For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.25.040 — Administration

City Code of the City of Seward, Alaska (Codified through Ordinance No. 2026-006, enacted July 27, 2026. (Supp. No. 33-1, Update 1)) · Seward City Code § 15.25.040

Corpus is an independent public-information project, not the official City of Seward website. Stable reference: corpuslaw.us/code/47d7c450-4d22-4396-aaaf-f883a56a9261

15.25.040 - Administration.

A. Designation of the floodplain administrator. The city manager or designee is hereby appointed to administer, implement and enforce this ordinance by granting or denying development permits in accordance with its provisions. The floodplain administrator may delegate authority to implement these provisions. B. Duties and responsibilities of the floodplain administrator. Duties of the floodplain administrator shall include, but not be limited to: 1. Permit review. Review all development permits to determine that: a. The permit requirements of this chapter have been satisfied; b. All other required state and federal permits have been obtained; c. The site is reasonably safe from flooding; d. In areas where a floodway has not been designated, require that no new construction, substantial improvements or other development (including fill) shall be permitted within Zones A1-30 and AE unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. 2. Use of other base flood data. When base flood elevation data has not been provided in accordance with Section 15.25.030(B), the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation data available from a federal, state or other source, in order to administer section 15.25.050. Any such information shall be consistent with the requirements of the Federal Insurance Administrator. 3. Obtain and maintain for public inspection. Obtain and maintain the following for public inspection and make available as needed: a. Certification required by section 15.25.050(A)(3)(a) (lowest floor elevations for all structures, bottom of the lowest horizontal structural member (if applicable), and service facilities/mechanical equipment); b. Certification required by section 15.25.050(A)(3)(b) (lowest floor elevations or floodproofing of non-residential structures and service facilities/mechanical equipment); c. Certification required by section 15.25.050(A)(3)(d) (engineered flood openings); d. Certification required by section 15.25.050(F)(1) (floodway encroachments); e. Records of all variance actions, including justification for their issuance; f. Improvement and damage calculations. 4. Notification to other entities. a. Whenever a watercourse is to be altered or relocated, notify adjacent communities and the State Coordinating Office prior to such alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administrator through appropriate notification means, and assure that the flood carrying capacity of the altered or relocated portion of said watercourse is maintained. b. Base flood elevations may increase or decrease resulting from physical changes affecting flooding conditions. As soon as practicable, but not later than six months after the date such information becomes available, the floodplain administrator shall notify the Federal Insurance Administrator of the changes by submitting technical or scientific data in accordance with Volume 44 Code of Federal Regulations Section 65.3. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements will be based upon current data. c. Notify the Federal Insurance Administrator in writing of acquisition by means of annexation, incorporation or otherwise, of additional areas of jurisdiction. 5. Remedial actions. Take actions on violations of this chapter as required in Section 15.25.030(F) herein. C. Establishment of development permit. 1. Development permit shall be obtained before construction or development begins within any special flood hazard area established in Section 15.25.030(B). 2. Application for a development permit may be made on forms furnished by the floodplain administrator and may include, but not be limited to, plans in duplicate drawn to scale showing the nature, location, dimensions and elevation of the area in question, existing or proposed structures, fill, storage of materials, drainage facilities and the location of the foregoing. Specifically, the following information is required: a. For A Zones (A, A1-30, AE, AH, AO): i. Proposed elevation in relation to mean sea level of the lowest floor (including basement) of all structures. In Zone AO, elevation of existing highest adjacent grade and proposed elevation of lowest floor of all structures; ii. Proposed elevation in relation to mean sea level to which any non-residential structure will be floodproofed; iii. Certification by a registered professional engineer or architect that the floodproofing methods for any non-residential structure meet the floodproofing criteria in section 15.25.050(A)(3)(b); and iv. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. b. For V Zones (VE, V1-30 and V): i. Proposed elevation in relation to mean sea level of the bottom of the lowest structural member of the lowest floor (excluding pilings and columns) of all structures, and whether such structures contain a basement; ii. Base flood elevation data for subdivision proposals or other development, including manufactured home parks or subdivisions, greater than 50 lots or five acres, whichever is the lesser; and iii. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. D. Issuing a development permit. 1. Upon determination that the submitted and recorded information connected with the permit application meets the terms of this chapter, the administrative official shall issue a floodplain development permit to the original applicant. 2. If the project involves the construction of a residential structure in a special flood hazard area, the planning department floodplain management office will issue an initial permit based on the building plans in the application. A final permit will be issued after the applicant submits an elevation certificate and floodplain management staff determines that the building is in compliance with all floodplain regulations. 3. The floodplain development permit shall be valid until the expiration date provided that the start of construction occurs within 180 days of the permit issue date. If construction does not begin within this time period, the permit will expire 180 days from the issue date. The floodplain administrator shall be notified at least three days prior to start of construction for possible site inspection and notice-to-proceed. 4. The flood plain permit shall be valid for the extent of the project for which it was issued. 5. The floodplain development permit is not assignable without permission from the administrator. 6. The city may charge fees for permits and variances. Fees shall be established by resolution of the city council to be paid by the applicant at the time that the floodplain development permit application is submitted.

(Ord. 98-11; Ord. No. 2023-009, § 4, 4-10-2023)

Ask a question about Seward law

Corpus searches the Seward sections it holds and shows the ones that match, with their citations. Free, no sign-in.