§ 25-31 — Administration

City Code of the City of Decatur, Alabama (Codified through Ordinance No. 24-4600, adopted December 16, 2024. (Supp. No. 37)) · Decatur City Code § 25-31

Corpus is an independent public-information project, not the official City of Decatur website. Stable reference: corpuslaw.us/code/1a27861a-153b-4a0a-89fc-21819a22366e

Sec. 25-31. - Administration.

(a) Designation of floodplain administrator. The director is hereby appointed to administer and implement the provisions of this ordinance. The director shall hereto after be referred to as the floodplain administrator in this ordinance. The director may delegate any authority under this ordinance to any professional level subordinate staff. (b) Permit procedures. Application for a floodplain development permit shall be made to the floodplain administrator on forms approved by the community prior to any development (any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment or materials) in the SFHAs of the community, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the elevations of the area of development and the nature, location, and dimensions of existing or proposed development. Specifically, the following procedures and information are required for all projects in the SFHA or other designated floodplains within the jurisdiction of the City of Decatur: (1) Application stage. Plot plans are to include: a. The BFEs where provided as set forth in section 25-32(b) and (c); b. Boundary of the special flood hazard area and floodway(s) as delineated on the FIRM or other flood map as determined in section 25-30(b); c. Flood zone designation of the proposed development area as determined on the FIRM or other flood map as set forth in section 25-30(b); d. Elevation in relation to mean sea level (or highest adjacent grade) of the regulatory lowest floor elevation, including basement, of all proposed structures; e. Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed; f. Design certification from a professional engineer, who is licensed to practice in the State of Alabama, or a licensed architect, who is registered to practice in the State of Alabama, that any proposed non-residential flood-proofed structure will meet the flood-proofing criteria of section 25-32(b)2. and (e)2.; g. A foundation plan, drawn to scale, that shall include details of the proposed foundation system to ensure all provisions of this ordinance are met. These details include, but are not limited to, the proposed method of elevation (i.e., fill, solid foundation perimeter wall, solid backfilled foundation, open foundation on columns/posts/piers/piles/shear walls) and description of any flood openings required in accordance with section 25-32(b)1. and (b)3. when solid foundation perimeter walls are used. h. Usage details of any enclosed areas below the lowest floor shall be described. i. Plans and/or details for the protection of public utilities and facilities such as sewer, gas, electrical, and water systems to be located and constructed to minimize flood damage. j. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development including current and proposed locations of the watercourse. An engineering report shall be prepared by a professional engineer, who is licensed to practice in the State of Alabama, on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream. The affected properties shall be depicted on a map or on the plot plan. k. Certification of the plot plan by a professional engineer or surveyor, who is licensed to practice in the State of Alabama, is required. l. In any lot or lots/areas that will be or have been removed from the special flood hazard area utilizing a letter of map revision based on fill (LOMR-F), the top of fill elevation must meet the community's freeboard elevation at that location. If the top of fill elevation is below the freeboard elevation, all new structures, additions to existing buildings or substantial improvements must meet the required community freeboard elevation. (2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the floodplain administrator an as-built certification of the regulatory floor elevation or flood-proofing level using appropriate FEMA elevation or floodproofing certificate immediately after the lowest floor or flood-proofing is completed. In addition: a. When flood-proofing is utilized for non-residential structures, said certification shall be prepared by professional engineer, who is licensed to practice in the State of Alabama, or architect, who is registered to practice in the State of Alabama. b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. c. The floodplain administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed. Failure to submit certification or failure to make the required corrections, shall be cause to issue a notice of violation and/or stop-work order for the project. d. The floodplain administrator shall make periodic inspections of projects during construction throughout the SFHAs within the jurisdiction of the community to ensure that the work is being done according to the provisions of this ordinance and the terms of the permit. Members of the inspections/engineering department shall have a right, upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction of the City of Decatur during normal business hours of the community for the purposes of inspection or other enforcement action. e. The floodplain administrator may revoke and require the return of the floodplain development permit by notifying the permit holder in writing stating the reason(s) for the revocation. Permits shall be revoked for any departure from the approved application, plans, and specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any floodplain development permit mistakenly issued in violation of an applicable state or local law may also be revoked. (3) Finished construction. Upon completion of construction, a FEMA elevation certificate (FEMA Form 81-31 or equivalent), which depicts all finished construction elevations, must be submitted to the floodplain administrator prior to issuance of a certificate of occupancy. a. If the project includes a floodproofing measure, a FEMA floodproofing certificate must be submitted by the permit holder to the floodplain administrator. b. The floodplain administrator shall review the certificate(s) and the data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to certificate of compliance/occupancy issuance. c. In some instances, another certification may be required to certify corrected as-built construction. Failure to submit the certification or failure to make required corrections shall be cause to withhold the issuance of a certificate of compliance/occupancy. d. Documentation regarding completion of and compliance with the requirements stated in the permit application and with section 25-31(b)1. of this ordinance shall be provided to the local floodplain administrator at the completion of construction or records shall be maintained throughout the construction stage by inspectors for the floodplain administrator. Failure to provide the required documentation shall be cause to withhold the issuance of a certificate of compliance/occupancy. e. All records that pertain to the administration of this ordinance shall be maintained in perpetuity and made available for public inspection, recognizing that such information may be subject to the Privacy Act of 1974, as amended. (c) Duties and responsibilities of the floodplain administrator. The floodplain administrator and his/her designated staff is hereby authorized and directed to enforce the provisions of this ordinance. The floodplain administrator is further authorized to render interpretations of this ordinance, which are consistent with its spirit and purpose. Duties of the floodplain administrator shall include, but shall not be limited to: (1) Require permits for all proposed construction or other development in the community, including the placement of manufactured homes, so that it may be determined whether such construction or other development is proposed within flood-prone areas. Ensure the public is aware that floodplain development permits are required for development in SFHAs. (2) Conduct regular inspections of the community's SFHAs for any unpermitted development and issue stop work orders and notice of violations for any such development. Any unpermitted structure or non-structural development in the SFHA will be considered a violation until such time that the violation has been remedied. (3) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently with floodplain development permit file. (4) Review all permit applications of proposed development, to determine whether the proposed construction or other development will be reasonably safe from flooding and to assure compliance with this ordinance. a. If the provisions of this ordinance have been met, approve the permit. b. If the provisions of this ordinance have not been met, request that either corrections or accurate completion of the application be made or disapprove the permit. (5) When BFE data or floodway data have not been provided in accordance with section 25-30(b) then the floodplain administrator shall obtain, review and reasonably utilize any BFE and floodway data available from a federal, state, or other sources in order to administer the provisions of section 25-32. (6) Verify and record the actual elevation of the lowest floor, in relation to mean sea level (or highest adjacent grade), including basement, of all new construction or substantially improved residential structures in accordance with section 25-31(b)2. a. Review elevation certificates and require incomplete or incorrect certificates to be corrected and resubmitted for approval. b. A post-construction elevation certificate is required to be kept with the permit and certificate of occupancy in perpetuity; a pre-construction elevation certificate can be used to ensure the correct elevation for the lowest floor and machinery along with the correct number of vents that will be used. (7) Verify and record the actual elevation, in relation to mean sea level to which any new or substantially improved non-residential structures have been elevated or floodproofed, in accordance with section 25-31(b), or section 25-32(b)2. and (e)2. (8) When floodproofing is utilized for a non-residential structure, the floodplain administrator shall obtain certification of design criteria from a professional engineer, licensed to practice in the State of Alabama, or licensed architect, registered to practice in the State of Alabama, in accordance with section 25-31(b)1. and section 25-32(b)2. or (e)2. (9) Notify adjacent communities and the Alabama Department of Environmental Management and the appropriate district office of the U.S. Army Corps of Engineers prior to any alteration or relocation of a watercourse. Submit evidence of such notification to FEMA and the NFIP State Coordinator's Office (Alabama Department of Economic and Community Affairs, Office of Water Resources). (10) For any altered or relocated watercourse, submit engineering data/analysis within six (6) months after completion of the project to FEMA and state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained following completion of the project. (11) Where interpretation is needed as to the exact location of boundaries of the SFHA (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the floodplain administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this ordinance. (12) All records pertaining to the provisions of this ordinance shall be maintained, in perpetuity, at the office of the floodplain administrator and shall be available for public inspection when requested. (13) For any improvements made to existing construction located in the SFHA (as established in section 25-30(b)) ensure that a permit is obtained. Also, conduct Substantial Improvement (SI) (as defined in section 25-34 of this ordinance) reviews and analysis of all structural development permit applications. Maintain a record of the SI calculations and comments within the permit files in accordance with subsection (c)(11) of this section. (14) For any residential and nonresidential structures located in the SFHAs that are damaged from any source, natural hazard or man-made, conduct substantial damage (SD) (as defined in section 25-34 of this ordinance) assessments. a. The floodplain administrator shall ensure that permits are obtained, in accordance with this ordinance, prior to any repairs commencing. b. Make SD determinations whenever structures within the SFHA area are damaged by any cause or origin. SD determinations shall not be waived to expedite the rebuilding process during a post-disaster recovery or for any other reason. c. If the community has a large number of buildings in their SFHA that have been damaged, they should decide in advance how best to handle permitting and inspecting damaged buildings for substantial damage determinations. d. If required, a moratorium may be placed on all non-disaster related construction permits until the community has sufficiently completed its SD determinations. e. The SD determinations should be performed immediately after the damage-causing event or other cause of damage. f. The community shall utilize methods and tools for collecting building data and performing analyses that will provide reasonable and defensible SD determinations. Those tools shall be capable of generating reports for record-keeping purposes and to provide to the applicable property owners if requested. g. Maintain a record of the SD calculations within permit files in accordance with subsection (c)(11) of this section. h. If the SD determination finds that the extent that the cost of restoring the structure to its before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred, the floodplain administrator shall: (i) Coordinate with the property owner and issue a letter to convey the SD determination. (ii) Determine if the damage was caused by flooding and include the cause in the letter to the property owner. Also, include whether or not the structure qualifies as a repetitive loss structure per the definitions in section 25-34 of this ordinance. The information can be used to determine if the claim is eligible for an increased cost of compliance claim. (iii) Coordinate with property owners and insurance companies for any NFIP claims. (iv) If the repairs are to proceed, coordinate with the permit applicant to ensure a permit is obtained and inspections are conducted to ensure that all applicable provisions of this ordinance are adhered to without exception or waiver. i. A structure qualifies as a repetitively damaged structure (synonymous to repetitive loss property) if it's determined to have been damaged by flooding two (2) or more times within a 10-year period where the cost of repairing the flood damage, on average, equaled or exceeded twenty-five (25) percent of its market value at the time of each flood event. All of the provisions of section 25-31(c)(13) for substantial damages shall apply to any repetitively damaged structure, whether it is covered by NFIP flood insurance or not. If the structure is located within a SFHA and NFIP flood insurance claims were paid for each of the two (2) flood losses then the structure is eligible for an increased cost of compliance (ICC) claim. The following procedures shall be performed by the community to track repetitive losses and provide documentation necessary for an ICC claim: (i) Maintain permit records of all reconstruction and repairs for flood damages; (ii) Record the date of repairs for a particular building so that the repair history can be checked before the next permit is issued; (iii) Record the flood-related cost to repair the building and the market value of the building before the damage occurred for each flood event; and (iv) Issue a letter of notice of determination to the owner of the structure. j. Ensure that phased improvements and incremental repairs do not circumvent the SI/SD requirements. k. Ensure that any combinations of elective improvements being made in addition to the necessary repairs to damages are included in making the SI/SD determination. l. An applicant for a permit may appeal a decision, order, or determination that was made by the local official for the following: (i) The local official's finding or determination that the proposed work constituting a SI/SD were based on insufficient information, errors, or repair/improvement costs that should be included and/or excluded; (ii) The local official's finding or determination that the proposed work constituting a SI/SD were based on inappropriate valuations of costs for the proposed work, or an inappropriate method to determine the market value of the building. m. It is not appropriate for a permit applicant to seek an appeal who wishes to build in a manner that is contrary to the regulations and codes included in this ordinance. In those cases, the applicant should seek a variance. n. Ensure that any building located in a floodway that constitutes a SI/SD has an engineering analysis performed in accordance with section 25-32(c)2. If that analysis indicates any increase in the BFE, the local official must not allow the proposed work unless the structure is brought into full compliance with this ordinance. (15) Coordinate with insurance adjusters prior to permitting any proposed work to bring any flood-damaged structure covered by a standard flood insurance policy into compliance (either substantially damaged structures or repetitive loss structures) to ensure eligibility for ICC funds. (16) Right of entry. a. After the certificate of occupancy has been issued for a building and the floodplain administrator observes or has reasonable cause to believe that renovations or retrofits have been made to the building, structure, or premises located in a SFHA that appear to be in violation of any provisions of this ordinance, he/she shall have the right to seek entry into that building as described in subsection (b) to (e) below. b. Whenever it becomes necessary to make an inspection to enforce any of the provisions of this ordinance, the floodplain administrator may enter such building, structure or premises at all reasonable times (normal business hours for the community) to inspect the same or perform any duty imposed upon the floodplain administrator by this ordinance. c. If such building or premises are occupied, the floodplain administrator shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he/she shall first make a reasonable effort to locate the owner or other persons having charge or control of such building or premises prior to entry. d. If entry is refused or owner cannot be located, the floodplain administrator shall have recourse to every remedy provided by law to secure the right of entry of the building, structure, or premises. e. When the floodplain administrator shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the floodplain administrator for the purpose of inspection and examination pursuant to this ordinance.

(Ord. No. 24-4577, § 1, 2-5-24)