§ 7-70 — Introduction
Code of Ordinances of the City of Auburn, Alabama (Codified through Ordinance No. 3567, enacted January 20, 2026. (Supp. No. 91)) · Auburn Code of Ordinances § 7-70
Corpus is an independent public-information project, not the official City of Auburn website. Stable reference: corpuslaw.us/code/d777ec46-613a-40b3-88ce-cbbe7664aaf4
Sec. 7-70. - Introduction.
During the construction process, soil is highly vulnerable to erosion by wind and water. Eroded soil endangers water resources by reducing water quality and causing the siltation of aquatic habitat for fish and other desirable species. Eroded soil also necessitates repair of sewers and ditches and the dredging of lakes. In addition, clearing and grading during construction cause the loss of native vegetation necessary for terrestrial and aquatic habitat. The purpose of this policy is to safeguard persons, protect property, and prevent damage to the environment in Lee County, Alabama. This policy will also promote the public welfare by guiding, regulating, and controlling the design, construction, use, and maintenance of any applicable activity that disturbs or breaks the topsoil or results in the movement of earth on land in the City of Auburn. Additionally, this policy reinforces the need for those sites less than one acre in size to be classified as "Permit by Rule" construction sites required to implement and maintain best management practices until land disturbing activities have ceased and permanent stabilization has been achieved.
(Ord. No. 2742, § 1, 1-17-12)
Ask a question about Auburn law
Corpus searches the Auburn sections it holds and shows the ones that match, with their citations. Free, no sign-in.
