For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-9-2 — Purpose and intent

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-2

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/93fef6b3-498c-4c46-b734-47f941ec3963

Sec. 4-9-2. - Purpose and intent.

(a) The primary intent of this chapter is promoting the health, safety, and general welfare of the citizens of the City of Birmingham, Alabama, and to minimize public and private losses due to flood conditions through the regulation of stormwater discharges from land developments. (b) This chapter establishes methods for controlling the discharge of pollutants from land developments to the city's municipal separate stormwater system ("MS4") and local waterways in order to comply with requirements of the National Pollutant Discharge Elimination System ("NPDES") permit, required by the federal Clean Water Act, 33 U.S.C. § 1251 et seq. (1972), and supported by the Alabama Water Pollution Control Act, Code of Alabama 1975, § 22-22-1. (c) This chapter establishes methods for controlling stormwater volume and peak discharges from land developments in order to minimize public and private losses due to poor drainage or flood conditions. (d) The objectives of the post construction stormwater ordinance are: (1) To minimize or, if possible, eliminate the contribution of pollutants to the MS4 from, or caused by, stormwater discharges from new land developments or redevelopments; (2) To regulate the volume and peak discharge of stormwater discharges from new land developments or redevelopments; (3) To provide for adequate long-term operation and maintenance of the structural practices installed to comply with this chapter and the City of Birmingham's NPDES MS4 Phase 1 Permit. (4) To establish legal authority to require the plans and permits, and carry out all inspections, surveillance, monitoring, and enforcement, necessary to ensure compliance with this chapter and the City of Birmingham's NPDES MS4 Phase 1 Permit.

(Ord. No. 19-31, § 1, 3-29-2019)

Ask a question about Birmingham law

Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.