For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-9-6 — Applicability

Code of Ordinances of the City of Birmingham, Alabama (Supp. No. 3: codified through Ordinance No. 20-107, enacted June 29, 2020) · Birmingham Code of Ordinances § 4-9-6

Corpus is an independent public-information project, not the official City of Birmingham website. Stable reference: corpuslaw.us/code/b93dd218-4906-4e7a-830b-fd01c01f0877

Sec. 4-9-6. - Applicability.

This chapter applies to all proposed land development (whether new development or redevelopment, whether public or private) that: (a) Will result in a land disturbance of one acre or greater; (b) Will result in a land disturbance of less than one acre, but is part of a larger common plan of development or sale that will, or already has, disturbed one acre or greater of land; (c) Will result in a land disturbance of less than one acre but is determined by the director to warrant additional engineering analysis and/or stormwater management controls, based on one or more of the following circumstances; or (1) The proposed land development is located on a property that is considered a brownfield or is otherwise known or believed to have pollutants in the soil or on the ground that, if discharged from the property in stormwater or groundwater, may cause harm to the general public or the environment. (2) The proposed land development that will, after development, discharge stormwater to a waterbody that is included on the most recent Alabama § 303(d) List, or for which a Total Maximum Daily Load ("TMDL") has been approved by the United States Environmental Protection Agency ("USEPA"). (3) The proposed land development will, after development, discharge stormwater to a waterbody that is classified by the Alabama Department of Environmental Management ("ADEM") for Public Water Supply, as an Outstanding National Resource Water, as an Outstanding Alabama Water, or as a Treasured Alabama Lake, and the director, in consultation with the chief civil engineer - watersheds and city engineer, using sound engineering judgement, has reason to believe that unregulated stormwater discharges from the land development may adversely affect the waterbody. (4) The proposed land development is located on, or will, after development, discharge stormwater to an area that has been designated by the United States Fish and Wildlife Service ("USFWS") as critical habitat for one or more threatened or endangered species, or where the USFWS has identified one or more threatened or endangered species are located. (5) A history of flooding or drainage problems is known to exist in, or downstream of, the drainage basin where the premises is located, whether documented or undocumented. (6) An engineering study prepared by a professional engineer licensed in the State of Alabama indicates a need for more stringent regulation of stormwater in the watershed where the proposed land development is located in order to avoid, or alleviate, any flood, drainage, or pollution problems. (7) The director, in consultation with the chief civil engineer - watersheds and city engineer, has reason to believe, using sound judgment, that the proposed land development may further exacerbate existing flood or drainage problems as a result of development or redevelopment on the property.

(Ord. No. 19-31, § 1, 3-29-2019)

Ask a question about Birmingham law

Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.