§ 7-76 — Erosion and sediment control criteria

Code of Ordinances of the City of Auburn, Alabama (Codified through Ordinance No. 3567, enacted January 20, 2026. (Supp. No. 91)) · Auburn Code of Ordinances § 7-76

Corpus is an independent public-information project, not the official City of Auburn website. Stable reference: corpuslaw.us/code/f6d05176-9696-489e-a940-47dd88e68093

Sec. 7-76. - Erosion and sediment control criteria.

(a) Grading, erosion control practices, sediment control practices, and waterway crossings shall meet the design criteria set forth in the most recent version of the Alabama Handbook for Erosion Control, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas (AL Handbook), and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the authority and in accordance with the authority's standard details and specification. (b) Clearing and grading of natural resources, such as forests and wetlands, shall not be permitted, except when in compliance with all other federal, state, and local regulations. Clearing techniques that retain natural vegetation and drainage patterns, as described in the AL Handbook, shall be used to the satisfaction of the authority. (c) Buffers shall be in accordance with the requirements in Section 4.4.7 of the Water Resource Management Design and Construction Manual and Section 413 of the City of Auburn Zoning Ordinance. (d) Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and have been stabilized. Phasing shall be required on all sites disturbing greater than ten (10) acres, with the size of each phase to be established at plan review and as approved by the authority. All areas that have been cleared of significant portions of its vegetative cover and will remain so for thirteen (13) days or longer without appreciable construction activity shall be seeded and mulched within five (5) days of being disturbed. (e) Erosion control requirements shall be as defined in Section 4.2.3 of the Water Resource Management Design and Construction Manual. (f) Waterway and watercourse protection requirements shall include but are not limited to the following: (1) The installation of a temporary watercourse crossing. If a watercourse will be crossed regularly during construction the authority may require a temporary crossing to be constructed in order to prevent streambed damage and/or erosion. Watercourse crossings shall be constructed to allow movement of aquatic life. (2) Stabilization of the watercourse channel before, during, and after any in-channel work. (3) All on-site stormwater conveyance channels designed according to the criteria outlined in the AL Handbook. (4) Stabilization adequate to prevent erosion located at the outlets of all pipes and paved channels. (g) Construction site access requirements shall include but are not limited to the following: (1) Temporary construction access, as defined by the authority, at all sites. (2) Other measures required by the authority in order to ensure that sediment is not tracked onto public streets by construction vehicles or washed into storm drains. (h) Building floor elevations. All building floor elevations, garages and carports shall be one foot or higher above the expected 100-year flood elevation. Ground elevation ten (10) feet from a building shall be six (6) inches or more below floor elevation and slope away from the building. Impervious surfaces should have a slope of one-half of one (0.5) per cent or greater and pervious surfaces of two (2) per cent or greater.

(Ord. No. 2742, § 1, 1-17-12)

Ask a question about Auburn law

Corpus searches the Auburn sections it holds and shows the ones that match, with their citations. Free, no sign-in.