower and attachments. 2. Equipment. Refers to satellite dishes, antennas, and other wireless electronics intended to transmit and/or receive commercial communication signals. 3. Stealth facility. Any tower/facility designed to make the structure look like something other than a wireless facility. C. Permitting. The planning commission may approve a conditional use permit for a communications tower in the AC, HC, CB, I, RM, and INS zoning districts, subject to the conditions in this section and sections 15.10.220, 15.10.320. 1. The application for a conditional use permit for a communications tower shall include the following information: a. A written narrative explaining why the proposed site has been chosen, why the communications tower is necessary, why the requested height was chosen, and a full explanation regarding the communication tower's ability to accommodate other providers; b. Specifications for the communications tower and all equipment to be located on it, including a description of design characteristics and material; c. A site plan drawn to scale showing property boundaries, communication tower location, communication tower height, guy wires and anchors and existing structures and land uses on the site and on adjacent property; d. A map showing the locations of the applicant's existing communications towers that serve customers within the City, the proposed new communications tower, expected changes to the applicant's existing coverage and capacity within the City, and/or other improvements to wireless service; e. A report prepared by a person registered as a structural engineer in Alaska showing the structural capacity of the communications tower, the equipment type and number to be installed, and that the communications tower and antennas are designed to withstand winds in accordance with the latest revision of ANSI/EIA/TIA-222 standards ("Structural standards for steel communications antenna towers and communications antenna supporting structures"); f. Identification of the person or persons who will own the communication tower and the equipment that is to be located on it; g. Written authorization for the application from the owner of the site; h. Evidence that the applicant has a valid FCC license for the use of the communications tower; i. A line of sight analysis showing the potential visual and aesthetic impacts of the communications tower on adjacent residential districts through the use of photo simulations of the communications tower, including all antennas, structures, and equipment, using three vantage points and photo simulations from locations requested by the planning department; j. A written agreement, on a form approved by the city attorney, to remove the communications tower and restore the site to its original condition, and consistent to the natural grade, within 180 days after the communications tower is substantially unused for a period of 12 consecutive months, and providing that if the communications tower is not removed within this 180-day period, the City may remove the communications tower at the cost of the owner; k. Any additional information required by the planning department during the application process for determination that all applicable zoning laws are met. 2. For permits issued under subsection (1) of this section, the applicant must show all applicable conditions are met as follows: a. Location and visual impacts. (i) The proposed location shall minimize the visual impact on the surrounding area while allowing the communications tower to function in accordance with minimum standards imposed by the applicable communications regulations and the applicant's technical design requirements. (ii) Communications towers and attached antennas and equipment must be a color that blends with the surrounding environment or complementary to the viewshed. Muted colors, earth tones, and subdued hues, such as gray, are preferable. All associated structures such as equipment buildings, including the roofs, shall be painted with earth tone colors unless otherwise required under this code or other applicable law. (iii) Where necessary to make a communications tower compatible with the historical, environmental or cultural character of its location, the planning commission may require that the communications tower be stealth facility, hidden, or integrated as an architectural feature of a structure, to reduce its visual impact. b. Inability to collocate. (i) The applicant must show that it is not feasible to locate the proposed communications antenna and equipment on an existing structure within the area required for service. New towers shall be designed to allow collocation of an equal number of facilities to the applicants present and reasonably foreseeable future requirements. (ii) A communications tower shall not be approved if it is located within one-half mile (2,640 feet) of an existing communications tower, unless the applicant certifies that the existing communications tower does not meet the applicant's structural specifications and technical design requirements, or that a collocation agreement could not be obtained. c. Setbacks and safety. (i) In all allowable zoning districts, a communications tower must be located no less than a distance equal to the factor of 1.1 of the tower height from any lot line; or the towers highest engineered breaking point, as certified from a person registered as a structural engineer in Alaska. (ii) The tower and facilities will be fenced for security and screening purposes, fencing shall be a minimum of six feet in height. Landscaping may be required as additional screening buffer between land uses. (iii) The structure and accessory facilities shall meet all applicable laws and code requirements including but not limited to health, nuisance, noise, fire, building, and safety code requirements. d. Zoning requirements. With the exception for those requirements, established within this section, the commercial communications tower must comply with all applicable zoning laws and regulations, including all laws governing land development, parking, lot size, and storage. e. Signs. No signs may be located on a communications tower except for identification signage, and safety signage as required by law, regulation, and standards. f. Lighting. No lighting may be located on a communications tower except as reasonably required for safety purposes or as required by the Federal Communications Commission, Federal Aviation Administration or other government agency with jurisdiction. g. Height. The height of a communications tower may not exceed the maximum tower height specified in the conditional use permit or in this section. h. Towers located on existing buildings. A communications tower may be mounted on an existing building, as long as it does not extend more than 30 feet above the roofline and the applicable conditions of this section have been met. For example, if a building was constructed to its maximum allowed height of 34 feet in a zone, a communications tower/antenna may be placed on it provided that it is not more than 30 feet above the highest part of the building. i. Variances to development requirements may be granted pursuant to applications as provided for in section 15.10.325. 3. For permits issued under subsection (1) of this section, a. No decision regulating the placement, construction or modification of a communications tower may be made on the basis of environmental or health effects of radio frequency emission if the antennas and other equipment on the communications tower comply with Federal Communications Commission regulations. b. All permit applications shall be processed in a timely manner under the circumstances and not unreasonably delayed. c. Denial of any permit application shall be in writing and supported by substantial evidence. d. Appeals to the board of adjustment in the case where an application has been denied shall be made pursuant to section 15.10.410.
(Ord. No. 2020-012, § 1, 10-12-2020)
Ask a question about Seward law
Corpus searches the Seward sections it holds and shows the ones that match, with their citations. Free, no sign-in.
