For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-7-16 — Plans required

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-7-16

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/efc010c2-bfb2-43c5-af27-132705969175

Sec. 4-7-16. - Plans required.

(a) Each application for a soil erosion and sediment control permit shall be accompanied by three sets of BMP plans and specifications and, if required, supporting data and affidavits prepared and signed by a registered architect, landscape architect, civil engineer, geologist, geotechnical engineer or environmental manager. (b) Each application for a soil erosion and sediment control permit, except applications related to the construction of an individual single family residence, shall require a soil erosion and sediment control plan ("control plan"). (c) A drainage plan shall be required as set out in section 207. (d) Soil engineering and engineering geology reports will be required if deemed necessary by the city engineer, owner's architect, landscape architect or civil engineer and/or may also be required by the city engineer in fragile, complex or hazardous areas as provided in section 208.

(Ord. No. 88-148, § 1(206), 10-7-1988; Ord. No. 99-131, § 1(205), 7-15-1999)

Ask a question about Birmingham law

Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.