§ 23-135.17 — Compliance and reporting program
City Code of the City of Decatur, Alabama (Codified through Ordinance No. 24-4600, adopted December 16, 2024. (Supp. No. 37)) · Decatur City Code § 23-135.17
Corpus is an independent public-information project, not the official City of Decatur website. Stable reference: corpuslaw.us/code/2416d9c5-9252-4717-9e11-ff00a2942c52
Sec. 23-135.17. - Compliance and reporting program.
The purpose of the compliance and reporting program is to insure all category 2I, 2FS, 3, 3A, and as appropriate category 4, users are meeting the terms of their permits, authorizations, and/or contracts for the protection of the wastewater treatment system, human health, safety and the environment. There are four major components of the compliance and reporting program: (1) Self monitoring reports. a. Self-monitoring reports are required for users in category 2I, 3, 3A, and as appropriate category 2FS and 4. Self-monitoring reports shall contain information necessary to determine compliance with conditions and limitations of the user's permit, authorization or condition. Reports may include the results of sampling and analysis of the discharge, including the flow and the nature and concentration, or production and mass, where requested by the board or general manager, of pollutants contained therein which are limited by the applicable pretreatment standards or this article. The frequency of monitoring and reporting shall be prescribed in the permit, authorization, or contract and will reflect applicable pretreatment standard, other wastewater discharge permit and/or as otherwise prescribed by the approval authority. Copies of self-monitoring reports and all information and documents utilized for their preparation, including laboratory analyses, bench sheets, and quality assurance/quality control information must be kept by the user for a period of five (5) years. b. All analyses shall be performed in accordance with procedures established by the approval authority pursuant to section 304(g) of the Act and contained in 40 CFR, part 136 and amendments thereto or with any other test procedures approved by the approval authority. Sampling shall be performed in accordance with the techniques approved by the approval authority. c. Discharge monitoring reports. Users who are required to submit a self-monitoring (DMR) report, either monthly or quarterly, to ADEM as designated in their SID permit must submit a copy of the DMR report to the general manager so that it is received no later than the twenty-eighth day following the monitoring period covered. d. Category 2FS users are not required to submit a monthly, self-monitoring report unless required to do so by the board. e. Any other user may be required to submit self-monitoring reports in a frequency established by the general manager and containing such information as the general manager or board may deem necessary and appropriate. Reporting frequency and parameters may be set forth in any permit, authorization, or contract. f. Failure to submit such report will be a breach of the executed contract and could result in enforcement action. (2) Compliance evaluation inspections. All users are subject to compliance evaluation inspections (CEI). The purpose of CEIs is to insure compliance with applicable conditions and limitations in permits, authorizations, or contracts, representative sampling, sampling and analysis in accordance with requirements of 40 C.F.R. Part 136, and the proper operation of any pretreatment facilities specified for any user in category 2I, category 2FS and category 3, category 3A and category 4 users, as appropriate. These inspections are a "walk-through" type and do not involve effluent sampling. These inspections should confirm that all required facilities are in place and being properly operated. A CEI may be done concurrently with the compliance sampling inspection (CSI) described below. All category 3, 3A, 2I, 2FS and 4 facilities will receive a CEI, and/or CSI, annually. (3) Compliance sampling inspection. a. The purpose of the compliance sampling inspection (CSI) is to insure that the provisions of this article are being complied with, and to protect the board's sewer and wastewater system. Compliance sampling inspection is necessary to determine the nature of constituents discharged by users to the board's sewer and wastewater system. b. Any user is subject to a CSI. A CSI for those industrial users in specific categories may be required in cases of interference, pass through, or upset at the board's wastewater treatment plant. c. Users will be contacted by a representative of the board or general manager at the inception of a CSI. d. For category 3, 3A or 2I users, the user will be required to take samples from the user's wastewater discharge and conduct or obtain laboratory analysis for the sample at a frequency specified by the general manager and for parameters specified by the general manager. e. All sampling and analysis must meet applicable technical and professional standards. For wastewater sampling and analysis, all activities must meet the requirements of 40 C.F.R. Part 136, which is incorporated by reference into this article. Analytical parameters will include all parameters contained in the user's permit, authorization, or contract, if one exists; parameters addressed in this article, and any other parameter which is: 1. Contained in the priority pollutant scan referred to in 40 C.F.R. Part 136 and Clean Water Act National Pollutant Discharge Elimination system (NPDES) application requirements; 2. Which the board or general manager reasonably believes may be present in the user's wastewater, or 3. Which may have caused or have the potential to cause pass through or interference or other upset of the board's wastewater treatment system. f. The board or general manager may require respirometry testing as part of the sampling and analysis. Respirometry testing may utilize the POTW biomass as control while determining the affect of the proposed waste stream on the oxygen uptake rate of the control in accordance with Part 2710 B., Standard Methods for the Examination of Water and Wastewater, 18th edition, 1992, American Public Health Association, 1015 15th Street, NW., Washington, DC 20005. g. The board or general manager reserves the right to split samples and run an independent confirmatory laboratory analysis of the user's wastewater. Nothing in this section affects the board and general manager's right to conduct random sampling of a user's discharge. h. All costs of CSI sampling will be borne by the user. The board and general manager will be responsible for any random sampling or split samples taken at the user's facility. i. CSIs are anticipated to involve multiple samples over a one month period to ensure compliance in light of variability of processes and wastewater discharges. j. Representatives of the board or general manager shall be permitted reasonable access to all user facilities for the purpose of conducting activities relating to the CSI, which may include observation and inspection of processes, treatment facilities, materials handling, monitoring and laboratory facilities, and related records and other information in the user's possession. k. Representatives of the board or general manager may submit written questions or requests for information from any user relating to compliance with the user's permit, authorization, or contract, any requirement of this article, or any state or federal law relating to wastewater discharge. l. Copies of CSI reports and all information and documents utilized for their preparation, including laboratory analyses, bench sheets, and quality assurance/quality control information must be kept by the user for a period of five (5) years. (4) Compliance tracking program. a. The purpose of the compliance tracking program (CTP) is to insure that the provisions of this article are being complied with, and to protect the board's sewer and wastewater system, and obtain additional information regarding users with multiple exceedences, instances of noncompliance, or with wastewater high in strength for pollutants which could harm the board's wastewater plant. Compliance tracking is necessary to determine the nature of constituents discharged by users to the board's sewer and wastewater system over a longer period of time. b. Any user in non-compliance with its permit, authorization, contract, or this article is subject to the CTP. Additionally, users which have the potential to discharge constituents which could alone or in conjunction with other discharges cause or contribute to pass through, interference, or upset at the board's wastewater treatment plant are subject to the CTP. c. Users will be contacted by a representative of the board or general manager at the inception of a CTP. d. Upon being placed on the compliance tracking program, users must establish compliance. The user will be sampled monthly for a period of time up to three (3) consecutive months. If non-compliance continues, the user may be continued on the CTP for a subsequent three-month period. If there has been no significant non-compliance with any discharge parameter, the user will be sampled only once in the next quarter. If the user continues in compliance, it will be sampled once during the following six (6) months. If the user is in compliance at this sampling, it will revert to the sampling frequency established in the permit, authorization, or contract so long as compliance is maintained. If at any time, sample results indicate a significant non-compliance situation, the user will be placed on a monthly CSI schedule and may be required to repeat the CTP again and shall be required to establish compliance through the procedure described above. e. Results of self monitoring may also be used in determining compliance so long as sampling and analytical methods meet the requirements of this article. f. Copies of CTP reports and all information and documents utilized for their preparation, including laboratory analyses, bench sheets, and quality assurance/quality control information must be kept by the user for a period of five (5) years. g. Nothing in this subsection affects the board and general manager's authority to bring enforcement actions or seek such other relief as provided by law against a user. (5) Significant non-compliance. Any user that meets one or more of the following criteria shall be considered in significant noncompliance: a. Chronic exceedence of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of all the measurements taken during a six-month period exceed (by any magnitude) the daily maximum limit or the average limit for the same parameter. b. Technical review criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of all the measurements for each pollutant parameter taken during a six-month period equal or exceed the product of the daily maximum limit or the average limit multiplied by the applicable TRC (TRC=1.4 for fats, oil and grease, and 1.2 for all other parameters except pH). c. Any other exceedence of a pretreatment effluent limit (daily maximum or longer-term average) that the control authority determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of POTW personnel or the general public). d. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare, or to the environment, or has resulted in the POTW exercising its emergency authority under paragraph 40 CFR Part 403.8(f)(l)(vi)(B) to halt or prevent such a discharge. e. Acute exceedence of a wastewater discharge limit by greater than twice the concentration or mass loading established by a permit, authorization, or contract. f. Exceedence of the maximum allowable concentration for pollutants identified in section 23-135. g. Failure to comply with any condition of a permit, authorization, or contract for three (3) consecutive reporting periods or greater. h. Any discharge to the wastewater collection and treatment system without a permit, authorization, or contract where such permit, authorization, or contract is required by this article. i. Failure to operate, maintain, or implement treatment, management practices, or other activities necessary to controlling pollutants in the discharge to the board's sewer and wastewater treatment system. j. More than one (1) instance of non-compliance as set forth in subsection (6) below. Provided, however, that the general manager may determine based upon the totality of circumstances that an event or events which would otherwise constitute significant non-compliance as set forth herein does not warrant categorization as significant non-compliance. (6) Noncompliance. Any other failure to meet any requirement of this article or any permit, authorization, or contract issued pursuant to this article. Noncompliance includes but is not limited to the following: a. Failure to meet a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance. b. Failure to provide any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self monitoring reports, and reports on compliance with compliance schedules. c. Failure to meet any condition or limitation of any permit, authorization or contract. d. Failure to accurately report noncompliance. e. Any other violation(s) which the board and/or general manager determines will adversely affect the operation or implementation of the board and/or general manager's pretreatment program. f. Any exceedence not defined as significant-non-compliance. Provided, however, that the general manager may determine based upon the totality of circumstances that an event or events which would otherwise constitute compliance as set forth herein does not warrant categorization as non-compliance.
(Ord. No. 08-3954, § 1, 7-7-08)
Ask a question about Decatur law
Corpus searches the Decatur sections it holds and shows the ones that match, with their citations. Free, no sign-in.
