Sec. 6.1. - Required improvements.
A. Prior to the approval of the final plat, the subdivider shall have installed, caused to be installed, or constructed (or posted bond as provided for in section 6.2 of this article) all required improvements, including the following: 1. All streets shall have been graded in conformity with all dimensional and design requirements set out in article 5, above. 2. On both sides of each street there shall have been constructed a standard curb and gutter or valley gutter in accord with standard details on file in the office of the city engineer. 3. On all streets, including side streets and alleys, a suitable hard surfaced permanent type of pavement shall be installed, meeting the requirements of the City of Birmingham standard specifications. The developer's engineer shall design a pavement buildup based on a 20-year design life, on existing soil conditions and anticipated traffic. 4. Any off-road bike paths and/or pedestrian ways shall have been paved with a suitable hard surfaced material meeting the requirements of the City of Birmingham Standard Specifications, latest edition. 5. All required utilities and service connections shall have been constructed prior to installation of paving with all mains being extended and all lots having sufficient utility service stub-outs to ensure no subsequent cutting of pavement. All required utilities, except storm and sanitary sewer systems, shall be constructed beyond the back of sidewalk. Where septic tanks are necessary, if required by the responsible county agency or other sewer authority, sanitary sewers shall also be installed and capped until such time as connection may be had with a sanitary sewer system. 6. All required sidewalks shall have been constructed. 7. Adequate storm sewers shall have been constructed, subject to the provisions of article 5. 8. Subdividers shall have installed or paid for street signs and streetlights, and traffic control signals or similar signage as approved by and at points designated by the traffic engineer. 9. All right-of-way grading and required public improvements, including necessary seeding, and removal of debris from all public areas, shall have been completed. B. The owner(s) shall also submit an instrument, approved by the city attorney, in form for recording, which offers an irrevocable dedication of all lands and improvements into governmental ownership as needed and designated on the final plat for public use, including any streets, ways, easements, utilities, grounds and parks, in perpetuity.
Ask a question about Birmingham law
Corpus searches the Birmingham sections it holds and shows the ones that match, with their citations. Free, no sign-in.