§ 23.135.14 — Permits, authorizations and contracts
City Code of the City of Decatur, Alabama (Codified through Ordinance No. 24-4600, adopted December 16, 2024. (Supp. No. 37)) · Decatur City Code § 23.135.14
Corpus is an independent public-information project, not the official City of Decatur website. Stable reference: corpuslaw.us/code/34b8c950-502b-4183-88e4-620e7e83ab55
Sec. 23.135.14. - Permits, authorizations and contracts.
The basis for regulating discharges from category 3, 3A, and where necessary and appropriate category 2I, 2FS and 4 to the board's wastewater collection and treatment system will be through permits, authorization letters, or contracts between the user and the board. SID permits will be issued and enforced by ADEM but are not directly controlled by the board, however, the general manager may incorporate by reference SID permits or their limits or conditions into a permit, authorization, or contract. The general manager may establish local limits which shall be incorporated into SID permits for users in accordance with the procedures established by ADEM and EPA pursuant to the federal pretreatment regulations. Where the board or general manager determines that a contract is necessary or appropriate to meet the purposes of this article, the board will execute contracts with users. These contracts will specifically identify all pretreatment requirements to be enforced by the board that the user must meet and will provide the board and general manager with authority to require the user to comply with all provisions of this article including all federal, state and other provisions incorporated by reference. Users may be subject to other state and federal or local pretreatment or other requirements not included in the board's contract. Should a user be required to construct a pretreatment facility to meet the purposes of this article, such a requirement and a schedule for completion of such facility will be included as an enforceable portion of the user's permit, authorization, or contract. Failure to meet such requirement and schedule is grounds for termination of a contract, injunction, damages, or such other remedies as provided by law, and, where it may constitute a violation of this article, enforcement, injunction, or other relief. (1) Application. a. Application information. Users required to obtain authorization for a discharge to the board's wastewater collection and treatment system shall complete and file with the board all appropriate information. Proposed new users must file an application in the form prescribed by the board, an Industrial wastewater Survey, and such other information as is required by the general manager. Proposed new users shall apply at least ninety (90) days prior to connecting to or contributing to the board's wastewater collection and treatment facilities. In support of the application, the user shall submit, in units and terms appropriate for evaluation, all information supplied to the state relating to the wastewater or waste, as well as all information characterizing such waste or wastewaters that is available to or has been provided to the user or proposed user. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information: 1. Name, address, and location. 2. NAIC and SIC number according to the North American Industry Classification system and Standard Industrial Classification Manual, Bureau of Budget, 1972, as amended. 3. Except as otherwise approved by the general manager, information and data regarding all wastewater constituents and their range of concentration in wastewater, and other characteristics of wastewater including but not limited to those in division 2 of this article. All wastewater constituents and characteristics reported shall be the result of representative sampling and include analytical results as determined by a certified analytical laboratory, acceptable to the city and approval authority. Sampling and analysis shall be performed in accordance with procedures and methods established by the EPA pursuant to section 304(g) of the Act and contained in 40 CFR, Part 136, as amended. 4. Time and duration of wastewater contribution. 5. Average daily and peak wastewater flow rates, including any daily, monthly, or seasonal variations. 6. Details locating all sewers, sewer connections, and appurtenances by size, location and elevation, including domestic sewers if separate from industrial sewers. 7. Description of plant facilities and processes including treatment on the premises including all materials which are or could be discharged; if the user proposes to discharge wastewater from other sources, a description of plant facilities, processes and treatment. 8. The nature and concentration range of any known pollutants in the discharge which are limited by city, state, or federal pretreatment regulations, and a statement regarding whether or not the categorical pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance and/or additional pretreatment is required for the user to meet applicable pretreatment standards. 9. If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: i. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment facilities required for the user to meet the applicable pretreatment standards. ii. The user shall submit annual progress reports to the city including, as a minimum whether or not the user has complied with his proposed schedule; and, if not, the date which it expects to return to the proposed schedule and reasons for delay. 10. Each product produced by type, amount, process or processes and rate of productions. 11. Type and amount of raw materials processed (average and maximum per day). 12. Number and type of employees, and hours of operation of plant, and proposed or actual hours of operation of pretreatment system. 13. Any other information as may be deemed by the city to be necessary to evaluate the permit application. The city and approval authority will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished by the user, a wastewater discharge permit, authorization, or contract may be issued or entered into subject to terms and conditions provided in this article. The board and general manager may, upon request by the user or proposed user, waive any of the application requirements set forth above where adequate existing information is available to the general manager. b. Application fees. Users required to obtain a wastewater discharge permit, authorization or contract shall submit with an application a fee of fifty dollars ($50.00). This fee is due and payable at the time of initial application and also at the time of permit, authorization, or contract renewal. c. Existing users. Existing users shall submit an industrial wastewater survey in application for a wastewater discharge permit within thirty (30) days after the effective date of this article, as provided in subsection 23-135.13. Proposed new users shall submit a permit application at least ninety (90) days prior to connecting to or contributing to the POTW. d. Prohibitions. Users are prohibited from increasing the volume, concentration, or loading of its discharge from normal operations. Users wishing to increase flow, volume, concentration, loading, or change from normal operations shall follow the procedures for new users and receive a modified permit, authorization, or contract as appropriate for the change in discharge. e. Certification of information. All information required to be submitted pursuant to this subsection shall be accompanied by the certification set forth in subsection 23-135.18. f. Additional information. The general manager will evaluate the data furnished by the user or proposed user and may require additional information. After evaluation and acceptance of the data furnished, the general manager may issue a permit, authorization, or contract subject to terms and conditions required by the board. (2) Conditions. Permits, authorizations and contracts shall be expressly subject to all provisions of this article and all other applicable regulations. Permits, authorizations and contracts are subject to user charges and fees established by the board and general manager, and may contain the following conditions: a. The unit charge or schedule of user charges and fees for the wastewater to be discharged to a community sewer may be specified in the permit, authorization, or contract or may be established by separate fee schedule established by the general manager and as revised from time to time; b. Effluent limits, including best management practices, based on applicable general pretreatment standards in CFR 40 Part 403, categorical pretreatment standards, local limits, and state and local law, and may include limits on the average and maximum wastewater constituents and characteristics, limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; and other limits on flow rate, concentration, loading, or any other limit or prohibition deemed necessary by the general manager; c. Requirements for installation and maintenance of inspection and sampling facilities; d. Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule; identification of the pollutants to be monitored; requirements for additional monitoring in case of exceedence or other noncompliance or in cases of interference, pass through, or upset at the board's wastewater treatment plant; notification and recordkeeping requirements; identification of the pollutants to be monitored based on the federal pretreatment regulations; and other such conditions as necessary in the best professional judgment of the general manager; e. Requirements to maintain and operate treatment facilities and/or implement management practices regarding the discharge or potential discharges to the board's wastewater collection and treatment system; f. Compliance schedule; g. Requirements for submission of technical reports or discharge reports; h. Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the board, and affording board access thereto; i. Requirements for notification of the board of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; j. Requirements for notification of slug discharges; k. Requirements for the modification, revision, revocation or reissuance; l. Requirements to comply with the permit, authorization, or contract and all other provisions of this article. m. Other conditions as deemed appropriate by the board to ensure compliance with this article. Contracts may include conditions and limitations not specified in this article as deemed necessary and appropriate by the board and general manager to protect health, safety and welfare; the environment; and/or the wastewater collection and treatment system. (3) Duration. Permits, authorizations or contracts shall be issued for a specified time period, not to exceed five (5) years. A permit or authorization may be issued for a period of less than a year or may state the specific date of expiration. A minimum of one hundred eight (180) days prior to the expiration of the user's existing permit, the user shall apply for renewal of the contract. The terms and conditions of the contract may be subject to modification by the board during the term of the contract as limitations or requirements as identified in division 2 are modified or other just cause exists. The user shall be informed of any proposed changes in his permit at least thirty (30) days prior to the effective date of the change. Any changes or new conditions in the permit shall include a time schedule for compliance. (4) Transfer. Permits, authorizations and contracts are issued to a specific user for a specific operation and discharge. A wastewater discharge permit, authorization or contract shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without the express written approval of the board. users must notify the general manager of a change in ownership (e.g. transfer of ownership, assets, acquisition) in writing and may be required to resubmit application information. Any succeeding owner or user shall also comply with the terms and conditions of the existing contract until such time as board has issued a new permit, authorization or contract to the succeeding owner or user. (5) Confidential information. Information and data on a user obtained from reports, questionnaires, permit applications, permits and monitoring programs and from inspections shall be available to the public or other governmental agency without restriction unless the user specifically requests and is able to demonstrate to the satisfaction of the board that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets of the user. When so requested by the person furnishing a report and upon justification of such claim, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public but shall be made available upon written request to governmental agencies for uses related to this article, the NPDES, the SID and/or pretreatment programs or as otherwise required by law; provided, however, that such portions of a report shall be available for use by the state or any state agency in judicial review or enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other factual information provided by any user regarding wastewater or its impact the wastewater collection and treatment system will not be recognized as confidential information. The board shall not transmit to any governmental agency or to the general public information accepted by the board as confidential, until and unless a ten-day notification is given to the user or as otherwise provided by law. (6) Monitoring facilities. Category 2I, 3 and 3A users shall provide and operate, at the user's own expense, all required monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage system and any monitoring facilities as may be required pursuant to a permit, authorization, or contract. The monitoring facility shall normally be situated in the user's premises, but the board may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area with the required, appropriate permission from the city and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. The monitoring facility shall normally be situated in the right-of-way or easement area. Upon a determination by the general manager, category 2FS and 4 users may be required to provide monitoring facilities as specified in this subsection at their own expense. (7) Inspection and sampling. The board may inspect the facilities of any user to ascertain whether the user is complying with all requirements and the purpose of this article is being met. Persons or occupants of premises where wastewater is created or discharged shall allow the board or its representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination or in the performance of any of their duties. The board and the approval authority shall have the right to set up on the user's property such devices as are necessary to conduct sampling inspection, compliance monitoring and/or metering operations. Where a user has security measures in force which would require proper identification and clearance before entry into their premises, the user shall make necessary arrangements with their security guards so that upon presentation of suitable identification, personnel from the board, approval authority and EPA will be permitted to enter, without delay, for the purposes of performing their specific responsibilities. (8) Determination of pretreatment requirements, conditions, and other limitations. After the user is placed in one of the categories previously described, requirements for category 2I, 3, 3A, and 4 users must be determined. The general manager will make such determinations considering the information provided by the user or proposed user, or other information which may be available to the board. If available, the determination will consider actual data from analysis of plant influent and effluent, sludge analysis, and the characteristics of the water body receiving the plant effluent; pollutant loadings from all significant industrial discharges and best professional judgment based on literature search and/or EPA published estimates. Where appropriate the determination will be made in coordination with ADEM. Effluent limits for priority/categorical pollutants will be in accordance with those promulgated by EPA and ADEM, unless more stringent or additional limits and/or conditions, management and operational practices are necessary to protect the board's wastewater collection and treatment system, to prevent pass through, interference, or otherwise satisfy the purposes of this article.
(Ord. No. 08-3954, § 1, 7-7-08)
Ask a question about Decatur law
Corpus searches the Decatur sections it holds and shows the ones that match, with their citations. Free, no sign-in.
